Schedule of Items – revised 3/26/11
Seed Project 1 – Conasauga District Total $_____________
Map is attached. Locations for ditch cleaning and spot surfacing will be staked in the field.
Performance time: 14 calendar days Forest Service Road 231, Bowater
| Work Item |
| Quantity |
| Unit of Measure |
| Method of Measure* |
| Unit Cost |
| Total Cost |
| 811(3) | Surface Maintenance Level 3 roads |
| 2.3 | |
| Single Lane Mile | |
| CC | |
| 834 (4) Clean Roadside Ditches |
| 2.0 |
| miles |
| CC |
| 813 (3) Spot Surfacing Gradation # 57 |
| 54 |
| tons |
| VQ |
Forest Service Road 231A, Bowater Spur
| Work Item |
| Quantity |
| Unit of Measure |
| Method of Measure* |
| Unit Cost |
| Total Cost |
| 811(3) | Surface Maintenance Level 3 roads |
| 0.6 | |
| Single Lane Mile | |
| CC | |
| 834 (4) Clean Roadside Ditches |
| 0.6 |
| miles |
| CC |
Forest Service Road 233, Gentry
| Work Item |
| Quantity |
| Unit of Measure |
| Method of Measure* |
| Unit Cost |
| Total Cost |
| 811(3) | Surface Maintenance Level 3 roads |
| 0.75 | |
| Single Lane Mile | |
| CC | |
| 834 (4) Clean Roadside Ditches |
| 0.5 |
| miles |
| CC |
| 813 (3) Spot Surfacing Gradation # 57 |
| 54 |
| tons |
| VQ |
Solicitation AG-435H-S-12-0013 Road Program Activities 1
Seed Project 2 – Blue Ridge District Total $_____________
Map is attached. Locations for ditch cleaning and spot surfacing will be staked in the field. Apply surfacing on the road at a rate of 400 tons/mile for the #57 stone and 1,000 tons/mile for the GAB.
Performance time: 30 calendar days Forest Service Road 69, Rock Creek
| Work Item |
| Quantity |
| Unit of Measure |
| Method of Measure* |
| Unit Cost |
| Total Cost |
| 811(3) | Surface Maintenance Level 3 roads |
| 8.0 | |
| Single Lane Mile | |
| CC | |
| 834 (4) Clean Roadside Ditches |
| 8.0 |
| miles |
| CC |
| 813 (3) Spot Surfacing Gradation # 57 |
| 1600 |
| tons |
| VQ |
| 813 (3) Spot Surfacing Gradation # GAB |
| 4,000 |
| tons |
| VQ |
Forest Service Road 4, Mulky Gap
| Work Item |
| Quantity |
| Unit of Measure |
| Method of Measure* |
| Unit Cost |
| Total Cost |
| 811(3) | Surface Maintenance Level 3 roads |
| 8.0 | |
| Single Lane Mile | |
| CC | |
| 834 (4) Clean Roadside Ditches |
| 8.0 |
| miles |
| CC |
* Method of Measure (Projects 1 and 2):
| CC – Contract Quantity – will not be field measured |
| VQ – Vehicle Quantity – measured by weight tickets |