Revised Schedule of Items pages for Bid Option 1 and Bid Option 2

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION RFQAG-3395-S-16-0012
FSR 618 Slide Repairs
Mount Rogers NRA
Revised Pages

BID OPTION 1

ITEM
DESCRIPTION
METHOD OF MEASURE
EST. QUANTITY
PAY UNIT
UNIT PRICE
TOTAL
154(01)
Contractor sampling and testing
LSQ
1
LS
157(02)
Silt Fence
AQ
200
LF
157(10)
Geogrid Cellular Confinement
LSQ
1
LS
203(05)
Removal: Existing Culverts
CQ
4
EA
204(50)
Roadway and site excavation, Compaction Method A, Tolerance Class C, Finishing Method B
LSQ
1
LS
251(01)
Machine placed rip-rap, VDOT Class I
VQ
15
TN
308(02)
Roadway aggregate (VA#26), compaction method 2
CQ
195
TN
602(01)A
18” CMP 2-2/3”x1/2”, Type II Aluminized Coating, 0.079” Thickness (14 gauge)
AQ
72
LF
602(01)B
24” CMP 2-2/3”x1/2”, Type II Aluminized Coating, 0.079” Thickness (14 gauge)
AQ
28
LF
625(28)
Seeding, fertilizing and mulching, hydraulic or dry method
LSQ
1
LS
635(01)
Temporary Traffic Control
LSQ
1
LS

TOTAL BID OPTION 1 AMOUNT = $________________

BID OPTION 2

ITEM
DESCRIPTION
METHOD OF MEASURE
EST. QUANTITY
PAY UNIT
UNIT PRICE
TOTAL
154(01)
Contractor sampling and testing
LSQ
1
LS
157(10)
Geogrid Cellular Confinement
LSQ
1
LS
203(05)
Removal: Existing Culverts
CQ
4
EA
204(50)
Roadway and site excavation, Compaction Method A, Tolerance Class C, Finishing Method B
LSQ
1
LS
251(01)
Machine placed rip-rap, VDOT Class I
CQ
10
TN
308(02)B
Roadway aggregate (VA#26), compaction method 2
CQ
205
TN
602(01)
18” CMP 2-2/3”x1/2”, Type II Aluminized Coating, 0.079” Thickness (14 gauge)
AQ
100
LF
625(28)
Seeding, fertilizing and mulching, hydraulic or dry method
LSQ
1
LS

TOTAL BID OPTION 2 AMOUNT = $________________

Contractor Acceptance Statement: By signing the offer, the Contractor agrees to all terms, conditions, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule unless otherwise excepted as follows: