Amendment 1_SF-30.pdf
PDF 131 KB Posted
- Solicitation number
- AG-435H-S-11-0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract Award Information.pdf | ||
| Pre-Bid Meeting Attendees.pdf | ||
| Lake Conasauga directions.doc | DOC document | |
| GA232 Fannin WageDet.pdf | ||
| AG-435H-S-11-0004.pdf | ||
| Facilities IDIQ_SPECS.pdf | ||
| Contractor Performance Survey.doc | DOC document | |
| GA285 Murray WageDet.pdf | ||
| experience questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)
6. ISSUED BY:
USDA Forest Service
Chattahoochee-Oconee National Forests
1755 Cleveland Highway
Gainesville, GA 30501
7. ADMINISTERED BY (If other than 6.):
[X ]
9A. AMENDMENT OF SOLICITATION NUMBER
AG-435H-S-11-0004
Facilities Maintenance IDIQ
9B. DATED (see item 11)
07/12/2011
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (see item 13)
CODE FACILITY
11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS
[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ ] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if applicable)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
A. THIS CHANGE IS ISSUED PURSUANT TO: 52.243-4
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (specify type of modification and authority )
E. IMPORTANT: Contractor [ ] is, [ ] is not required to sign this document and return copy(s) to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION
Replace schedule of items with the attached new document.
Replace Specifications Table of Content page 2 with this new Table
Delete existing Specification page 21 Exterior Improvements. Contractor shall not bid on this work.
Replace page 19-21 with the attached pages titled Site Furnishing.
A site showing for the Lake Conasauga work has been schedule for August 5 at 10:00am. Contractors who will attend this showing must call Larry Holsomback 706-695-6736 x115 and leave a message that they will attend. Contractors who wish to follow Larry to the site should be at his office at 3941 Highway 76, Chatsworth GA no later than 8:30am.
The due date for receipt of proposals is not changed. It remains 4:00pm on August 12, 2011.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print)
Marcia O’Connor
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(signature of authorized person) (signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)
PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243
AG-435H-S-11-0004 Recreation Facilities Renovation
Revised 8/1/2011
SECTION B - Supplies or Services and Prices/Costs Schedule of Items
Item # Morganton Point Units Quantity Price Amount
1 Bathroom Inside/Outside Pressure Washing & Painting. Floor Cleaning
LS 1 $ $
3 Replacing floor vents with new mesh and frame LS 1 $ $
4 Replace Doors with frames (Steel) Each 3 $ $
5 Replace Men/Women sign Each 4 $ $
6 Replace sinks with self closing faucet Each 4 $ $
7 Replace mirrors Each 2 $ $
8 Replace interior light fixture Each 2 $ $
9 Replace flushing mechanism Each 6 $ $
10 Partition doors (solid plastic) LS 1 $ $
11 Toilet Replacement (Men’s) Each 1 $ $
Total $
Item # Lake Conasauga – Loop 1 Units Quantity Price Amount
1 Bathroom Inside/Outside Pressure Washing & Painting. Floor Cleaning & concrete paint
LS 1 $ $
3 Replacing floor vents with new mesh and frame LS 1 $ $
4 Replace Doors with frames (Steel) Each 3 $ $
5 Replace Men/Women sign Each 2 $ $
6 Replace sinks with wall mount type with self-closing faucet and laminated counter demolition
Each 2 $ $
7 Replace mirrors Each 2 $ $
8 Replace interior light fixture Each 2 $ $
9 Bathroom Partition set (stainless steel) LS 1 $ $
Total $
SECTION 00 0110
TABLE OF CONTENTS
SPECIFICATIONS
2.01 Division 01 --General Requirements
A. 01 1000 -Summary
B. 01 4000 -Quality Requirements
C. 01 4216 -Definitions
D. 01 5000 -Temporary Facilities and Controls
E. 01 5500 -Vehicular Access and Parking
F. 01 5713 -Temporary Erosion and Sediment Control
G. 01 6000 -Product Requirements
H. 01 7000 -Execution and Closeout Requirements
2.02 Division 02 --Existing Conditions
A. 02 4100 -Demolition
2.03 Division 12 --Furnishings
A. 12 9300 -Site Furnishings
Facilities IDIQ 00 0110 -1 TABLE OF CONTENTS
SECTION 12 9300 SITE FURNISHINGS
1.01 WORK
A. All items designated for installation or replacement must be furnished by the Contractor, including any materials, hardware and fasteners needed for installation and security. All items designated for removal, except those specified by the Government, shall become property of the contractor and shall be removed off government lands.
B. See part 2 for specific work requirements by product.
C. Submittal is required for each product
PART 2 PRODUCTS
a. Bathroom Sink
Contractor to remove existing Bathroom Sinks and furnish and install new Bathroom Sinks in similar location per manufacturers’instructions using existingplumbing. Contractor shallprovideallmaterials and hardware necessary to install Bathroom Sinks per manufacturers’ instructions and as additionally required by the government to provide added security (i.e. wall anchoring). Bathroom Sinks and faucet shall be:
A) Manufacturer: KOHLER Chesapeake Wall-Mount Bathroom Sink in White B) Manufacturer:
Glacier Bay Single Hole 1-Handle Low-Arc Bathroom Faucet in Chrome
Or an alternate bid
A) Custom laminated cabinet with two drop in sink, white.
B) Manufacturer: Glacier Bay Single Hole 1-Handle Low-Arc Bathroom Faucet in Chrome
Or approved similar (Brand could be different, match existing style and color)
b. Mirrors
Contractor to remove existing mirros and furnish and install new mirros in similar location per manufacturers’ instructions. Contractor shall provide all materials and hardware necessary to install mirros per manufacturers’ instructions and as additionally required by the government to provide added security (i.e. wall anchoring). Mirrors shall be:
A) 20” x24” Chrome, wall mounted frameless mirror
Or approved similar
c. Doors
Contractor to remove existing wooden doors and frames and furnish and install new steel hollow core doors with frames and hardware. Contractor shall provide all materials and hardware necessary to install steel hollow core doors and frames. US Forest Service shall provide the deadbolt locks. Doors shall be pre-drilled.
Facilities IDIQ 12 9300 -1 SITE FURNISHINGS
A) Contractor is required to take measurements and get approval from COR for style and color prior to order the doors. Doors are special order, can be from your local hardware store Home Depot, Lowe’s, etc. Doors differ in size.
d. Signs Contractor to furnish and install (1) men sign and (1) women sign. Contractor shall provide all materials and hardware necessary to install signs.
A) Manufacturer: Utah Correctional Industries PO Box 850 Draper, Utah 84020 (801) 576-7700
e. Interior Light Fixtures
Contractor to remove existing interior light fixtures and furnish and install new interior light fixtures in similar location and similar in kind. Contractor shall provide all materials and hardware necessary to install fixtures.
A) Submittal is required.
f. Flushing Mechanism (Morganton Point only)
Contractor to remove existing flush toilet flushing mechanism in both men (including the urinal) and women and furnish and install new flushing mechanism in similar location per manufacturers’ instructions using existing plumbing. Contractor shall provide all materials and hardware necessary to install flushing mechanism per manufacturers instructions.
Installation may require additional plumbing work in the plumbing alley. Contractor is advise to field verify existing conditions.
Flushing mechanism shall be:
A) Manufacturer: Sloan 111 XL Regal Toilet Flush Valve (3080053) -Chrome http://www.faucetdepot.com/faucetdepot/main.asp (for reference only)
Or approved similar
g. Partition Doors or set (walls and doors)
Contractor to remove existing door partitions in both men and women and furnish and install new door partitions in both men and women per manufacturers’ instructions. Contractor shall provide all materials and hardware necessary to install door partitions per manufacturers instructions. Door Partitions shall have the following specifications as minimum:
A) Solid Plastic, 5ft. Length, width as required with matching pilaster, color to be coordinated with COR. (Morganton Point only) http://www.allpartitions.com/ (for reference only)
B) Stainless Steel stalls, width and length to match existing partition set. Match existing configuration. (Lake Conasauga only) http://www.allpartitions.com/ (for reference only)
C) Submittal is required with color palette.
Facilities IDIQ 12 9300 -2 SITE FURNISHINGS http://www.faucetdepot.com/faucetdepot/main.asp http://www.allpartitions.com/ http://www.allpartitions.com/
h. Exterior and interior Paint
Contractor shall furnish and paint building interior and exterior. Contractor shall match existing interior and exterior colors and use a Semigloss finish. Contractor shall pressure wash interior and exterior of building and let the building to dry before starting painting.
END OF SECTION
Facilities IDIQ 12 9300 -3 SITE FURNISHINGS