About this file

Little River Arch Statement of Work

View the file

Other files

File Type Posted
SuppSpecs_LittleRiver.docx DOCX document
SpecList_-_Hite_Hollow.doc DOC document
Plans_and_Specs.pdf PDF
Contractor_Performance_Survey_.doc DOC document
Statement_of_Work_-_Hite_Hollow.docx DOCX document
SummSpecs Drwgs_-_Hite_Hollow_Arch.docx DOCX document
VA11_dvb.pdf PDF
MASTER_AG-3395-S-12-0035_NORTHERN_ZONE_MATOC.pdf PDF
Hite_Hollow_Culv_Arch_-_Plans_2013-06-19.pdf PDF
VA20_dvb.pdf PDF
LITTLE_RIVER_PLNS.pdf PDF
Contractor's_Experience_questionnaire 1 .pdf PDF
SuppSpecs_-_Hite_Hollow_Arch.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Little River Arch Culvert Replacement, FS 95

Replacement of the culvert crossing of Little River on Forest Service Road # 95. Project includes clearing and grubbing, excavation, soil erosion and pollution control, minor concrete (approx. 51 C.Y.), 56’ x 23’ span x 9’-8” rise steel structural plate arch, riprap, culvert and concrete removal, crushed aggregate, and seeding and mulching.

File details come from the government source that posted it. Updated .