BidAmendmentNo1.pdf
PDF 154 KB Posted
- Attached to
- Patching and Overlay Paving Low Gap Road, Rabun County, GA Federal contract opportunity
- Solicitation number
- AG-435H-S-10-0015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract Low Gap Paving.pdf | ||
| Drawings_Low Gap Road No. 2.pdf | ||
| Specifications_Low Gap Road No. 2 .doc | DOC document | |
| OF-17 Offer | — | |
| IFB_Low Gap Road No. 2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)
1 July 1, 2010
6. ISSUED BY:
USDA Forest Service
Chattahoochee-Oconee National Forests
1755 Cleveland Highway
Gainesville, GA 30501
7. ADMINISTERED BY (If other than 6.):
8. NAME AND ADDRESS OF CONTRACTOR
[ x ]
9A. AMENDMENT OF SOLICITATION NUMBER
AG-435H-S-10-0015
Low Gap Road No. 2 (Paving)
9B. DATED (see item 11)
6/21/2010
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (see item 13)
CODE FACILITY
11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS
[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if applicable)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
A. THIS CHANGE IS ISSUED PURSUANT TO:
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (specify type of modification and authority )
E. IMPORTANT: Contractor [ ] is, [ ] is not required to sign this document and return copy(s) to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION
Replace bid schedule with the one attached. New schedule includes a method of measurement column.
On page 5, Scope of Contract, third paragraph, change spread rate to 220 lbs per square yard.
Notes from the pre-bid meeting are attached. The meeting was not mandatory.
The due date for receipt of bids is not changed. It remains July 20, 2010 at 2:00pm
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print)
Marcia O’Connor 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY:________________________ July 1, 2010
(signature of authorized person) (signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)
PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243
Low Gap Road No. 2
AG-435H-S-10-0015
Schedule of Items Revised July 1, 2010
Base Section (Sta 0+00 to 38+00)
Item No. Description
Pay
Unit
Method of
Measurement
Est.
Qty. Unit Price Total Price
BASE01 Mobilization ls LSM All XXXXX $
BASE02 Type "A" Patching, Deep Patch sq.yd. AQ 850.8 $ $
BASE03 Type "B" Patching, Surface Patch sq.yd. AQ 25.5 $ $
BASE04 2" Asphalt Overlay, 9.5 mm Superpave lf CQ 3800 $ $
Total - Base $
Additive "A" (Sta 38+00 to 45+00)
Item No. Description
Pay
Unit
Method of
Measurement
Est.
Qty. Unit Price Total Price
A01 Type "A" Patching, Deep Patch sq.yd. AQ 39.1 $ $
A02 2" Asphalt Overlay, 9.5 mm Superpave lf CQ 700 $ $
Total $
Additive "B" (Sta 45+00 to 60+00)
Item No. Description
Pay
Unit
Method of
Measurement
Est.
Qty. Unit Price Total Price
B01 Type "A" Patching, Deep Patch sq.yd. AQ 294.8 $ $
B02 2" Asphalt Overlay, 9.5 mm Superpave lf CQ 1500 $ $
Total $
Additive "C" (Sta 60+00 to 72+83)
Item No. Description
Pay
Unit
Method of
Measurement
Est.
Qty. Unit Price Total Price
C01 Type "A" Patching, Deep Patch sq.yd. AQ 112.4 $ $
C02 2" Asphalt Overlay, 9.5 mm Superpave lf CQ 1283 $ $
Total $
Total – Base and All Additive Items $
NOTES:
Method Of Measurement: Refer to section 109.02 in the FP-03 specifications.
CQ = Contract Quantity. The quantity to be paid is as shown in the bid schedule. No adjustment will be made except for circumstances described in the FP-03 specification.
See page 36, Clause AGAR 452.236-70 Additive or Deductive Items for the method to be used for evaluating additives for award.
Pre-Bid Meeting Notes
A Pre-Bid meeting was held June 29, 2010. Three contractors attended:
Colwell Construction, Blairsville GA
ShepCo Paving, Lithonia GA
Reeves Construction, Toccoa GA
Questions and Answers:
1. Can the pay item for asphalt overlay be changed to “Ton” rather than “Linear Feet”?
No. The Forest Service considered making the change, but has decided to keep the method of measurement as linear feet.
2. What is the tolerance for asphalt thickness?
Refer to the Forest Service Supplemental Specifications, section 301.06, Surface Tolerance.
3. Is paving to be done directly over #57 stone?
Use #57 stone for bidding. It may be changed after award.
4. What is the schedule for traffic control?
The base bid section from BOP to 38+00 in on Forest land and may be kept closed during the day. The additive sections have adjoining private property so contractor shall allow for access to the properties. See FP-03 section 156 on maintaining roadways and traffic control.
5. How many trees are marked for cutting?
There are 277 trees to be sold to the contractor under the Removal Permit.
6. Must all those trees be removed?
Refer to section H, page 7. Trees may be felled away from the road and shoulders, but all slash and limbs must be cut to lie not more than 2 feet above ground level.
6. Who are possible loggers for removing the purchased trees?
See list below. This is not an endorsement by the Forest Service to use any particular logger.
Chad Dixon 2174 Hwy 76 West Clayton, GA 30525
(706) 490-2088
Lance Kilby 776 Billy Watts Cove Road Tiger, GA 30576
(706) 490-2120
Larry Walker 794 Chopped Oak Church Road Toccoa, GA 30577
(706) 599-0626
John Yearwood PO Box 350 Mt Airy, GA 30563
(706) 499-8970