| CONSTRUCTION RFQ | AG-3395-S-16-0012 |
| FSR 618 Slide Repairs |
| Mount Rogers NRA |
| Revised Pages |
BID OPTION 1
| ITEM |
| DESCRIPTION |
| METHOD OF MEASURE |
| EST. QUANTITY |
| PAY UNIT |
| UNIT PRICE |
| TOTAL |
| 154(01) |
| Contractor sampling and testing |
| LSQ |
| 1 |
| LS |
| 157(02) |
| Silt Fence |
| AQ |
| 200 |
| LF |
| 157(10) |
| Geogrid Cellular Confinement |
| LSQ |
| 1 |
| LS |
| 203(05) |
| Removal: Existing Culverts |
| CQ |
| 4 |
| EA |
| 204(50) |
| Roadway and site excavation, Compaction Method A, Tolerance Class C, Finishing Method B |
| LSQ |
| 1 |
| LS |
| 251(01) |
| Machine placed rip-rap, VDOT Class I |
| VQ |
| 15 |
| TN |
| 308(02) |
| Roadway aggregate (VA#26), compaction method 2 |
| CQ |
| 195 |
| TN |
| 602(01)A |
| 18” CMP 2-2/3”x1/2”, Type II Aluminized Coating, 0.079” Thickness (14 gauge) |
| AQ |
| 72 |
| LF |
| 602(01)B |
| 24” CMP 2-2/3”x1/2”, Type II Aluminized Coating, 0.079” Thickness (14 gauge) |
| AQ |
| 28 |
| LF |
| 625(28) |
| Seeding, fertilizing and mulching, hydraulic or dry method |
| LSQ |
| 1 |
| LS |
| 635(01) |
| Temporary Traffic Control |
| LSQ |
| 1 |
| LS |
TOTAL BID OPTION 1 AMOUNT = $________________
BID OPTION 2
| ITEM |
| DESCRIPTION |
| METHOD OF MEASURE |
| EST. QUANTITY |
| PAY UNIT |
| UNIT PRICE |
| TOTAL |
| 154(01) |
| Contractor sampling and testing |
| LSQ |
| 1 |
| LS |
| 157(10) |
| Geogrid Cellular Confinement |
| LSQ |
| 1 |
| LS |
| 203(05) |
| Removal: Existing Culverts |
| CQ |
| 4 |
| EA |
| 204(50) |
| Roadway and site excavation, Compaction Method A, Tolerance Class C, Finishing Method B |
| LSQ |
| 1 |
| LS |
| 251(01) |
| Machine placed rip-rap, VDOT Class I |
| CQ |
| 10 |
| TN |
| 308(02)B |
| Roadway aggregate (VA#26), compaction method 2 |
| CQ |
| 205 |
| TN |
| 602(01) |
| 18” CMP 2-2/3”x1/2”, Type II Aluminized Coating, 0.079” Thickness (14 gauge) |
| AQ |
| 100 |
| LF |
| 625(28) |
| Seeding, fertilizing and mulching, hydraulic or dry method |
| LSQ |
| 1 |
| LS |
TOTAL BID OPTION 2 AMOUNT = $________________
Contractor Acceptance Statement: By signing the offer, the Contractor agrees to all terms, conditions, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule unless otherwise excepted as follows: