MB Approval 2700-0042

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

02 March 2, 2010

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

U.S. Department of Agriculture, ARS FD, Facilities Contracts Branch 5601 Sunnyside Ave., Mail Stop 5124 Beltsville, MD 20705-5124 301-504-1173, email: barry.johnson@ars.usda.gov

Same as Block 6

8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code) (�) 9A. AMENDMENT OF SOLICITATION NO.

AG-3K15-S-10-0004

√ 9B. DATED (SEE ITEM 11)

01/11/2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(√) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is being issued for the following:

There were 3 amendments posted to FBO.gov, amendment 3 is the only one to be concerned with. Amendments 1 and 2 have no attachment and are not valid amendments. As of this amendment there are now two.

Clarification to responses given for #10, #11, #13, #14, #15, #16, and #17 (see page 2).

Answers more questions received from industry (Cutoff date for questions remains March 1, 2010 @ 1:00 PM EST).

Changes to Specifications, Changes to drawings, adds drawings, Provides sign-in sheet for 2nd site visit The due date for this solicitation remains unchanged for March 10, 2010 @ 2:00 PM EST.

Except at provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Barry Johnson, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign)

BY _____________________________________________

(Signature of Contracting Officer)

PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.24

Solicitation No. AG-3K15-S-10-0004 Amendment 02

10. Reference: General

Question: Would the team members have to register as one entity in the central contractor registry (www.ccr.gov) even if not forming a Joint Venture for the submission?

Response: No, only one company needs to be CCR. Please provide copy of the signed agreement with your proposal. As a note the contract will be awarded to the one company registered.

Regarding the teaming agreement, a copy of the agreement with the terms and conditions must be provided with your proposal; that identifies which company will take the lead and what responsibilities will be assigned to each company.

11. Reference: General

Question: According to the instructions on page 64 of the Solicitation, we are to submit Three

(3) originally signed copies of the signed offer (Sections A through K). This instruction is not clear. Some of the items/documents in Sections A through K do not require signatures or action. Do each of the following documents need to be submitted separately from the Technical and Cost/Business Proposals? Do we need to submit three (3) original bid bonds?

Response: Yes, please submit one original copy of sections A through I. J, K, L, and M are not required to be returned with your proposal.

13. Reference: General

Question: Do we need to submit Section B – Supplies or Services and Price/Cost.

Response: Yes, one original is required.

14. Reference: General

Question: Do we need to submit Section K – Representations, Certifications, and other statements of offerors.

Response: No, but insure that you have completed section K online in ORCA.

15. Reference: General

Question: Do we need to submit Key Personnel, Section H.25.

16. Reference: General

Question: Do we need to submit a Bid Bond.

17. Reference: General

Question: Do we need to submit Disclosure of Lobbying Activities (SF-LLL).

All other terms and conditions of the solicitation remain in full affect.

Amendment No. 02 to the referenced Solicitation provides the following:

1. The date for receipt of all bids has NOT been extended. It remains MARCH 10, 2010,

2. 2 p.m., local time. Bids are to be mailed or hand-carried to the following address:

U.S. Department of Agriculture Facilities Division, FCB 5601 Sunnyside Avenue, MAIL STOP 5124 Beltsville, Maryland 20705-5124

3. List of Attachments:

Questions Received from Industry (Attachment A) Changes to Specifications (Attachment B) Changes to Drawings (Attachment C) Added Drawings and Sketches (Attachment D) Added Specifications (Attachment E) Hazardous Materials Report (Attachment F) Pre Bid Second Site Visit Sign In Sheet (Attachment G)

ATTACHMENT “A”

Questions Received from Industry

The following questions and answers are provided for clarification.

27. Reference: Technical Proposal

Question: In section L(b)(1)B - Past Performance, the solicitation requires a Past/Performance Evaluation Form in Section J to be filled out. Is it acceptable to use Past/Performance Evaluation Forms previously submitted by these clients which are in an alternate format, but contain the same information?

Response: Please use the Past/Performance Evaluation forms that are attached to solicitation AG-

3K15-S-10-0004, ERRC project.

28. Reference: Specification

Question: After reviewing portions of the specifications, it appears that the job is open in regard to controls vendors. I also noticed that the specs call for tie into the remaining Seimen’s Apogee System. I was wondering at what level of intricacy are you looking to communicate to the remaining system? Are you looking to add a new system that controls and monitors the existing or one that can be added without disrupting the current set-up? If minimal interaction to the existing is required, I was planning on proposing a web-based system that can be accessed on any computer with a current Microsoft OS and internet access. If a more complex integration is required, I still can provide the web-based system but I will also provide ample engineering time to communicate with the remaining Seimen’s system. I would just like to be extra sure to make sure what I propose is exactly what you are looking anticipating. If you could shed some light I would greatly appreciate it.

Response: The new control system shall be capable of resetting control device setpoints of the existing control devices, and shall monitor all existing analog input sensors. Provide gateway controls, new control devices to replace existing, and programming as required to monitor and control new equipment and existing points. The DDC system specification 23 09 54.00 20 has been revised. Refer to Attachment B.

29. Reference: Specification Section 23 08 00.00 10

Question: Section 23 08 00.00 10 Spec states boiler 3 is being replaced with a new steam boiler under the phase 8 contract. However, under contract phase 8 calls for adding 4th steam boiler B-4. No demo planned on B-3 larger boiler and all tie-ins to existing systems is being based on B-3 remaining in place. Please advise if your plan is to take B-3 out of service and leave in place or remove at later date?

Response: Existing boiler B-3 will remain in service. The boiler specification has been revised.

Refer to Attachment B.

30. Reference: Specification Section 23 08 26 page 5

Question: A system whose pressure is greater than 103 kPa (gage) and shall conform to ASME B31.1. Definition is to be high pressure piping system. The boiler design pressure is 862 kPa = 125 PSIG. This is high pressure for steam, but not for systems. Should the valves, fittings and other components be 150# or 300#?

Response: Specification 23 22 26 refers to the requirements for fittings in steam piping. Furnish angle type nonreturn stop and boiler check valves designed for 250 psig (1725 kPa) steam working pressure. Specification 23 52 49.00 20 has been revised. Refer to Attachment B.

31. Reference: Drawing Sheet Mechanical

Question: The symbol for gate valve is used at chilled water and condenser water system. Can butterfly valves be used in the locations shown as gate valves?

Response: Butterfly valves with gear operator can be used in the chilled water and condenser water piping systems in lieu of gate valves at the chillers, pumps, and central power plant locations. Butterfly valves with lever operator and memory stop can be used on the chilled water and heating water piping systems in lieu of gate valves at the air handling unit coils. Valves are Milwaukee Valve model CL Series 200 psi MSS SP-67 or approved equal.

32. Reference: Drawing Sheets M00.03, M02.01, & M1.04

Question: Demo dwg. M00.03 shows existing 6" HPS gate valve to remain. Dwg. M02.01 &

M01.04 show tie in point of 6" HPS on header side of valve, however, M01.04 states valve existing. Will the existing valve remain or be replaced?

Response: The existing shut off valve shall be replaced with a new valve. Sheets M00.03 and

M01.04 have been revised to show the valve as being replaced. Refer to Attachment C.

33. Reference: Drawing Sheet M04.01

Question: Dwg. M04.01 schedule, shows surface blow down heat exchanger with Note: 1. Provide w/sample cooler w/trim for each boiler, blow down thermometer and valves/strainer for blow down. What is required for sample cooler and how many? One or four?

Response: Provide one new blowdown heat exchanger and one new sample cooler. Provide new surface blowdown piping between new boiler B-4 and blowdown heat exchanger assembly. Blowdown piping from each of 4 boilers passes through the heat exchanger and sample cooler.

34. Reference: Drawing Sheet M03.01

Question: It is not clear as to what valves are required for new cooling tower piping and also their location. Cooling tower flow diagram dwg. M03.01 shows 3-12" BFV, 2-12" balancing valves, 5-10" BFV & 8-10" control valves.

Response: The valves have been revised to match sheet M05.01. Drawing M03.01 has been revised.

Refer to Attachment C and D.

35. Reference: Drawing Sheet M05.01

Question: Cooling tower piping detail 8 dwg. M05.01 shows 2-12" BFV, 12-10" BFV & 6-10" control valves (no balancing). Please advice what valves and locations you require?

Response: There are 4-10” modulating control valves, 2-2” modulating control valves, 6-10” isolation control valves, 2-10” balance valves, 2-2” balance valves, 4-8” flow control valves, 2-2” strainers, 2-2” BFV, 4-3” BFV, 10-10” BFV, 2-12” BFV. There are additional valves at the existing cooling towers. Drawing M05.01 has been revised.

36. Reference: Drawing Sheet M01.01

Question: Cooling tower detail A dwg. M01.01 shows 2-12" BFV, 4-10" BFV as well as 1 more 10" BFV as part of option 3 additional work & 10-10" control valves. Please advice what valves and locations you require?

Response: The valves have been revised to match sheet M05.01. Drawing M03.01 has been revised.

37. Reference: General

Question: The project specifications did not include asbestos report. Please provide this information.

Response: Hazardous Material Report shall be provided. Refer to Attachment F.

38. Reference: Drawing Sheet A07.32/Specifications

Question: Please provide specification section for the expansion joint system shown on sheet A07.32 detail 5.

Response: Specification Section 07 95 13, 'Expansion Joint Cover Assemblies' has been added.

Refer to Attachments B and E.

39. Reference: Drawing Sheet A04.01/Specifications

Question: Sheet A04.01 of the phase 9A & 9B drawings note 32, suggest replacing the metal panel at the roof level. Please provide specifications for this material.

Response: Specification Section 07 60 00, 'Flashings and Sheet Metals' has been added. Refer to

Attachments B and E.

40. Reference: General

Question: Please provide a sign in sheet of the attendees from the second site visit dated February 17th, 2010.

Response: Sign in sheet for the second pre bid site visit is provided in this amendment. Refer to

Attachment G.

41. Reference: General

Question: Please provide a list of subcontractors that have worked on previous phases of the USDA

East Regional Center.

Response: All the previous contracts have been closed and archived and these records are no longer available.

42. Reference: Solicitation Page 35

Question: Page 35 of the Solicitation, Section I, Paragraph I.3.b.1 and 2, indicate an evaluation preference factor of 10% for HUBZone small business concerns. Paragraph I.3.b.3 indicates an additional price evaluation preference for small disadvantaged business concerns, but does not indicate what this percentage is. Clarify.

Response: Only the HUBZone preference will apply to this project. The SDB preference only applies to DOD, NASA, and Coast Guard contracts and does not apply to the USDA.

43. Reference: Drawing Sheet S01.02

Question: Drawing S01.02, new steel beams are indicated along Column Line 14. Is there any demolition involved at this location? Any dry packing? Does existing framing tie in to this new steel? It would be helpful to have a section taken through Column Line 14 to better understand what is intended here.

Response: The darkened bold line along column line 14 and beyond the exterior walls indicates the phase line between 9A and 9B. The 360WF45 is existing to remain.

44. Reference: Drawing Sheet A00.07

Question: Clarify that only those window units shown dotted on Drawing A00.07 are to be removed and replaced.

Response: Correct.

45. Reference: Drawing Sheet A04.01

Question: Per Drawing A04.01, what does the numeral within the ‘pentagon’ designate? (Note that

Dwg. A09.01 – Window Schedule utilizes a ‘hexagon’).

Response: Numeral within the ‘pentagon’ designate Window Types. Drawing. A09.01, the

Window schedule, does utilize hexagons instead of pentagons.

46. Reference: Drawing Sheet A04.01

Question: From Drawing A04.01, what does the numeral “1” in the pentagon designate?

Response: Window Type. Refer to Window Schedule in Dwg. A09.01.

47. Reference: Drawing Sheet A04.01

Question: Clarify the intent of General Note E on Drawing A04.01. Is this interior or exterior work, above grade or below grade?

Response: Seal coat (in concrete coating applications) shall be applied on the interior of the basement walls.

48. Reference: Drawing Sheet A04.01 General Note D.

Question: Comment – the first rule of public bidding is that you only price what is shown. Perhaps an allowance could be established for penetrations not indicated (?) It is difficult to fairly price what the designer doesn’t show. Suggest this wording be revised.

Response: Drawing Sheet A04.01, General Note D, last sentence: Delete the word "not". Refer to

Attachment C.

49. Reference: Mechanical Drawings

Question: Can the existing heating system in the Pilot Plant be utilized for temporary heating of the work areas?

Response: The existing heating equipment and systems may be used during demolition. The demolition work will need to be coordinated, since the air handling units are located in the attic. No interruptions to the existing occupied area utilities shall occur unless approved by the Contracting Officer.

50. Reference: Specification Section 26 20 00

Question: Section 262000 12.4.1 calls for the use of aluminum ladder type cable tray with maximum rung spacing of 150mm. Will a zinc plated wire mesh cable tray system such as Mono-Mesh cable tray be considered in lieu of the ladder type cable tray system specified some of the benefits to the owner will be; Cost saving in both material and installation cost. More flexible to negotiate above over crowed ceilings, easier to relocate if necessary, but still has the same loading capacity as the cable tray system specified.

Please advise.

Response: Provide as specified.

51. Reference: Specification Section 26 20 00

Question: Section 262000 2.8.5 specified material clad cable per 1569, and NFPA 70, Type MC Cable but does not specifically state how and where it can be used. Can it be installed as stated and recommended per 1569, NFPA 70 and N.E.C. guidelines. Please advise.

Response: All insulated conductors shall be installed in rigid steel conduit, IMC, rigid nonmetallic conduit, or EMT. The exceptions include if specifically required in the documents or if NFPA 70 requires the use of MC cable. Otherwise, all raceways shall be in conduit.

52. Reference: Drawing Sheet E05.01

Question: Single line drawing E05.01: We cannot seem to locate the five existing “H” panel on the floor plan that are to be fed through the new pull/splice box on corridor wall from existing MDPA. Please advise us of their exact location so we can obtain the necessary measurements needed for the new cable runs.

Response: Existing panels are located as follows: Panel HBA near column S12 – see drawing

E01.01; Panel H1A near column R10 – see drawing E01.02; Panel H2A between columns P11 and R11 – see drawing E01.03; Panel H3A between columns P11 and R11

– see drawing E01.04;Panel HAA - for bidding purposes assume a location at attic level between columns P11 and R11.

53. Reference: Drawing Sheet E02.01

Question: Located in electric room 0203 along column line “14” just right of existing SWGR #4 there seems to be a panel without a designation; also the same goes for the one just below column line “R” to the left of column line 14. Please advise what the designation of both panels should be.

Response: The two indicated symbol are shown for reference only to bring to the contractors’ attention that the space is occupied. Their designations are not used in the current documents.

54. Reference: Section L – Instructions, Conditions, and Notices to Offerors or Quoters, pg 67, Item B

Question: This section states, “Offerors shall provide 1 to 3 names of potential subcontractors for each discipline that is not performed by the offeror.” Please clarify what is meant by

“each discipline”, does that mean only major subcontractors or all subcontractors. Can you provide a list of disciplines you wish us to name?

Response: Any work that will not be performed by your company and must be accomplished by a subcontractor should be listed. Whether it is electrical, mechanical, plumbing, etc.

should be listed.

55. Reference: Drawing Sheet A03.01 & A03.04

Question: Note #4 on the Reflected Ceiling Plan A03.01 through A03.04 states, “All exposed ceiling surfaces shall be scraped clean, sanded and gypsum skim coated as required to provide a smooth consistent surface for painting. Paint all exposed ceiling surfaces and to include skim coating to 75% of exposed ceilings”, which is in contradiction to the finish schedule as some rooms on the room finish schedule (A7.06) are designated to receive a (31) suspended lay-in acoustical ceiling system which also have a Note 1, to patch, clean and apply skim coat, and paint. Please refer to the list below. Please confirm the scope of work for the ceilings in the following rooms:

Room Ceiling M Ceiling Finish Remarks

0220C 31 PNT -

0202.2 31 Fact 1

2202.1 31 Fact 1

2204.1 31 Fact 1

2206.1 31 Fact 1

2206.2 31 Fact 1

1204 31 PNT 1

1204.1 31 PNT _

1204.2 31 PNT 1

3202.1 31 Fact 1 3204 31 Fact 1

3204.2 31 Fact 1

Response: Room numbers in RCP sheets have been corrected. Refer to Attachments C and D.

56. Reference: Drawing Sheets A01.02, A01.04, A03.02 & A03.04

Question: There are room number discrepancies between the floor plans (A01.02 – A01.04) and the reflected ceiling plans (A03.02 and A03.04). Please review and make changes so the room numbers on the floor plans and reflected ceiling plans match and correspond with the room finish schedule.

Response: Refer to question 55.

57. Reference: General

Question: Is it acceptable to submit a “Teaming Agreement” in lieu of a Joint Venture Agreement for two firms submitting the proposal together? a. Would the team members have to register as one entity in the central contractor registry (www.ccr.gov) even if not forming a Joint Venture for the submission?

Response: A). A teaming agreement is acceptable.

B). No. Only one company needs to be CCR. Please provide copy of the signed agreement with your proposal. As a note the contract will be awarded to that one company that is registered.

58. Reference: Solicitation Page 64

Question: According to the instructions on page 64 of the Solicitation, we are to submit Three (3) originally signed copies of the signed offer (Sections A through K). This instruction is not clear. Some of the items/documents in Sections A through K do not require signatures or action. Do each of the following documents need to be submitted separately from the Technical and Cost/Business Proposals? Do we need to submit three (3) original bid bonds? a. SF-1442. b. Section B – Supplies or Services and Price/Cost. c. Section K – Representations, Certifications, and other statements of offerors. d. Key Personnel, Section H.25. e. Bid Bond. f. Disclosure of Lobbying Activities (SF-LLL).

Response: Please submit one original copy of sections B through I. J, K, L, and M are not required to be returned with your proposal. One original is required.

a). Yes, three original signatures.

b). Yes, One original is required.

c). No, but insure that you have completed section K in ORCA.

d). Yes, One original is required.

e). Yes, One original is required.

f). Yes, One original is required.

59. Reference: Electrical

Question: Do we understand correctly that all station cabling is to terminate in the attic?

Response: All telecommunication cabling for Pilot Plant Phase 2 areas (col. 1 - 11) shall be temporary relocated by the contractor in the Phase 9A/ 9B attic prior to demolition. After new Room 3208A completion, the contractor shall again relocate the Phase 2 cabling to this room with minimal disruption to the users. The fiber optic cable link from the temporary concentrator location in the attic of Phase 9A/ 9B (to the Chemical Wing) shall be extended into the new Phase 9A telecommunication rooms on each floor. The owner shall provide and install the telecommunication switches and final connections to the switches. Coordinate all relocation activities with the Contracting Officer. Refer to Attachments C and D.

60. Reference: Drawing Sheet E03.05

Question: If all structured cabling is not to terminate in the attic, what are the Phase 9B LAN cables that are referred to in note #2 on Plan E03.05

Response: Refer to question 59.

61. Reference: Drawing Sheet Electrical

Question: If all structured cabling is not to terminate in the attic, what backbone is to be installed between closets?

62. Reference: Drawing Sheet E03.05

Question: On plan E03.05, are the 30 Category 6 cables referenced in Note #5 new?

Response: The cables are new. Refer to question 59.

63. Reference: Drawing Sheet E03.05

Question: On plan E03.05, where are the 60 cables referenced in Note #8 being relocated from?

64. Reference: Drawing Sheet E03.05

Question: Is the 100 – 4 conductor, 24AWG telephone cable referenced in Note 10 on plan E03.05 to be (100) Category 6 cables? If not to what does 100-4 conductor, 24 AWG refer?

Response: One hundred, 4 pair, cat 6 cables, 24 AWG.

65. Reference: Drawing Sheet E03.05

Question: Plan E03.05 depicts that a 4-pair fiber cable is to be installed, is this to be a multi-mode or single mode fiber? If multi-mode is it to be 50.1 or 62.5?

66. Reference: Drawing Sheet E03.05

Question: Plan E03.05 depicts a 4-pair fiber cable installed to the relocated LAN panel but no connection to the Telecommunications Cabinet. What is connecting the telecommunications cabinet to the LAN panel?

Response: The telecommunication cabinet is for phones and connects to Chemical Wing for Phase

9A and 9B.

67. Reference: Drawing Sheet E05.02

Question: Plan E5.02, Note 4, refers to a Telephone/LAN terminal board and states to refer to specifications section. Specification section 271000 does not address a Telephone/LAN terminal board. What are the requirements and/or components of this board?

Response: Refer to 27 10 00 - 2.4.1 and 2.4.

68. Reference: Drawing Sheet E05.02

Question: Plan E5.02 has a note 10 which is not shown on the riser. Is this note not used?

Response: Refer to Basement Level continuation arrow.

69. Reference: Drawing Sheet Architectural Details

Question: Are there any details available indicating the construction of the existing Pilot Plant roof?

The Roofing Bidders are asking what is it that they will have to remove.

Response: Detail of roof coverings of the existing building is unavailable.

70. Reference: Drawing Sheet Architectural Details

Question: We cannot locate any dimensions for that area of the Pilot Plant that is to be re-roofed under the Option Price. What is this area?

Response: Dwg. A00.06 Roof Demolition Plan and Dwg. A01.06 has been revised to show the dimensions. Refer to Attachments C and D.

71. Reference: Drawing Sheets A00.01, A01.06, C00.01 & C01.01

Question: We notice that the building footprint for the Pilot Plant, as indicated on Drawings C00.01 and C01.01, does not agree with the footprint indicated on Drawings A00.06 and A01.06.

Which is correct?

Response: The footprint of the building in the Drawings C00.01 and C01.01 has been corrected to agree with A 01.06. Refer to Attachments C and D.

72. Reference: Drawing Sheets S01.06, A01.06 & A02.01

Question: Drawing S01.06, Cut Sections #6 & 7 appear to be mis-labeled. References to A01.06 and A 02.01 should be “S” and not “A”. [We note that none of the Details on Drawing S02.01 follow the Standard Graphic Symbol instructional legend on Drawing T01.04].

Response: Drawing Sheet S01.06 Section through symbol number 6: Delete reference to "A01.06" and insert in its place "S01.06". Delete reference to "A02.01" and insert in its place "S02.01". Refer to Attachment C.

Drawing Sheet S01.06 Section through symbol number 7: Delete reference to "A01.06" and insert in its place "S01.06". Delete reference to "A02.01" and insert in its place "S02.01". Refer to Attachment C.

73. Reference: Drawing Sheets S01.06, S01.05

Question: Confirm that the steel posts identified as Note 12 on Drawing S01.05 are the exact same posts identified as Note 7 on Drawing S01.06.

Response: Posts identified as Note 7 on drawing S01.0 are the same posts identified as Note 12 on drawing S01.06.

74. Reference: Drawing Sheets S01.06.

Question: We do not locate Keyed Notes #13 & 14 on Drawing S01.06.

Response: Drawing Sheet S01.06: Delete Keyed Notes 13 and 14 in their entirety. Refer to

75. Reference: Drawing Sheet S02.01.

Question: Where is Detail 9/S02.01 taken?

Response: Detail 9/ S02.01 will be required to support horizontal ductwork above the roof . Refer to keyed note 12 on S01.06.

76. Reference: Drawing Sheet S01.03.

Question: Phase 8-Power Plant, where is Detail 4/S01.03 taken, and what is the extent of this detail?

Response: Drawing Sheet S01.01 Section through symbol "3/ S01.03". Delete "3" and insert "4" in its place. Refer to 1/A01.01 for additional information regarding pipe trench. Refer to

77. Reference: Drawing Sheet A10.01.

Question: Detail 3/A10.01 indicates ‘Membrane Waterproofing’. Is this item the Bituminous Dampproofing (Specification 07 11 00), or the Metallic Oxide Waterproofing (Specification 07 16 19)? We do not locate a Membrane Waterproofing specification.

Response: Delete reference to "Membrane Waterproofing" note on Detail 3/A10.01 and insert

"Metal-Oxide Waterproofing" in its place. Refer to Attachment C.

78. Reference: Drawing Sheet A00.07, A04.01

Question: Detail 1 on Drawing A00.07 indicates the First Floor Windows between Column Lines 11 and 14 are to remain (they are not dashed, nor does Keyed Note 10 appear). However, Detail 1 on Drawing A04.01 indicates these same openings are to receive new insulated window units, per Keyed Note 18. Clarify. Similarly, this question applies to window openings between Col. Lines 11 and 13 at the First Floor on Detail 2.

Response: Correct. On First Floor windows between Col. # 11 thru #14, existing window system

(Framing) remains as is (as shown on Dwg. A00.07) but these existing windows on first floor do not have insulated metal panels on top panels (refer to Window Schedule on Dwg. A09.01). So, this portion of the existing window on both North and South Elevations require new insulated metal panels as noted on Dwg. A04.01.

79. Reference: Specification Section 23 08 00.10

Question: In the retro commissioning option spec 23 08 00.10, is the TAB contractor hired directly by the general contractor separately from the RCxC? Is TAB not within the scope of the RCxC?

Response: The TAB contractor is hired directly by the Retro Cx Contractor or by the General

Contractor as part of the Retro Cx team.

80. Reference: Solicitation

Question: Can the RCxC firm partner with a TAB contractor to bid the retro commissioning? Can the partnership be regarded as one subcontractor to the general contractor?

Response: Governments privity of contract is with the Prime contractor. Prime contractors are responsible for any subcontract awards and administration. Prime Contractor shall assure all contract required certifications and qualifications are in accordance with the contract documents, plans and specifications.

81. Reference: Solicitation

Question: Our company may not be certified for the Retro Commissioning firm (RCxC) per the specs, but we have experienced licensed professional engineers that are LEED AP. Can we still bid the commissioning for the new work per Section 23 08 00.20 for Phases 8, 9A and 9B as part of the contractor’s commissioning team?

Response: The approved Retro Cx firm shall comply with all contract requirements. Certifications are a contract requirement.

82. Reference: Specification Section 23 08 00.20

Question: Are there any certifications we must meet for commissioning the new work in 23 08 00.20? I could find only Section 1.5 (pg 5): “A minimum of five years and three similar commissioning projects of size, type (laboratory) and budget are required of all commissioning team members”.

Response: No Cx certifications are required for Cx of new building systems. Personnel who make up the Cx team shall meet the requirements indicated in the contract documents.

83. Reference: Specification Section 23 08 00.20

Question: I thought section 23 08 00.20 is just for the new work; but, there are references to retro commissioning. Does 23 08 00.20 pertain to just commissioning the new work?

Response: Section 23 08 00.20 pertains to Cx new building systems.

84. Reference: Specification Section 23 08 00.20

Question: 23 08 00.20 defines contractor's overall responsibility for commissioning. Is the CxA.s specific scope of work entirely contained in this section and Appendices?

Response: The CxAs responsibilities are included in section 23 08 00.20, all references listed in section 23 08.00 20, and any other activity to ensure the owner that the systems are functioning as intended.

85. Reference: Drawing Sheets Electrical

Question: Is Cat 6 or Cat 6e cabling required?

Response: Cat 6

86. Reference: Drawing Sheets Electrical

Question: Clarify the type (wall or floor mounted), and quantity (1 per telecom room) of racks/cabinets to be provided.

Response: Refer to 27 10 00 - 2.4

87. Reference: Drawing Sheets Electrical

Question: What is the concentrator panel?

Response: Four Cisco switches one unit high.

88. Reference: Drawing Sheets Electrical

Question: Are bidders to assume ALL new termination hardware (patch panels)?

Response: Provide new raceways, cable, connectors, devices, cover plates, etc. per section 27 10

00.

89. Reference: Drawing Sheets Electrical

Question: What type of fiber and connectors?

90. Reference: General

Question: The contract documents states we can use approved equals to Berk-Tek and AMP; please advise if Commscope Uniprise is considered an equal.

Response: An approved substitution shall be reviewed during the submittal phase to determine if the product data meets the basis of design.

91. Reference: General

Question: The staffing requirement for the CQC Control Organization seems to be excessive and extremely expensive considering the size of this project. The needs for Civil, Structural and Architectural Engineers as well as an on-site Submittal Clerk are extreme considering the extent of the work for these personnel. Having a full time Mechanical Engineer and Electrical Engineer is also quite expensive. It would make more sense to have them come in at regular intervals 2 times a month or 1 time per week or break it down in required hours per month or per week would be reasonable. This could save a boat load of money. Can the Electrical QC personnel Specialist be a Licensed Electrician in lieu of a graduate Engineer?

Response: Specification Section 01 45 04.00 10, paragraph 3.4.1, fourth sentence: Delete the reference "at all times" and insert in its place "one 8 hour day per week". Refer to Attachment B. Electrical engineer is required.

92. Reference: General

Question: Can the Mechanical QC Specialist be a Pipe Fitter Foreman, Sheet Metal Foreman or Plumber in lieu of a graduate Engineer?

Response: Provide as specified.

93. Reference: Drawing Sheet C00.01

Question: What is the extent of the work per note 9 on Sheet C00.01, Phase 9A and 9B, which states, “New Bicycle Lock Up”?

Response: Drawing Sheet C00.01, Keyed Note 9: Add the following to the end of the note: " -existing to remain". Refer to Attachment C.

94. Reference: Drawing Sheet General

Question: Are there As-Built Drawings available for this building and how can we access them?

Response: The contractor shall have access to the facility's limited paper and electronic as builts.

95. Reference: Drawing Sheet Architectural

Question: What is the overall thickness of the concrete between floors?

Response: Refer to detail 2 on S02.01.

96. Reference: General

Question: Can machinery such as a propane Bob-cat be used during the interior demolition?

Response: With weight of the equipment loaded, and vibration, noise, and fumes of the equipment during operation, this equipment shall not be used.

97. Reference: General

Question: The freight elevator is located just outside of the renovation area grid line, can this elevator be accessed by contractors to move equipment from floor to floor, before or after normal work hours of the building occupants?

Response: The freight elevator is off limits to construction personnel. The contractor's construction lift must be used for all material and equipment access.

98. Reference: General

Question: The SOW identifies the need to remove and dispose of bulbs and ballast, what is the total number needing to be removed and disposed of?

Response: Refer to Attachment F.

99. Reference: General

Question: Is there a hazardous materials survey available identifying all asbestos and lead contained materials?

Response: Refer to amendment 2 question 37.

100. Reference: General

Question: What is the maximum load for the exterior stairway?

Response: The temporary stair loads shall conform to OSHA standards, IBC Standards, and any anticipated heavier loads. The contractor shall provide this information during submittal review.

101. Reference: Drawing Sheet E05.04

Question: What is meant by “100 empty cable” shown on the Security System Riser Diagram on drawing E05.04 that shows going from the security back box in Electric Room 0203 and running up to the attic ? Are you looking for an empty raceway, if so should it be a 103?

Please advise.

Response: Drawing Sheet E05.04, Riser 1: Delete reference to "100 Empty Cable" and replace with

"4 inch Empty Conduit". Refer to Attachment C.

102. Reference: Drawing Sheet E03.01

Question: Basement Fire Alarm & Communication plan E03.01 does not indicate cable tray to be installed. Is that the intent? Please advise.

Response: Due to the extent of mechanical equipment in the corridor in the Basement, a cable tray will not fit. Therefore, keyed note 10 on E05.02 provides individual conduit raceways for the telecommunication cabling from the device to the telecommunication room. Fire detection cabling is installed per section 28 31 64.00 10. Refer to Attachments C and D.

103. Reference: Drawing Sheet A09.01

Question: Under the window schedule on sheet A09.01, there is no Type 1 window specification.

Please provide.

Response: Drawing Sheet A09.01 Window Schedule: Insert "Type 1 window is existing to remain".

Refer to Attachment C.

104. Reference: Drawing Sheet A01.03

Question: On drawing A01.03, room 2208B, there are two pieces of equipment EN-01 and EN-02.

Are these pieces owner furnished contractor installed or contractor furnished contractor installed? Please provide information.

Response: Drawing Sheet A01.03, Room 2208B: Delete references "EN-01" and "EN-02". Refer to

105. Reference: Drawing Sheet S01.06

Question: On Dwg S01.06 there are many new steel beams and frame outs for new openings shown but no designation of what type of steel is needed. Please provide typical detail/direction.

Response: Refer to details on Drawing S02.01.

106. Reference: Drawing Sheet Architectural

Question: Please verify that fireproofing is strictly on any new steel beams, columns, decking (at infills only) and that no existing steel components will require spray fireproofing?

Response: Refer to section 07 81 00 - 1.2.1.

107. Reference: Drawing Sheet M3.01/M3.02

Question: Note B M3.01/M3.02. Please provide material of construction of ductwork between air valve and shaft.

Response: For fume hood exhaust fans the duct between the air valve and chase shall be stainless steel . For general exhaust fans the ductwork between air valve and chase may be galvanized.

108. Reference: Specifications Mechanical

Question: We’ve been unable to locate a specification for the DI water piping. Please provide direction.

Response: Specification provided. Refer to Attachments B and E.

109. Reference: Drawing Sheet M3.01/M3.02

Question: In the commissioning specification 23 08 00, there is no role assigned for a 3rd party commissioning agent. However, there are several small commissioning/ validation/ controls scope items which pertain to newly installed work in the retro-commissioning specification 23 08 00.00 10. Please verify that the only 3rd party commissioning required for phases 8, 9A, and 9B are the items specifically discussed in the retro-commissioning specification.

Response: Correct.

110. Reference: Drawing Sheet P00.05

Question: There is no demolition of existing fire protection is drawn in the attic on P00.05, only a general note which states existing sprinkler is to be removed. Please outline extent of sprinkler demo. Also please state the areas in the attic where new fire protection is required. The main is shown branching off of the riser near 10/11 line stairwell but is hashed off for clarity at 11 & R/S and disappears from there. Is the intent to install fire protection at all "phase 9A/9B" spaces even the space along column lines 20 & 21.

Response: Entire attic existing sprinkler system is to be removed and replaced with a NFPA 13 designed system between column lines 11 - 17, and connecting to stairway standpipe.

111. Reference: Drawing Sheet 1/M6.03

Question: Detail 1/M6.03 shows a canister humidifier CHUM-1. We have been unable to locate this in the drawings. Does this occur anywhere?

Response: Humidifier CHUM-1 is incorrectly labeled and is included in the package unit ACU-1.

Drawing Sheet M06.03, detail 1: "Delete detail in its entirety". Refer to Attachment C.

112. Reference: Addendum #1

Question: Per Addendum #1 and added Paragraph 1.4.3, Retro Commissioning, submittals are due 60 to 90 days after notice to proceed. However, per Section F of Addendum #1, the Owner may take 60 days after the NTP to award this option. If that were the case, it would be difficult to make submissions within 60 to 90 days. Clarify.

Response: The owner will award option 2 or 3 at bid. The Retro Cx plan must be submitted by the contractor and approved by the architect (within the time frame in section 01 33 00) 60 to 90 days after the NTP.

ATTACHMENT “B”

Changes to Specifications

1. Specification Section 01 45 04.00 10 Contractor Quality Control

1.1 Paragraph 3.4.1, fourth sentence:

1.1.1 Delete the reference "at all times" and insert in its place "one - 8 hour day per week".

2. Specification Section 07 60 00 Flashings and Sheet Metals

2.1 Add "Section 07 60 00 Flashing and Sheet Metals" in its entirety. Refer to Attachment E.

3. Specification Section 07 95 13 Expansion Joint Cover Assemblies

3.1 Add "Section 07 95 13 Expansion Joint Cover Assemblies" in its entirety.

Refer to Attachment E.

4. Specification Section 22 41 60 Deionized Water System

4.1 Add "Section 22 41 60 Deionized Water System" in its entirety. Refer to Attachment E.

5. Section 23 09 54.00 20 Direct Digital Control System

5.1 Paragraph 1.4.a: Add the following to the end of the paragraph:

5.1.1. "Provide gateway controls, new control devices to replace existing, and programming as required to monitor and control new equipment and existing points."

6. Section 23 22 26.00 20 Steam System and Terminal Units

6.1 Paragraph 3.1.1.: Add the following to the end of the paragraph:

6.1.1 "At the new boiler B-4, provide angle type nonreturn stop and boiler check valves designed for 250 psig (1725 kPa) steam working pressure."

7. Section 23 52 49.00 20 Steam Boilers and Equipment

7.1 Paragraph 2.1: Delete “conforming to MIL-B-17452 except that,” and add “as referenced in F-B-2903.” Treatment and painting shall be in accordance with manufacturer’s standard practice.

7.2 Paragraph 2.1: Delete “include a repetitive self-checking circuit to check components at intervals not to exceed the specified flame failure response time in MIL-B-17452 during the entire period of burner operation,”

7.3 Paragraph 2.1: Change “Boilers shall be semi-automatic. Modify MIL-B- 17452 as follows” to “Add an assured low fire cut-off circuit. The boiler requirements are as follows:

7.4 Paragraph 2.1.1a.: Delete “MIL-B-18796 with”

7.5 Paragraph 2.1.1a.(6): Change “(4:1) oil” to (8:1) oil”.

7.6 Paragraph 2.1.1b.: Add ”Boiler shall meet 90-PPM NOx when firing No.

2 oil with a maximum fuel-bound nitrogen content of 0.015%, by weight.

7.7 Paragraph 2.1.1d.: Delete entire paragraph. A second flue gas recirculation valve is not required.

7.8 Paragraph 2.1.3.: Add the following: “The panel and instruments indicated below in Parts 2.1.3.a through c (gage, draft gauge and smoke density indicator) are to be provided by the installing contractor. The boiler manufacturer shall include the flame safeguard in the boiler mounted control panel in Part 2.1.3.d.”

7.9 Paragraph 2.1.3d.: Change “Controller shall be of the non recycle type.”

to “Controller shall be of the non recycle type, requiring manual reset for safety shutdowns.”

7.10 Paragraph 2.1.3d.: In the last sentence, change “installed in control panel” to “installed in boiler control panel”

7.11 Paragraph 2.1.5: Add “A boiler mounted panel includes NEMA 12 construction with 14 gauge steel.

7.12 Paragraph 2.1.5.1: Delete the following “Power leads to and from magnetic starters and contactors shall terminate at terminal blocks so that field wiring is necessary only from terminal blocks to external equipment.

Control leads to and from external control devices shall terminate at separate terminal blocks from power leads.”

8. Section 23 73 13 Central Station Air Handling Units

8.1 Paragraph 2.1.2., Add the following:

8.1.1 For each air handling unit, provide factory mounted pitot tube air flow measuring stations in the inlet of each supply and return fan (where used), to be used to measure air flow under DDC work.

ATTACHMENT “C”

Changes to Drawings

VOLUME 1 – PILOT PLANT

General Drawings:

1. Drawing Sheet T01.03R:

1.1 Delete Drawing Sheet T01.03R and insert Drawing Sheet T01.03R2 in its place. Refer to Attachment D.

Civil Drawings:

1. Drawing Sheet C00.01:

1.1 Delete Drawing Sheet C00.01 and insert Drawing Sheet C00.01R1 in its place. Refer to Attachment D.

1.2 Keyed Note No. 9

1.2.1 Add the following to the end of the note: "- existing to remain".

2. Drawing Sheet C01.01:

2.1 Delete Drawing Sheet C01.01 and insert Drawing Sheet C01.01R1 in its place. Refer to Attachment D.

Architectural Drawings:

1. Drawing Sheet A00.06:

1.1 Delete Drawing Sheet A00.06 and insert Drawing Sheet A00.06R1 in its place. Refer to Attachment D.

2. Drawing Sheet A01.03:

2.1 Room 2208B

2.1.1 Delete references "EN-01" and "EN-02" in their entirety.

3. Drawing Sheet A01.06:

3.1 Delete Drawing Sheet A01.06 and insert Drawing Sheet A01.06R1 in its

4. Drawing Sheet A03.01:

4.1 Delete Drawing Sheet A03.01 and insert Drawing Sheet A03.01R1 in its

5. Drawing Sheet A03.02:

5.1 Delete Drawing Sheet A03.02 and insert Drawing Sheet A03.02R1 in its

6. Drawing Sheet A03.03:

6.1 Delete Drawing Sheet A03.03 and insert Drawing Sheet A03.03R1 in its

7. Drawing Sheet A03.04:

7.1 Delete Drawing Sheet A03.04 and insert Drawing Sheet A03.04R1 in its

8. Drawing Sheet A04.01:

8.1 General Note D, last sentence:

8.1.1 Delete the word "not" in its entirety.

9. Drawing Sheet A09.01:

9.1 Window Schedule:

9.1.1 Insert "Type 1 window is existing to remain".

10. Drawing Sheet A10.01:

10.1 Section 3:

10.1.1 Delete "Membrane Waterproofing" and insert "Metal-Oxide Waterproofing" in its place.

Structural Drawings:

1. Drawing Sheet S01.06:

1.1 Section through symbol number 6:

1.1.1 Delete reference to "A01.06" and insert in its place "S01.06".

1.1.2 Delete reference to "A02.01" and insert in its place "S02.01".

2.1 Section through symbol number 7:

2.1.1 Delete reference to "A01.06" and insert in its place "S01.06".

2.1.2 Delete reference to "A02.01" and insert in its place "S02.01".

3.1 Keyed Notes 13 and 14:

3.1.1 Delete references to "Keyed Note 13 and 14" in their entirety.

Mechanical Drawings:

1. Drawing Sheet M06.02:

1.1. In the text below item 2, RTU-4 CONTROL DIAGRAM, under the paragraph OUTSIDE AIR CONTROL, add the following:

1.1.1 "FAN TRACKING: SUPPLY AND RETURN FANS SHALL

BE PROVIDED WITH FACTORY MOUNTED PITOT

TUBE AIR FLOW MEASURING STATIONS. THE DDC

SYSTEM SHALL PROVIDE A CONSTANT

DIFFERENTIAL OF 800 CFM (ADJ), BALANCED TO

MAINTAIN POSITIVE BUILDING PRESSURIZATION,

THROUGH CONTROL OF THE RETURN FAN VFD."

2. Drawing Sheet M06.03:

2.1 Detail 1:

2.1.1 Delete detail in its entirety.

Plumbing Drawings:

1. Drawing Sheet P01.01:

1.1 Mechanical Room #2 - 0206

1.1.1 Provide two inch copper water pipe from col. line 12T to 10R to maintain emergency shower operation in existing Phase 2.

Pipe shall be installed prior to demolition of existing Phase 9A and 9B water piping.

Electrical Drawings:

1. Drawing Sheet E03.05:

1.1 Delete Drawing Sheet E03.05 and insert Drawing Sheet E03.05R1 in its

2. Drawing Sheet E05.02:

2.1 Delete Drawing Sheet E05.02 and insert Drawing Sheet E05.02R1 in its

3. Drawing Sheet E05.04:

3.1 Riser 1

3.1.1 Delete reference to "100 Empty Cable" and replace with "4 inch Empty Conduit".

VOLUME 2 – POWER PLANT

General Drawings:

1. Drawing Sheet T01.03R:

1.1 Delete Drawing Sheet T01.03R and insert Drawing Sheet T01.03R2 in its place. Refer to Attachment D.

Structural Drawings:

1. Drawing Sheet S01.01:

1.1 Section through symbol 3/ S01.03:

1.1.1 Delete reference to "3" and insert in its place "4".

Mechanical Drawings:

1. Drawing Sheet M00.03:

1.1 For the valve located near grid lines I-5, above the stairs, at the end of the 200 HPS header, add the label: "REMOVE VALVE"

2. Drawing Sheet M01.01:

2.1 Piping arrangement and valves at the cooling towers have been modified. Refer to the Attachment D, sketch SKM-1.

3. Drawing Sheet M01.04:

3.1 For the valve located near grid lines I-5, above the stairs, at the end of the 200 HPS header, change the label to: "150 MM NEW VALVE"

4. Drawing Sheet M03.01:

4.1 Piping arrangement and valves at the cooling towers have been modified. Refer to the Attachment D, sketch SKM-2.

5. Drawing Sheet M05.01:

5.1 Piping arrangement and valves at the cooling towers have been modified. Refer to the Attachment D, sketch SKM-3.

ATTACHMENT “D”

Added Drawings and Sketches

The following drawings have been revised or added

Volume 1

General:

1. Drawing Sheet T01.03R2

2. Drawing Sheet C00.01R1

3. Drawing Sheet C01.01R1

4. Drawing Sheet A00.06R1

5. Drawing Sheet A01.06R1

6. Drawing Sheet A03.01R1

7. Drawing Sheet A03.02R1

8. Drawing Sheet A03.03R1

9. Drawing Sheet A03.04R1

10. Drawing Sheet E03.05R1

11. Drawing Sheet E05.02R1

Volume 2

General:

12. Drawing Sheet T01.03R2

13. Drawing Sheet M01.01, Sketch SKM-1

14. Drawing Sheet M03.01, Sketch SKM-2

15. Drawing Sheet M05.01, Sketch SKM-3

ATTACHMENT “E”

Added Specifications

The following specifications have been revised or added

1. Table of Contents

2. Section 07 60 00.00…