4 Performance Work Statement.pdf
PDF 452 KB Posted
- Solicitation number
- AG-435H-S-12-0013
About this file
Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract Award Information.docx | DOCX document | |
| Revised Schedule of Items.docx | DOCX document | |
| Revised PWS 811 and 834.pdf | ||
| Amdt 1 Roads IDIQ.pdf | ||
| Change Date for PreProposal Conference.docx | DOCX document | |
| 7 Experience Questionnaire.docx | DOCX document | |
| 8 contractor performance survey.doc | DOC document | |
| 6 WD 74-1218 Forestry 6-13-2011.pdf | ||
| 5 road_mtc drawings.pdf | ||
| 2 SF 1449.pdf | ||
| 3 Schedule of Items.docx | DOCX document | |
| 1 Solicitation AG-435H-S-12-0013.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation AG-435H-S-12-0013
Performance Work Statement for Road Program Activities
Chattahoochee National Forest
807 EQUIPMENT RENTAL
811 SURFACE MAINTENANCE
813 SPOT SURFACING
814 ASPHALT SURFACE MAINTENANCE
832 LOAD, HAUL, AND PLACE MATERIALS
833 DRAINAGE STRUCTURE INSTALLATION OR REMOVAL
834 ROADWAY DRAINAGE SYSTEM MAINTENANCE
841 DISTURBED AREA TREATMENT
851 HAZARD AND OBSTRUCTION REMOVAL
861 MAINTENANCE of TRAFFIC GATES and BARRIERS, GUARDRAILS, and RETAINING WALLS
872 SIGN MAINTENANCE
Not all potential work is covered by this Work Statement. Other activities not included here will be described on the individual task order request.
807 EQUIPMENT RENTAL
807.01
Service Required
Furnishing and operating equipment. Availability and pricing will be determined on individual task order requests.
Equipment
Excavator
Backhoe
Grader
Crawler Tractor
Dump Truck
Brush Cutter
Drilling Rig
Roller
Trailer
Loader-mounted Rock Crusher
(Iron Wolf or equivalent)
807.02
Performance Standards
A. Equipment will be weed free before it used on National Forest System lands.
B. Make equipment available for inspection and approval before use.
807.03
Location of Work
Location of work is as specified on roads listed on the TASK ORDER ROAD LISTING, SHOWN ON THE
PLANS, or as ordered by the Contracting Officer.
807.04
Measurement
A. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the equipment is in operation.
B. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.
C. Hours of operation shall be the same as for the Service Provider’s regular work shift, unless otherwise directed in writing by the Contracting Officer.
D. Moving of equipment will be paid at the established hourly rate.
807.05
Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
PAY ITEM PAY UNIT
807(1) Equipment, Type ________ Hour
807(2) Excavator Hour
807(3) Backhoe Hour
807(4) Grader Hour
807(5) Crawler Tractor Hour
807(6) Dump Truck Hour
807(7) Brush Cutter Hour
807(8) Drilling Rig Hour
807(9) Roller Hour
807(10) Trailer Hour
809(11) Loader-mounted Rock Crusher Hour or Mile
807.06 Equipment Rental
Acceptable Quality Levels
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Weed free equipment Equipment not weed free. N/A 0 N/A Equipment rejected until it can be made weed free N/A
Maintenance of
Equipment
Equipment not capable of operating at least 90% of the time
N/A 0 N/A Replace defective equipment N/A
Equipment meets all state and federal regulations
Does not meet state and federal regulations N/A 0 N/A
Bring equipment up to state and federal regulations or replace equipment
N/A
Equipment leaks
Equipment leaks in sensitive areas or leaks that are large and not typically inherent in the specific equipment
Small leaks inherent in the specific type equipment 0 N/A
Replace equipment and restore affected site as directed by the
Contracting Officer
Place absorbent pads under equipment when not operating.
Equipment will be operated by a fully trained, qualified, and competent operator at all times.
Operator not fully trained, qualified, and competent.
N/A 0 N/A
Stop equipment operation until a fully trained, qualified, and competent operator is available. Repair any damage done by incompetent operator as directed by the
Contracting Officer
N/A
811 – SURFACE MAINTENANCE (03/21/2007)
811 SURFACE MAINTENANCE
811.01
Smooth and shape native or aggregate surfaced roads including traveled way, shoulders, turnouts, and intersections. Reshape or recondition ditches, water bars, and drain dips.
811.02
Performance Standards
A. Maintenance Level 4 and 5 Roads
A road surface is maintained to standard when the travel way is free of washboards, potholes, or other irregularities. The surface is smooth, compact, crowned or sloped to drain, without segregation of the surfacing materials. Suitable materials have been recovered and incorporated. Unsuitable materials have been removed.
Ditches and road surface drainage structures function efficiently. Unpaved shoulders are shaped to provide a smooth transition from the paved surface and drain efficiently.
B. Maintenance Level 3 Roads
A road surface is maintained to standard when the surface is compact, crowned, or sloped to drain, without segregation of the surfacing materials. The road surface has no ruts or rills, suitable materials have been recovered and incorporated. Unsuitable materials have been removed. Ditches and road surface drainage structures function efficiently.
C. Maintenance Level 2 Roads
A road surface is maintained to standard when the surface is shaped to drain, and where ditches and road surface drainage structures function efficiently. The road surface has no continuous ruts or rills, and no large concentrations of unsuitable materials remain.
D. All Roads
When ordered by the Contracting Officer to work in a weed infested area the contractor will be required to prevent spreading the infestation into un-infested areas by cleaning vehicles and equipment. The contractor will use wash stations approved by the Contracting Officer.
811.03
As specified on roads listed on the task order road listing, shown on the plans, marked on the ground, or as ordered by the Contracting Officer. Locations of weed infested areas are marked on the ground. Do not operate in the weed infested areas unless ordered to do so by the Contracting Officer.
811.04
Measurement under this Section will be made by the total number of units for each item listed in the
SCHEDULE OF ITEMS completed and accepted.
A. Single Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.
B. Double Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.
C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
811.05
The accepted quantities will be paid at the contract price per unit of measurement for the Section 811 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this
Section.
Pay Item Pay Unit
811(1) Surface Maintenance Level 4 & 5 roads Single Lane Mile
811(2) Surface Maintenance Level 4 & 5 roads Double Lane Mile
811(3) Surface Maintenance Level 3 roads Single Lane Mile
811(4) Surface Maintenance Level 3 roads Double Lane Mile
811(5) Surface Maintenance Level 2 roads Single Lane Mile
811(6) Surface Maintenance Level 2 roads Double Lane Mile
811(7) Shoulder Maintenance Road Mile
811.06 Surface Maintenance
Defect Defect Major Minor Major Minor
Surface Irregularities
(Level 4&5)
Potholes greater than 2" deep and wider than 1 foot
Potholes 2" or less deep and
1 foot or less wide 2 per
200 ft
5 per 200 ft
Rework if greater than
2 major defects *
Rework if greater than
5 minor defects
Washboards greater than 1" deep
Washboards 1” or less deep and not exceeding 20 feet long
5 per
200 ft
3 per 200 ft
Rework if greater than
5 major defects *
Rework if greater than
3 minor defects
Surface Irregularities
(Level 3)
Potholes greater than 2" deep and wider than 1 foot
Potholes 2” or less deep and 1 foot or less wide 5 per
5 per 500 feet
Rework if greater than
4 major defects *
Rework if greater than
4 minor defects
Washboards greater than 1" deep
Washboards less than 1" deep and not exceeding 20 feet long
5 per
500 feet
5 per 500 feet
Rework if greater than
4 major defects *
Rework if greater than
4 minor defects
Road Cross Section
(Level 4&5)
Crown or Cross Slope is not uniform and does not drain as specified on more than
250' of surface per mile
Crown or Cross Slope is not uniform and does not drain as specified on less than 250' of surface per mile
2 per miles Rework
Rework if greater than
2 minor defects *
Road Cross Section
(Level 3)
Crown or Cross Slope is not uniform and does not drain as specified on more than
250' of surface per mile
Crown or Cross Slope is not uniform and does not drain as specified on less than 250' of surface per mile 0 3 per mile Rework
Rework if greater than
3 minor defects *
Road Cross Section
(Level 2)
Road surface does not drain properly and causes erosion, or obstructs high clearance vehicles
Road surface does not drain properly, but does not cause erosion
0 5 per mile Rework
Rework if greater than
5 minor defects
Oversized Material
(Level 3&4 aggregate surfaced roads)
Material greater than 3" diameter remaining on the road surface
Material less than 3" road surface and traffic safety is not compromised
0 3 mile Rework
3 minor defects
Oversized Material
(Level 2)
Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles 0 1 per mile Rework
1 minor defects
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Aggregate Surface
Quality
Gradation of surface aggregate is degraded by more than 10 %
Gradation of surface aggregate is degraded by less than 10 %
1 per miles Rework
Rework if greater than
1 minor defects
A loss of more than 10
CY/mile
A loss of less than 10 CY/mile 0 1 per mile
Replace or recover lost material
Accept the loss of material surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is compromised surfacing is segregated over less than a 100 square yard area per 1000 linear feet of road and traffic safety is not compromised
0 N/A Rework Accept the loss of surface quality
Backslopes
Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
100 ‘ per mile Repair and Stabilize
Revegetate if greater than 5 minor defects *
Compaction
Visible displacement occurs under hauling or spreading equipment
N/A
0 N/A Rework N/A
Ditches and Road
Drainage Structures
Impeded flow or water diverted out of drainage structures
< 20% impeded, but water will stay in the channel 0 0 Rework Rework
Unpaved Shoulders
(Level 3, 4, & 5)
Elevation difference between pavement and shoulder is greater than 1"
Elevation difference between pavement and shoulder is less than 1"
100’ per
1000’ Rework
Rework if greater than
1 minor defects
Material greater than 1/4" road surface
Material 1/4" diameter or less remaining on the road surface and traffic safety is not compromised
100’ per
1000’
Rework if greater than
0 major defects *
Rework if greater than
0 minor defects
Does not drain away from pavement
Does not drain away from pavement 0 0 Rework Rework
Working outside of project limits Area contains invasive weeds N/A 0 N/A
Repair and treat affected areas as directed by the
Contracting Officer
813 - SPOT SURFACING (03/21/2007)
813 SPOT SURFACING
813.01
Load, haul, and place surface material to repair or stabilize road surfaces.
813.02
Performance Standard
A. Spot surfacing is complete when the designated quantity of the ordered material has been placed.
B. All materials transported onto National Forest System land will be weed-free. Written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor will be furnished to the Contracting Officer before transport of any materials onto
National Forest System land.
813.03
As specified on roads listed on the TASK ORDER ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
813.04
A. The quantity will be the number of cubic yards measured in the vehicles, or square yards of aggregate placed.
B. Material measured by the ton shall be verified by certified weight tickets.
813.05
The accepted quantities will be paid at the contract price per unit of measurement for the Section 813 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
813(1) Spot Surfacing, Gradation _____ Cubic Yard
813(2) Spot Surfacing, Gradation _____ Square Yard
813(3) Spot Surfacing, Gradation _____ Ton
813 - SPOT SURFACING (03/21/2007)
813.04 Spot Surfacing
Defect Defect Major Minor Major Minor
Depth of Aggregate
Dimension of spot surfacing deviates by more than 1" from depth specified. Or less than 1" from dimension specified but is consistently high or low.
Dimension of spot surfacing deviates by 1" or less than from depth specified and not consistently high or low. 0 N/A
If depth is low, correct placement of aggregate to specified dimensions. If depth is high only pay for ordered amount
Accept aggregate as placed, pay only for delivered quantities.
Width of Aggregate
Dimension of spot surfacing is less than specified width or more than 1' wider than specified.
Dimension of spot surfacing is up to 1' wider than specified but not consistently wide.
0 N/A
If width is narrow, correct placement of aggregate to specified dimensions. If width is too wide reshape.
Accept aggregate as placed, pay only for delivered quantities.
Length
Dimension of spot surfacing is shorter than specified length or more than 100' longer than specified.
Dimension of spot surfacing is shorter than specified length or up to 100' longer than specified. 0 N/A
If length is shorter than specified, correct placement of aggregate to specified dimensions. If too long pay only for ordered amount.
Accept aggregate as placed, pay only for delivered quantities.
Compaction
Visible displacement occurs under heady spreading equipment
N/A 0 N/A Rework N/A
Aggregate Quality
Does not meet specified gradation or durability requirements and is not suitable for intended use
Does not meet specified gradation or durability requirements and is suitable for intended use
0 N/A
Reject and replace
Accept but may reduce payment.
Material source does not meet weed free requirement N/A 0 N/A Reject source
Finish Quality
Spot surfacing doesn’t conform to the adjacent road segments and traffic is impeded.
Spot surfacing generally conforms to the adjacent road segments, but traffic may be slowed.
0 5 per miles
Reshape or recompact surfacing as needed.
Accept but may reduce payment.
814 - ASPHALT PAVEMENT PATCHING (09/10/04)
814 ASPHALT SURFACE MAINTENANCE
814.01
Repair and cleaning of pavement surfaces.
814.02
This work is complete when the pavement is clean and free of cracks, potholes, and surface irregularities.
Follow industry standards as outlined in the Asphalt Institute Manual Series Number 16.
814.03
As specified on roads listed on the TASK ORDER ROAD LISTING, SHOWN ON THE
PLANS, or as ordered by the Contracting Officer.
814.04
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Single Lane Roads: The work activity will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.
B. Double Lane Roads: The work activity will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.
C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
D. Ton: Material measured by the ton shall be verified by certified weight tickets.
E. Linear Foot: Work activity by the linear foot will be measured using standard survey methods rounded to the nearest one (1) foot.
814.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 814 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
814(1) Pothole Patching Ton
814(2) Skin Patching Ton
814(3) Crack Sealing Linear Foot
814(4) Crack Sealing Mile
814(5) Paved Surface Cleaning (Single Lane) Mile
814(6) Paved Surface Cleaning (Double Lane) Mile
814(7) Paved Surface Cleaning Each
814.05 Asphalt Pavement Patching
Defect Defect Major Minor Major Minor
Pothole
Patching
Finished elevation does not match adjoining segments by more than 1/4 inch N/A 0 N/A Rework N/A
Patched material does not properly adhere to adjacent surfaces N/A 0 N/A Rework N/A
Area to be patched is not properly prepared N/A 0 N/A Rework N/A
Skin Patching
Finished skin patch does not make smooth transition with adjoining pavement. N/A 0 N/A Rework N/A
Patched material does not properly adhere to adjacent surfaces N/A 0 N/A Rework N/A
Area to be patched is not properly prepared N/A 0 N/A Rework N/A
Crack Sealing
Crack Sealant does not completely fill the cracks greater than 1/4 inch
Crack Sealant does not completely fill the cracks 1/4 inch or less 0 10’ per 100’ Rework Accept
Crack sealant does not properly adhere to adjacent surfaces N/A 0 N/A Rework N/A
Area to be sealed is not properly prepared N/A 0 N/A Rework N/A
Surface
Cleaning
More than 5% of surface is not cleaned as specified
Less than 5% of surface is not cleaned as specified 0 0 Rework Rework
Asphalt Quality
Product and gradation does not meet
Specifications and is not suitable for job.
Product and gradation does not meet Specifications but is otherwise suitable for job.
0 0 Reject and replace
Reject and replace.
Work Area
Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0
Suspend work until in compliance
Suspend work until in compliance
832 – LOAD, HAUL, AND PLACE MATERIALS (09/10/04)
832 LOAD, HAUL, AND PLACE MATERIALS
832.01
Load, haul, and place material at designated sites.
832.02
Loading, hauling, and placing is complete when no obstruction remains in or adjacent to the roadway or in ditches which would have the potential to interfere with traffic use, block or divert water from structures or channels. This includes relocation, repositioning, stabilization, and revegetation as ordered by the
Contracting Officer.
832.03
As specified on roads listed on the TASK ORDER ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
832.04
A. Cubic Yard: The quantity will be the number of cubic yards measured in the vehicles.
B. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
832.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 832 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this
832(1) Load, Haul, and Place Material Cubic Yard
832(2) Load, Haul, and Place Material Mile
832(3) Load, Haul, and Place Material Lump Sum
832 – LOAD, HAUL, AND PLACE MATERIALS (09/10/04)
832.06 Load, Haul, and Place Material
escription
Defect Defect Major Minor Major Minor
Slopes
Unstable material left on slopes
Material left on slopes that can be stabilized and won't block drainages
0 0 Remove
Remove or stabilize in place
Backslopes Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
0 0 Repair and Stabilize
Revegetate if greater than X minor defects *
Ditches, inlet/outlet channels, streams and catch basins water will be diverted out of the drainage structure or soil enters system
< 20% impeded, but water will stay in the channel.
0 0 Rework
Rework if greater than X minor defects *
Debris on Road (ML 4-5)
Any debris in traveled way
Debris in traveled way that may slow or impede traffic.
0 0 Rework
Rework if greater than 1 minor defects *
Debris on Road (ML 3)
Debris in traveled way that may impede traffic.
Debris in traveled way that may slow traffic.
0 0 Rework
Rework if greater than 1 minor defects *
Debris on Road (ML 2)
Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles 0 0 Rework
Rework if greater than 0 minor defects *
Placed Material
(Disposal Sites)
Unstable material on designated sites.
N/A 0 N/A Stabilize
Revegetation
No revegetation work done
Revegetation work incomplete 0 0
Rework Rework
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0
Suspend work until in compliance
Suspend work until in
833 - DRAINAGE STRUCTURE INSTALLATION OR REMOVAL (08/21/07)
833 DRAINAGE STRUCTURE INSTALLATION OR REMOVAL
833.01
Install or remove drainage structures including culverts, water-bars, drivable drain dips, and cross ditches.
833.02
Drainage structure installation is complete when culverts, water-bars, drivable drain dips and cross ditches have been installed to the lines and grades specified, and drainage structure removal is complete when designated culverts, water-bars and cross ditches have been removed and culverts have been properly disposed of.
833.03
833.04
A. Mile: Work activity will be measured along the centerline of the road regardless of the
B. Linear Foot: Work activities by the linear foot will be measured using standard survey methods rounded to the nearest one (1) foot. Culvert bands are incidental to the installation.
833.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 833 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item Description Pay Unit
833(1) ______ Inch corrugated metal pipe, ______ Inch thickness for steel, ______ Inch thickness for aluminum or
______ Inch thickness for Plastic Linear Foot
833(2) Culvert Removal Each
833(3) Water-bar Installation Each
833(4) Water-bar Installation Mile
833(5) Water-bar Removal Each
833(6) Water-bar Removal Mile
833(7) Cross Ditch Installation Each
833(8) Cross Ditch Installation Mile
833(9) Cross Ditch Removal Each
833(10) Cross Ditch Removal Mile
833(11) Drivable Grade Dip Installation Each
833(12) Drivable Grade Dip Installation Mile
833.06 Drainage Structure Installation or Removal
Defect Defect Major Minor Major Minor
Culvert size
Culvert is smaller than the designated diameter shown on the drawings.
Culvert is larger than the designated diameter shown on the drawings. 0 N/A
Remove culvert and replace with designated size
Accept if culvert fits the geometry of the road but pay at designated size otherwise replace
Culvert is shorter than the designated length shown on the drawings.
Culvert is longer than the designated length shown on the drawings.
0 0
Replace or add section to fit geometry of road.
Remove excess culvert and treat cut end, or harden fill slope to prevent erosion and pay for ordered length
Grade and alignment of culvert
More than 10% deviation from original lines and grades.
10% or less deviation from original lines and grades.
0 0
Remove and replace culvert
Remove and replace culvert
Sag or depression in road after placement of culvert and backfill material
Greater than 2 inch depression in traveled way
2 inch or less depression in traveled way 0 N/A
Furnish, place and compact designated material to repair depression.
N/A
Removed culvert or pieces left on National
Forest System Lands
Culverts or pieces of culvert left on National Forest
System Lands N/A 0 N/A
Remove from National
Forest System Lands N/A
Water-bars and cross ditches
More than 10% deviation from original lines and grades.
10% or less deviation from original lines and grades. 0 0
Rework Rework
Drivable grade dip
More than 10% deviation from specified lines and grades
10% or less deviation from specified lines and grades 0 0
Rework
Rework
Sedimentation
Operations cause or allow sediment to leave site. N/A 0 N/A
Cease operations until sediment is controlled N/A
Work Area
Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0
Suspend work until in compliance
Suspend work until in
834 - DRAINAGE STRUCTURE MAINTENANCE (03/21/2007)
834 ROADWAY DRAINAGE SYSTEM MAINTENANCE
834.01
Clean and recondition roadway drainage systems including culverts, ditches, inlet and outlet channels, catch basins, and appurtenances.
834.02
Drainage system maintenance is complete when no obstruction remains in the defined area adjacent to the structure or in ditches which would have the potential to block water from entering the structure, back water into the structure (except for structures designed to function in a back-flooded manner), or divert water outside the defined channel. Equipment operation in live streams or hydraulic flushing of drainage structures is not permitted.
When ordered by the Contracting Officer to work in a weed infested area the contractor will be required to prevent spreading the infestation into un-infested areas by cleaning vehicles and equipment. The contractor will use wash stations approved by the Contracting Officer.
834.03
As specified on roads listed on the task order road listing, shown on the plans, marked on the ground and/or ordered by the Contracting Officer and;
1. Drainage structures including inlet structures, culverts, catch basins, inlet/outlet channels, and ditches within the area shown on the plans or in the supplemental specifications.
2. Culverts - a minimum external horizontal distance of 10 feet in any direction from the inlet and outlet end and a minimum internal distance of 3 feet from the inlet and outlet ends.
3. Ditches adjacent to the roadbed.
4. This work does not include bridges, cattleguards, drain dips, or water bars.
5. Do not operate in the weed infested areas marked on the ground unless ordered to do so by the
Contracting Officer.
834.04
Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
834.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 834 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
834(1) Clean and Recondition Culverts 24 inch Diameter and under Each
834(2) Clean and Recondition Culverts Over 24 inch through 48 inch Each
Diameter
834(3) Clean and Recondition Culverts Over 48 inch Diameter Each
834(4) Clean Roadside Ditches Mile
834(5) Clean Lead-off Ditches Feet
834(6) Clean Drainage Structures Mile
834.06 Drainage Structure Maintenance
Defect Defect Major Minor Major Minor
Blocked Culverts Greater than 20 % of end area blocked
20% or less of end area blocked 0 0 Rework Rework
Damaged Culvert
Inlet/outlets
Greater than 20 % of end area blocked
20% or less of end area blocked 0 0 Rework Rework
Impeded flow for ditches, inlet/outlet channels, and catch basins water will be diverted out of the drainage structure or system
< 20% impeded, but water will stay in the channel. 0 5’ per
1000 ft Rework
Rework if greater than
1 minor defects *
Debris on Road (ML 4-5) produced by Service
Provider operations.
Any debris in traveled way N/A
0 N/A Rework N/A
Debris on Road (ML 3) produced by Service
Provider operations.
Debris in traveled way that may impede traffic.
Debris in traveled way that may slow traffic. 0 0 Rework Rework
Debris on Road (ML 2) produced by Service
Provider operations.
Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles 0 0 Rework Rework
Aggregate Surface Quality
Gradation of surface aggregate is degraded by more than 10 %
Gradation of surface aggregate is degraded by 10
% or less
100’ per
Rework
Rework if greater than
1 minor defects *
Backslopes
Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
10’ per
100’
Repair and
Stabilize
Revegetate if greater than1 minor defects *
Vegetation woody vegetation within 5 feet of the inlet end of drainage structures or in ditches that interferes with flow low growing vegetation within 5 feet or more of inlet end of drainage structures or in ditches that does not interfere with flow
0 N/A Remove Leave in place
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0
Suspend work until in compliance
Suspend work until in compliance
Working outside project limits Area contains invasive weeds N/A 0 N/A
Repair and treat affected areas as directed by the
Contracting
Officer
841 – DISTURBED AREA TREATMENT (09/10/04)
841 DISTURBED AREA TREATMENT
841.01
Apply vegetative treatments including seed, mulch, fertilizer or other products in designated areas.
841.02
Treatment is complete when ordered quantities of vegetative treatment products have been applied to designated or Service Provider disturbed soil areas.
836.03
836.04
A. Mile: Work activity will be measured along the centerline of the road regardless of the
B. Acres: Work activity will be measured to the nearest one-tenth (0.1) acre.
841.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this
841(1) Establish Vegetation Acres
841(2) Establish Vegetation Mile
841(3) Establish Vegetation Lump Sum
841 – DISTURBED AREA TREATMENT (09/10/04)
841.06 Vegetation Treatment
Defect Defect Major Minor Major Minor
Seed Mix
Seed mix is not as specified N/A
0 N/A Reject and replace N/A
Mulch
Mulch is not as specified N/A
0 N/A Reject and replace N/A
Fertilizer
Fertilizer is not as specified N/A
0 N/A Reject and replace N/A
Weeds
Does not conform to Federal, State, and Local seed and noxious weed acts and laws.
N/A
0 N/A Reject and replace N/A
Application
Less than 80% of the designated area is treated
Between 80% and 100% of the designated area is treated 0 0 Rework Rework
Work Area
Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
N/A
0 N/A Suspend work until in compliance
851 Hazard Removal (09/10/04)
851 HAZARD AND OBSTRUCTION REMOVAL
851.01
Remove and/or stabilize hazards and obstructions.
851.02
Work is complete when hazards have been removed or stabilized and when the road is passable by the intended traffic.
851.03
851.04
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
851.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this
851(1) Logging Out (ML 3-5) Mile
851(2) Logging Out (ML 2) Mile
851(3) Danger Tree Removal Mile
851(4) Danger Tree Removal Each
851(5) Hazard or Obstruction Removal Mile
851(6) Hazard or Obstruction Removal Each
851.04 Hazard Removal
Discription
Defect Defect Major Minor Major Minor
Utilization of Timber
Log lengths do not meet utilization standards (see
SPS or Task Order) N/A 0 N/A
Charge for loss of stumpage
N/A
Stump Heights
Exceed Specified Height by more than 6 inches
Exceed Specified Height by up to 3 inches 0 3 per 10 Rework
Rework if greater than 4 minor defects *
Tree damage caused by Service
Provider's operations
Damage to more than 30% of the tree bole
Damage to 30% or less of the tree bole 0 0
Remove or
Treat Treat
Impeded flow for ditches, inlet/outlet channels, and catch basins caused by Service Provider's
Operations
Water will be diverted out of the drainage structure or system
20% or less impeded, but water will stay in the channel. 0 10’ per 100’ Rework
Rework if greater than 1 minor defects *
Marked Danger Trees and Snags
Any remaining snags or danger trees that were marked
Any remaining snags or danger trees that were not marked 0 X per unit Rework
Assess and
Rework
Hazards that interfere with the use of the road (rocks, logs, etc)
(ML 3-5)
Unstable hazards that remain in the Clearing
Limits
0 N/A Rework N/A
Hazards that interfere with the use of the road (rocks, logs, etc)
(ML 2)
Unstable hazards that remain within X distance of the Traveled way
0 N/A Rework N/A
Log Out
Horizontal clearance - more than 20% not cleared to specified distance
Horizontal clearance -
20% or less not cleared to specified distance 0 10’ per 1000’ Rework
Rework if greater than 1 minor defects *
Vertical clearance -more than 20% not cleared to specified distance
Vertical clearance - 20% or less not cleared to specified distance 0 10’ per 1000’ Rework
Rework if greater than X minor defects *
Discription Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures N/A 0 0
Suspend work until in
861 - MAINTENANCE OF TRAFFIC GATES AND BARRIERS, AND GUARD RAILS (08/21/07)
861 MAINTENANCE of TRAFFIC GATES and BARRIERS, GUARDRAILS, and RETAINING WALLS
861.01
Maintain cattleguards, traffic gates and barriers, guardrails, retaining walls and appurtenances. Remove traffic gates and barriers.
861.02
A. Traffic gate maintenance is complete when it is free of structural defects, the gate and all associated posts are stable and the locking mechanism is in working order, the surfaces are free of oxidation and painted, and all designated signs are in compliance with MUTCD and EM 7100-15 Standards for Forest Service Signs and Posters.
B. Guardrail maintenance is complete when it is free of structural defects, and all posts and rails are stable, secure, aligned, and in compliance with State Standards and “AASHTO Roadside Design Guide”.
C. Guardrail barrier maintenance is complete when it is free of structural defects, all posts and rails are stable, secure and aligned, and all designated signs are in compliance with MUTCD and EM 7100-15 Standards for
Forest Service Signs and Posters.
D. Jersey barrier maintenance is complete when it is stable, aligned and all designated signs are in compliance with MUTCD and EM 7100-15 Standards for Forest Service Signs and Posters.
E. Rock and earth barrier maintenance is complete when it is stable, aligned and at the dimensions SHOWN
ON THE PLANS, and all designated signs are in compliance with MUTCD and EM 7100-15 Standards for
Forest Service Signs and Posters.
F. Retaining wall maintenance is complete when the wall is stable, aligned and repaired to the original lines and grades, and the materials used are equal to or exceed the original wall material.
G. Removal of gates and barriers is complete when they have been removed and disposed of as designated and the road is passable by the intended traffic.
861.03
861.04
Linear Foot: Work activities by the linear foot measured by using standard survey methods rounded to the nearest one (1) foot.
861.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 861 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this
861(4) Maintain traffic gate Each
861(5) Maintain traffic gate Lump Sum
861(6) Maintain guardrail Linear Foot
861(7) Maintain guardrail Lump Sum
861(8) Steel structure component and fastener replacement Lump Sum
861(9) Maintain guardrail barrier Each
861(10) Maintain jersey barrier Each
861(11) Maintain rock/earth barrier Each
861(12) Maintain retaining wall Lump sum
861(13) Remove gate Each
861(14) Remove guardrail barrier Each
861(15) Remove jersey barrier Each
861(16) Remove rock/earth barrier Each
861.06 Maintenance of Traffic Gates and Barriers, and Guard Rails
Defect Defect Major Minor Major Minor
Metal Surfaces
Exposed metal, rust , or oxidation, greater than 25% of surface
Exposed metal, rust, or oxidation, 25% or less of surface 0 2% per each Paint or Coat
Repair if greater than 1 minor defects *
Penetrated rust or oxidation that compromises structural integrity
Penetrated rust or oxidation that does not compromise structural integrity
0 0 Replace component Paint or Coat and notify
Structural Integrity
Major cracks, broken, decomposed, or missing components and fasteners.
Minor cracks, loose components and fasteners. 0 0 Replace component and/or fasteners
Repair component and/or fasteners
Alignment
Greater than 10% deviation from original lines and grades, or non-functional.
10% or less deviation from original lines and grades. 0 0 Repair or replace Repair
Vaults/drainage
Greater than 50% of the vault is full or drainage is impeded.
50% or less of the vault is full and drainage is not impeded. 0 0 Clean Clean and Repair
Signs/Markers
Missing, non-functional or non-readable
Bent or damaged, but still functional and readable 0 5% per sign Repair or replace
Repair or replace if greater than 1 minor defects *
Debris produced by Service
Provider operations.
Debris left on road or placed in drainage structures. N/A 0 N/A Remove from road or drainage N/A
Removed materials or pieces left on National
Forest
Unserviceable posts, rails, or other materials left on
National Forest N/A 0 N/A Remove from
National Forest
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Materials and Methods
Does not conform to
AASHTO, ASTM, AWPA,
and MUTCD standards and does not meet or exceed the original materials used
0 N/A Reject and replace N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
N/A
0 0 Suspend work until in compliance
872 - SIGN MAINTENANCE (09/10/04)
872 SIGN MAINTENANCE
872.01
Furnish, install, and maintain forest entrance, destination, route markers, traffic signs, etc.
872.02
Sign Maintenance is complete when designated signs meet the quality standards of EM 7100-15
Standards for Forest Service Signs and Posters, and Forest Service Sign Installation Guide 6E62H99 –
Sign Installation Field Guide. Both EM 7100-15 and 6E62H99 are available at http://www.fs.fed.us/database/acad/om/.
872.03
872.04
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
http://www.fs.fed.us/database/acad/om/
872.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 872 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
872(1) Clean Sign Face Each
872(2) Recondition Sign Face Each
872(3) Install or Replace Single Post and Sign Each
872(4) Install or Replace Double Post and Sign Each
872(5) Install or Replace Sign Each
872(6) Remove Sign Each
872(7) Remount Sign Each
872(8) Apply New Sign Face Each
872(9) Maintain Marker Each
872(10) Replace Marker Each
872 (11) Sign, Marker Maintenance Mile
872.06 Sign Maintenance
Defect Defect Major Minor Major Minor
Materials
Signs, posts and other materials do not meet applicable standards
N/A 0 N/A Reject and replace N/A
Installation Not installed according to applicable standards N/A 0 N/A Reject and replace N/A
Maintenance Not maintained according to applicable standards N/A 0 N/A Reject and replace N/A
Work Area
Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
N/A 0 0 N/A Suspend work until in
File details come from the government source that posted it. Updated .