Description_of_Work.docx
DOCX document 13 KB Posted
- Solicitation number
- AG-3395-S-16-0019
About this file
Description of Work - Raven Cliff Road
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_Questions-Raven_Cliff_.docx | DOCX document | |
| Davis_Bacon_Wage_Determination.docx | DOCX document | |
| Request_For_Quotation_Raven_Cliff.doc | DOC document | |
| FS_Supplemental_Specifications_-_Raven's_Cliff_Road_Repair.docx | DOCX document | |
| RD_RPR_PLNS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Description of Work – Raven Cliff Road
| BMP |
| EMP |
| Item Description |
| Quantity |
| Unit |
| 0.00 |
| 0.15 |
| Remove/repave w Bituminous Surface Treatment |
| 0.15 |
| MI |
| 0.15 |
| 0.90 |
| Aggregate Surface Replacement, Compaction Method B |
| 600 |
| TN |
| 0.15 |
| 0.90 |
| Road Reconditioning |
| 0.75 |
| MI |
Pay item 303.07 consists of reconditioning of the roadway, ditches and aggregate surface according to FP-03 Section 303.07, Roadway Reconditioning. Reconditioning of ditches on the paved section of the road (M.P 0.00 to 0.015) is considered incidental to this item.
Pay item 403.01 consists of removing existing asphalt surface and subgrade from M.P. 0.0 to M.P. 0.15 in accordance with FP-03 Section 403. Excavate 6” below the existing asphalt and properly shape and compact the subgrade. Place and roller compact 6” (uncompacted depth) of VA #21B. Place 2” compacted depth of VA BM-25A and top with 1” compacted depth of VA SM-9.5A. Final surface shall be as close to the existing width, lines and grades as possible and shall provide a smooth transition at M.P 0.00 and M.P. 0.15. Aggregate and subgrade preparation related to pavement replacement is considered incidental to this item.
Pay item 322.01 consists of the placement of VA #26 aggregate in accordance with FP-03 Supplemental Specification 322. Roadway shall be prepared in accordance with item 303.07 prior to placement. Final depth of aggregate shall be 2” to 3” (compacted).
Pay item 625.08 consists of seeding and mulching all disturbed areas in accordance with FP-03 Supplemental Specification 625.
*A catalog of Forest Service typical drawings and construction details are included for reference.
File details come from the government source that posted it. Updated .