Revised_page_32_of_FS_Supp_Specs_-_FS_618.pdf
PDF 17 KB Posted
- Solicitation number
- AG-3395-S-16-0012
About this file
Revised Page 32 of FS Supp Specs document
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised_Page_3_of_Plans_Drawings_FS_618.pdf | ||
| Amendment_0001.docx | DOCX document | |
| Revised_SOI_pages_Bid_Option_1_and_Bid_Option_2.docx | DOCX document | |
| Revised_page_7_Plan_Drawings_FRS_618.pdf | ||
| Revised_Page_4_of_Plans_Drawings_FS_618.pdf | ||
| Wage_Determination.docx | DOCX document | |
| Plans_Drawings_FS_618_Road_Slide_Repair.pdf | ||
| FS_Supp_Specs_-_FS_618_Road_Slide_Repair.docx | DOCX document | |
| Request_For_Quotation_FSR_618.doc | DOC document | |
| Contractor's_Experience_questionnaire 1 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FS 618 Road Slide Repair Page 32 of 34 Suppl. Specifications
Table 625-1
EROSION CONTROL SEED MIX
Item Type Lb/Acre
Seed
Hard Fescue 25
Annual Ryegrass 40
White Dutch Clover (Inoculated with Bacteria) 5
Perrenial Ryegrass 30
Fertilizer 10-10-10 (or equivalent nutrients) 1000
Lime Agricultural Limestone 1200
Mulch Wood or Cellulose Fiber, or Recycled Paper 2000
Straw 4000
The above seeding mix shall be used from March 1 to October 15. Permanent seeding seasons are from
March 1 to June 30, and August 15 to October 15.
Placement of seed outside of these permanent seeding seasons will require temporary seeding, with
Annual Rye at 50 lbs/acre, 1500 lbs/acre of 10-10-10 fertilizer, and mulching rates as shown above.
For temporary seeding from October 15 to March 1, use 50 lbs/acre of Cereal Rye (Abruzzi), 1500 lbs/acre of 10-10-10 fertilizer, and mulching rates as shown above.
Seeding seasons may be adjusted based on weather conditions when approved in advance by the engineer. If temporary seeding is necessary, Contractor shall be required to arrange for permanent seeding to occur in the next available permanent seeding season.
The contractor shall notify the COR at least 24 hours prior to all seeding.
625.04_0808_us_04_21_2005
625.04 Preparing Seedbed.
Delete the subsection and add the following:
The areas to be seeded shall be finished as required by other applicable sections to the lines and grades described in the specifications and shown on the plans. Remove all weeds, sticks, stones, and other debris detrimental to application, growth, or maintenance of the turf. Areas that are damaged by
File details come from the government source that posted it. Updated .