QA2.pdf
PDF 9 KB Posted
- Solicitation number
- AG-3434-S-16-0003
About this file
Additional Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| 2SF_30-signed.pdf | ||
| SF_30-signed.pdf | ||
| site_visit_attendence_sheet.pdf | ||
| west_side.JPG | JPG image | |
| QA.pdf | ||
| east_side.JPG | JPG image | |
| AG-3434-S-16-0003_Roof.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDITIONAL QUESTIONS
AG-3434-S-16-0003
MONONGAHELA NATIONAL FOREST
YOKUM STREET VEHICLE STORAGE BUILDING METAL ROOF INSTALLATION
The following additional questions have been answered:
What size are the gutters?
Answer: The gutters shall be 6” aluminum seamless gutters. The gutters on the large building shall have an expansion or division joint at the mid point.
Where is the 2” wd required in Section 3.4 METAL ROOF PANEL INSTALLATION GENERAL Sub Section A. General: Item # 5. “Install 2” wd. Lateral supports to compensate for lack of structural integrity of the roof sheathing over the entire roof.”, ?
Answer: The 2” wd is Item 004 in the Schedule of Items, Roof Wood Framework, and is also referred to as wood sleepers in the Scope of Work.
What are the hours of work?
Answer: Section 011000 Summary, Part 1, 1.2 A states, “Perform construction only during working hours (7 AM to 5 PM, Monday thru Friday, other than holidays), unless otherwise agreed to in advance by the COR.” The Contractor is expected to work diligently during working hours when conditions are safe and suitable. The Contractor shall notify the COR if it is necessary to work during times other than those listed because of the weather or to finish up a task.