Revised Schedule of Items.docx

DOCX document 26 KB Posted

Attached to
IDIQ for Road Program Activities -- Road Maintenance and Other Services -- Chattahoochee National Forest, Georgia
Solicitation number
AG-435H-S-12-0013
Issued by

About this file

Revised Schedule of Items (does not include maps)

View the file

Other files

File Type Posted
Contract Award Information.docx DOCX document
Revised PWS 811 and 834.pdf PDF
Amdt 1 Roads IDIQ.pdf PDF
Change Date for PreProposal Conference.docx DOCX document
7 Experience Questionnaire.docx DOCX document
8 contractor performance survey.doc DOC document
6 WD 74-1218 Forestry 6-13-2011.pdf PDF
4 Performance Work Statement.pdf PDF
5 road_mtc drawings.pdf PDF
2 SF 1449.pdf PDF
3 Schedule of Items.docx DOCX document
1 Solicitation AG-435H-S-12-0013.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items – revised 3/26/11

Seed Project 1 – Conasauga District Total $_____________

Map is attached. Locations for ditch cleaning and spot surfacing will be staked in the field.

Performance time: 14 calendar days Forest Service Road 231, Bowater

Work Item
Quantity
Unit of Measure
Method of Measure*
Unit Cost
Total Cost
811(3)Surface Maintenance Level 3 roads
2.3
Single Lane Mile
CC
834 (4) Clean Roadside Ditches
2.0
miles
CC
813 (3) Spot Surfacing Gradation # 57
54
tons
VQ
Subtotal
$

Forest Service Road 231A, Bowater Spur

Work Item
Quantity
Unit of Measure
Method of Measure*
Unit Cost
Total Cost
811(3)Surface Maintenance Level 3 roads
0.6
Single Lane Mile
CC
834 (4) Clean Roadside Ditches
0.6
miles
CC
Subtotal
$

Forest Service Road 233, Gentry

Work Item
Quantity
Unit of Measure
Method of Measure*
Unit Cost
Total Cost
811(3)Surface Maintenance Level 3 roads
0.75
Single Lane Mile
CC
834 (4) Clean Roadside Ditches
0.5
miles
CC
813 (3) Spot Surfacing Gradation # 57
54
tons
VQ
Subtotal
$

Solicitation AG-435H-S-12-0013 Road Program Activities 1

Seed Project 2 – Blue Ridge District Total $_____________

Map is attached. Locations for ditch cleaning and spot surfacing will be staked in the field. Apply surfacing on the road at a rate of 400 tons/mile for the #57 stone and 1,000 tons/mile for the GAB.

Performance time: 30 calendar days Forest Service Road 69, Rock Creek

Work Item
Quantity
Unit of Measure
Method of Measure*
Unit Cost
Total Cost
811(3)Surface Maintenance Level 3 roads
8.0
Single Lane Mile
CC
834 (4) Clean Roadside Ditches
8.0
miles
CC
813 (3) Spot Surfacing Gradation # 57
1600
tons
VQ
813 (3) Spot Surfacing Gradation # GAB
4,000
tons
VQ
Subtotal
$

Forest Service Road 4, Mulky Gap

Work Item
Quantity
Unit of Measure
Method of Measure*
Unit Cost
Total Cost
811(3)Surface Maintenance Level 3 roads
8.0
Single Lane Mile
CC
834 (4) Clean Roadside Ditches
8.0
miles
CC
Subtotal
$

* Method of Measure (Projects 1 and 2):

CC – Contract Quantity – will not be field measured
VQ – Vehicle Quantity – measured by weight tickets

File details come from the government source that posted it. Updated .