Children's_Forest_Description_of_Work_rev.docx

DOCX document 58 KB Posted

Attached to
Repair of Children's Forest Road
Solicitation number
AG-3395-S-15-0018
Issued by

About this file

Description of Work

View the file

Other files

File Type Posted
Children's_Forest_Supplemental_Specs.docx DOCX document
Children's_Forest_Road_PLANS.pdf PDF
AG-3395-S-15-0018 _Children's_Forest.pdf PDF
Contractor's_Experience_questionnaire 1 .pdf PDF
VA128_dvb.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FSR No. 351 Children’s Forest Road Description of Work and Special Project Specifications

Remove and replace inadequate 24” corrugated steel culverts, and restore ditches according to Table 1. Place crusher run aggregate at a depth of 3” (compacted) for 40’ on either side of the new culvert installation. Place riprap as designated in Table 1, in accordance with the typical section below, and as directed by the Engineer.

MP
24” CMP (LF)
DITCH (LF)
AGGREGATE (TONS)
3.08
28
100
15
8.3
22
150
15
8.51
26
50
15
Total
76
300
45

Table 1- Spot Surfacing, Culvert Replacement, Ditching, and Riprap Locations and Quantities

Road reconditioning includes surface blading of the road, cleaning the ditches and culverts, and placing 3” of aggregate at locations designated in Table 2.

Blade the road to remove any rough, uneven, and irregular surfaces, including ripping, filling and compacting potholes. Reconstruct and remove debris from ditches and a minimum of 3’ inside culvert ends to ensure proper drainage. Final ditch geometry shall be in accordance with “Typical Section”. Remove debris from culvert outlet channels to daylight.

BEGIN MP
END MP
AGGREGATE (TONS)
RIPRAP (TONS)
2.85
2.96
100
5
5.11
5.27
140
0
5.71
5.76
50
0
8.18
8.40
190
0

Total

480
5

Table 2- Road Reconditioning and Surfacing Locations and Quantities

General Notes

1. The contractor shall be responsible for contacting MISS UTILITY in advance of any work on the road to identify any existing utilities that may parallel the road.

2. Seed and mulch all disturbed locations.

3. All turnouts and curve widened areas are considered part of the roadway and shall be included with surface blading, ditch, and culvert cleaning work at no additional cost.

4. Rocks (larger than 2 inches), sediment, wood debris (larger than 1.5 inches and 18 inches long), leaves and other debris in the ditch line shall be removed and wasted over the fill slope or as directed by the Engineer.

5. Roadbed must be approved in writing by the Contracting Officer’s Representative (COR) prior to placing any aggregate on the road.

6. During removal of protruding rocks from roadbed and ditch lines, all suitable material shall be conserved and kept within the traveled way.

7. Backslopes shall not be undercut. Drainage structures and road appurtenances shall not be damaged during this operation and the contractor will be responsible for any damage that occurs from this operation. Handwork required to properly connect ditch flow lines to drainage structure inlets is incidental to Pay Item 303.18, Road Reconditioning, Roadbed. Any existing damaged culverts shall be brought to the COR’s attention for repair by the Forest Service.

8. When ditch bottoms are soft or if there is standing water present, avoid running the motor grader tire in the ditch. Reshape the ditch using the extended blade of a motor grader.

9. All suitable material excavated out of the ditch, and having the same character as the road surface, shall be reclaimed and used within the traveled way. Unsuitable material shall be wasted beyond and below the outer edge of the road shoulder or as directed by the COR.

10. Contractor shall test aggregate according to The Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects (FP-03), Section 154. Testing for gradation, moisture content, and maximum density shall be performed for every 1,000 tons of aggregate or other approved testing frequencies at the quarry and at the project location.

11. Compaction shall be performed with a motor grader and / roller to meet the requirements of FP-03, Subsections 301.04 and 301.05. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content within 2 percent of the optimum moisture content determined by AASHTO T 99 or other approved testing procedures. Compact aggregate to at least 95 percent of maximum density determined by AASHTO T 99 or other approved testing procedures. Determine the in-place density and moisture content according to AASHTO T 310 or other approved testing procedures.