Schedule_of_Items.pdf
PDF 343 KB Posted
- Attached to
- Eagle Knob Road Resurfacing Federal contract opportunity
- Solicitation number
- AG-3395-S-15-0016
About this file
Amendment 1 Revised Schedule of Items.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_Signed.pdf | ||
| PreBidAttendees.pdf | ||
| SF30.pdf | ||
| Eagle_Knob_drainage_Plans_REVISED.pdf | ||
| SubmittalCopy.pdf | ||
| AG4756S150016.pdf | ||
| All_Attachments.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I – THE SCHEDULE
SECTION B - Supplies or Services and Prices/Costs Schedule of Items
Bid Item 1, Base Bid: Work consists of resurfacing designated sections of Eagle Knob Road, FSR #238, with asphalt pavement, repairing road base by removing and replacing existing base material and/or using asphalt base mix, replacing approximately 10 culverts, and cleaning ditches and culverts. Work will be performed from MP 0.00 – 1.46.
Item
Number Description
Method of
Measurement Unit Quantity Unit Price Total
151.01 Mobilization LSQ
Lump
Sum 1 $ $
303.20 Ditch Cleaning CQ Mile 1.6 $ $
308.02
Roadway Aggregate
Shoulder, VDOT Grade 21A pug mix, Compaction
Method (a)2 AQ Ton 130 $ $
308.10
Backfill Aggregate for
Culverts, VDOT Grade 21A pug mix, Compaction
Method (b) AQ Ton 30 $ $
404.02
Minor Hot Asphalt Concrete for Resurfacing, VDOT
Grade IM-19 with Limestone
Aggregate, Compaction
Method 2 AQ Ton 2,200 $ $
404.03
Minor Hot Asphalt Concrete for Leveling, VDOT Grade
IM-19 with Limestone
Aggregate, Compaction
Method 2 AQ Ton 30 $ $
412.01
Tack Coat, Emulsified
Asphalt, Grade SS-1 AQ Gallon 1,500 $ $
602.01A
18” Aluminized Type 2, 2-
2/3” x ½” Corr. Steel
Culvert, 0.109” Thick., Compaction Method B AQ
Linear
Foot 362 $ $
607.20 Cleaning Culverts in Place AQ Each 5 $ $
635.01 Temporary Traffic Control LSQ
Lump
Sum 1 $ $
TOTAL: Bid Item 1, Base Bid $
Bid Item 2, Add Item 1: FSR #238 - Clean existing asphalt surface, apply SS-1 tack coat, and place 2”
(compacted thickness) of VDOT grade IM-19 hot asphalt concrete over the full width of the existing asphalt surface. Work will be performed from MP 1.11 – 1.26.
Description
Method of
Measurement Unit Quantity Unit Price Total
404.02
Minor Hot Asphalt Concrete for Resurfacing, VDOT
Grade IM-19 with
Limestone Aggregate, Compaction Method 2 AQ Ton 200 $ $
412.01
Tack Coat, Emulsified
Asphalt, Grade SS-1 AQ Gallon 150 $ $
TOTAL: Bid Item 2, Add Item 1 $
Bid Item 3, Add Item 2: FSR #238 - Clean existing asphalt surface, apply SS-1 tack coat, and place 2” asphalt surface. Work will be performed from MP 1.26 – 1.46.
Description
Method of
Measurement Unit Quantity Unit Price Total
404.02
Minor Hot Asphalt Concrete for Resurfacing, VDOT
Grade IM-19 with
Limestone Aggregate, Compaction Method 2 AQ Ton 260 $ $
412.01
Tack Coat, Emulsified
Asphalt, Grade SS-1 AQ Gallon 200 $ $
TOTAL: Bid Item 3, Add Item 2 $
Bid Item 4, Add Item 3: FSR #238A - Clean existing asphalt surface, apply SS-1 tack coat, and place 2” asphalt surface. Work will be performed from MP 0.00 – 0.15.
Description
Method of
Measurement Unit Quantity Unit Price Total
404.02
Minor Hot Asphalt Concrete for Resurfacing, VDOT
Grade IM-19 with
Limestone Aggregate, Compaction Method 2 AQ Ton 200 $ $
412.01
Tack Coat, Emulsified
Asphalt, Grade SS-1 AQ Gallon 150 $ $
TOTAL: Bid Item 4, Add Item 3 $
METHODS OF MEASUREMENT (See FP-03 Subsection 109.05)
AQ: APPROXIMATE QUANTITY
CQ: CONTRACT QUANTITY
LSQ: LUMP SUM QUANTITY
Note to Contractors:
Faxed bids or changes to bids will not be accepted. Emailed bids or changes to bids will not be accepted. Hardcopy bids must be delivered to the address shown on the front of the Invitation for Bid in block 7 by the bid opening date and time stated in Block 13A.
Submittal requests may not be made until after award. Bid project as specified.
Recommended format for bid bonds is the SF-24. Original bid bond must be submitted with the bid. Failure to submit an original bid bond may result in your bid being found non-responsive.
Complete, by checking correct box, the certification statements required in Section K, and submit with the bid.
Davis-Bacon wage rates applicable to this project are attached. Successful contractor is required to pay these rates at a minimum for the category of worker that will be used on this job. Contractor is required to submit weekly payrolls to project COR, and to keep payrolls filed for three years subject to DOL review.
Registration in SAM is not required for submission of a bid; however registration must be completed within 5 days of notification of award. (See FAR 52.204-7(d)). Access SAM at www.sam.gov/; registration is free.
Following contract award and during contract performance, the government reserves the right to make changes by contract modification to include additional work at the awarded unit prices (by mutual agreement with the contractor), for excavation, paving and other associated site work (including culvert replacement), upon adjacent road or parking surfaces, without further advertisement or competition. Additional work will be performed to the same technical requirements of the original contract.
A complete bid package includes the Submittal Copy in its entirety:
Completed SF-1442 (Fill in Blocks 14-20)
Completed Schedule of Items (Section B)
Completed Representations and Certifications (Section K)
Original bid bond
OF-17 Bid Sticker should be clearly affixed to your sealed bid envelope http://www.sam.gov/