Dwgs_Replace_Fire_Door_Closers_4-19-17.pdf
PDF 3 MB Posted
- Attached to
- Replace Fire Doors and Repair & Replace Fire Dampers Federal contract opportunity
- Solicitation number
- AG-32SC-S-17-0055
About this file
Drawings - Rplc Fire Door Closures
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_AG-32SC-S-17-0055_Rplc_Fire_Door_Closures_and_Rpr_&_Rplc_Fire_Dampers.pdf | ||
| Wage_Decision_IA145_-_Fire_Doors_&_Dampers.pdf | ||
| Dwg_-_Attchmnt_A_-_NLAE_Existing_Damper_Locations.pdf | ||
| Specs_Replace_Fire_Door_Closers_4-19-17.pdf | ||
| SOW_Repair_and_Replace_Fire_Dampers.pdf | ||
| Specs_Repair_and_Replace_Fire_Dampers.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE ANALYSIS
GOVERNING CODES & STANDARDS
International Building Code - 2015 Edition
International Residential Code - 2015 Edition
International Energy Conservation Code - 2012 Edition
State Mechanical Code (as adopted by the Department of Public Health)
ARS Facilities Design Standards ARS-242.1
International Existing Building Code - 2015 Edition
State Plumbing Code (as adopted by the Department of Public Health)
State Electrical Code (as adopted by the Department of Public Health)
International Fire Code - 2015 Edition
U
S
D
A
ABBREVIATIONS, SYMBOLS & MATERIAL INDICATIONS
INDEX OF DRAWINGS
LOCATION MAP - IOWA STATE UNIVERSITY CAMPUS
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural Research Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
VICINITY MAP - AMES, IOWA
A-E STAMP
G-001
COVER SHEET
REPLACE FIRE DOOR CLOSURES
NATIONAL LABORATORY FOR
AGRICULTURE AND ENVIRONMENT (NLAE)
AMES, IOWA
MC
BA/MC
JD
04-19-2017
JD
AGRICULTURAL RESEARCH SERVICE
REPLACE FIRE DOOR CLOSURES
NATIONAL LABORATORY FOR
AGRICULTURE AND ENVIRONMENT (NLAE)
AMES, IOWA
CONSTRUCTION DOCUMENTS
FINAL SUBMISSION
LSY PROJECT NO. 16053
UNITED STATES
DEPARTMENT OF AGRICULTURE
PROJECT AREA
UNO UNLESS NOTE OTHERWISE
UTY UTILITY
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VEST VESTIBULE
VIF VERIFY IN FIELD
VIN VINYL
VWC VINYL WALL COVERING
W WIDE, WEST
W/ WITH
W/O WITHOUT
WB WHITEBOARD
WD WOOD
WDO WINDOW
WR WATER RESISTANT
LABORATORY ABBREVIATIONS
AL AIR LOCK
BP BACK PANEL
CORR CORROSIVES
CS CUP SINK
CYL CYLINDER
D DATA RECEPTACLE
DCRD DROP CORD
DI DEIONIZED WATER
ES EMERGENCY SHOWER
EW EYE WASH
FLAM FLAMMABLE
FPED FOOT PEDALS
GFI GROUND FAULT INTERRUPTER
HB HIGH BENCH
IVF ILLUMINATED FILM VIEWER
IVT INTRAVENEOUS TRACK
LB LOW BENCH
LN2 LIQUID NITROGEN
MHG MAGNAHELIC GAUGE
N2 GASEOUS NITROGEN
NARC NARCOTICS CABINET
O2 OXYGEN
PPE PERSONAL PROTECTION EQUIPMENT
PTL PASS THROUGH LOCKERS
PWF PURE WATER FIXTURE
RO REVERSE OSMOSIS
SG SPLASH GUARD
SHR SHOWER
UC UNDER COUNTER
VHP VAPROX HYDROGEN PEROXIDE
VPI VISUAL PRESSURE INDICATOR
MTL METAL
N NITROGEN
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NP NEW PANEL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED, CONTRACTOR INSTALLED
OFOI OWNER FURNISHED, OWNER INSTALLED
OH OPPOSITE HAND
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P POWER RECEPTACLE
PART PARTICLE BOARD
PCST PRECAST
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLYWD PLYWOOD
PNL(S) PANEL(S)
PRXR PROXIMITY READER
PT PRESSURE TREATED
PTD PAINT, PAINTED
PTN PARTITION
PWR POWER
RCP REFLECTED CEILING PLAN
REF REFERNECE
REFRIG REFRIGERATOR
REQ REQUIRED
RM ROOM
S SOUTH
SA SOUND ATTENUATION
SAB SOUND ATTENUATION BLANKET
SAL SALVAGE
SCWD SOLID CORE WOOD DOOR
SECT SECTION
SF SQUARE FOOT
SHF SHELF
SHT SHEET
SIM SIMILAR
SK SINK
SM SQUARE METER
SM SMALL
SMR SURFACE MOUNTED RACEWAY
SPEC SPECIFICATION(S)
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STDP STAND PIPE
STL STEEL
STOR STORAGE
STR STRUCTURAL, STRUCTURE
SUSP SUSPENDED
SVF SEAMLESS VINYL FLOORING
TB TACK BOARD
TD TRENCH DRAIN
TEMP TEMPORARY
THK THICK
TO TOP OF
TOC TOP OF CURB
TOS TOP OF STEEL
TYP TYPICAL
FAAP FIRE ALARM ANNUCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FAPS FIRE ALARM PULL STATION
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FHC FIRE HOSE CABINET
FL FLASHING
FLR FLOOR
FP FILLER PANEL
FRT FIRE RETARDENT TREATED
FT FOOT, FEET
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GFCI GOVERNMENT FURNISHED, CONTRACTOR
INSTALLED
GFGI GOVERNMENT FURNISHED, GOVERNMENT
INSTALLED
GH GROMMET HOLE
GL GLASS
GOV GOVERNMENT
GWB GYPSUM WALL BOARD
GYP BD GYPSUM WALL BOARD
H HIGH
HB HOSE BIB
HC HANDICAP
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR FILTER
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HT HEIGHT
ID INSIDE DIAMETER
INSL INSULATION
INST INSTALL(ATION)
INT INTERIOR
KBT KEYBOARD TRAY
L LENGTH
LB POUND
LC LOCATION COORDINATOR
LG LARGE
LP LOW POINT
LU LEG UNIT
M METER
MAG MAGNETIC
MAT MATERIAL
MAX MAXIMUM
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MED MEDIUM
MET METAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOA MULTI OUTLET ASSEMBLY
MON MONITOR
MR MOISTURE RESISTANT
MTD MOUNTED
GENERAL ABBREVIATIONS
& AND
ACT ACOUSTICAL TILE CEILING
ADDN ADDITIONAL
ADMIN ADMINISTRATION
AFF ABOVE FINISHED FLOOR
ALT ALTERNATIVE
ALUM ALUMINUM
AP ACCESS PANEL
APPROX. APPROXIMATE
ARCH ARCHITECTURAL
ARW ACID RESISTANT WASTE
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BOT BOTTOM
BRKT BRACKET
C CENTER LINE
CAB CABINET
CFCI CONTRACTOR FURNISHED, CONTRACTOR
INSTALLED
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMP COMPRESSIBLE
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUATION
CONTRA CONTRACTOR
COR CONTRACTING OFFICER'S REPRESENTATIVE
CPT CARPET
CT CERAMIC TILE
CTR CENTER
CTRTOP COUNTER TOP
DEMO DEMOLISH, DEMOLITION
DIA DIAMETER
DIM DIMENSION
DMB DRY MARKER BOARD
DN DOWN
DR DOOR
DTL DETAIL
DWG DRAWING(S)
E EAST
EA EACH
EJ EXPANSION JOINT
EL, ELEV ELEVATION
ELEC ELECTRICAL
EP ELECTRICAL PANEL
EQ EQUAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXST EXISTING
EXT EXTERIOR
SHEET
NO. SHEET NAME ISSUE DATE
SHEET #
OF 10
GENERAL
G-001 COVER SHEET 04-19-2017 01
G-002 ABBREVIATIONS & GENERAL NOTES 04-19-2017 02
ARCHITECTURAL
A-10B DEMOLITION BASEMENT FLOOR PLAN 04-19-2017 03
A-101 DEMOLITION FIRST FLOOR PLAN 04-19-2017 04
A-102 DEMOLITION SECOND FLOOR PLAN 04-19-2017 05
A-103 DEMOLITION THIRD FLOOR PLAN 04-19-2017 06
A-11B NEW WORK BASEMENT FLOOR PLAN 04-19-2017 07
A-111 NEW WORK FIRST FLOOR PLAN 04-19-2017 08
A-112 NEW WORK SECOND FLOOR PLAN 04-19-2017 09
A-113 NEW WORK THIRD FLOOR PLAN 04-19-2017 10
PROJECT AREA
ARS TASK NO. AG-32SC-D-16-0277
T GOLDEN
J HATFIELD
D MAGEE
P BORDELON
01 10
NATIONAL LABORATORY FOR
AGRICULTURE AND ENVIRONMENT (NLAE)
1015 N UNIVERSITY BLVD
AMES, IA 50011-3120
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
GENERAL NOTES:
DO NOT START CONSTRUCTION UNTIL ALL REQUIRED APPROVALS ARE OBTAINED. COORDINATE WITH IOWA STATE UNIVERSITY
REQUIREMENTS FOR WORK WITHIN CAMPUS AND ACCESS.
THE CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE PRIOR TO CONSTRUCTION TO VERIFY CONDITIONS RELATING TO
CONSTRUCTION. THOROUGHLY EXAMINE AND BE FAMILIAR WITH THE DRAWINGS, DRAWING NOTES AND SPECIFICATIONS. FIELD VERIFY ALL
DIMENSIONS PRIOR TO ORDERING MATERIALS. DO NOT SCALE THE DRAWINGS.
NOTIFY THE CONTRACTING OFFICER (CO), CONTRACTING OFFICER'S REPRESENTATIVE (COR), AND LOCATION COORDINATOR (LC) OF ANY
DISCREPANCIES, OMISSIONS, OR CONFLICTS IN THE CONSTRUCTION DOCUMENTS.
FURNISH AND INSTALL ALL ITEMS SHOWN OR IMPLIED ON THE DRAWINGS UNLESS OTHERWISE NOTED.
MAINTAIN THE CONSTRUCTION SITE IN A CLEAN AND ORDERLY MANNER.
INFORMATION CONTAINED IN THESE DRAWINGS IS BASED ON LIMITED FIELD MEASUREMENTS AND MAY REQUIRE ADJUSTMENTS OR
MODIFICATIONS TO CONFIRM WITH EXISTING CONDITIONS. IN CASES WHERE CHANGES IN DETAIL ARE NECESSARY, THESE DRAWINGS
SHALL BE USED TO SHOW DESIGN INTENT ONLY. PERFORM WORK, SHOWN OR IMPLIED, THAT IS NECESSARY TO CARRY OUT THE INTENT OF
THE DRAWINGS AND SPECIFICATIONS OR IS CUSTOMARILY PERFORMED AS IF FULLY AND CORRECTLY SET FORTH AND DESCRIBED IN THE
DRAWINGS AND SPECIFICATIONS.
COORDINATE ON-SITE WORK SCHEDULE THROUGH THE CO, COR, AND LC. SCHEDULE WORK TO MINIMIZE DISRUPTION TO OCCUPANTS OF
THE BUILDING.
PROTECT EXISTING BUILDING ELEMENTS NOT INDICATED FOR REMOVAL FROM DEMOLITION AND CONSTRUCTION ACTIVITIES. DAMAGE
RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE REPAIRED TO ORIGINAL CONDITION.
FILL OPENINGS CREATED BY THE REMOVAL OF CONDUIT. WITH MATERIAL EQUIVALENT TO THE ADJACENT
CONSTRUCTION.
SHUTDOWN OF UTILITIES FOR THE WORK SHALL BE PERFORMED ONLY BY FACILITY PERSONNEL, AND SHALL BE EXECUTED AFTER REGULAR
WORKING HOURS. REQUESTS FOR UTILITY SHUTDOWNS SHALL BE SUBMITTED TO THE CO, COR, AND LC, IN WRITING, FIVE (5) CALENDAR
DAYS PRIOR TO THE REQUIRED SHUTDOWN.
ON SITE STORAGE IS LIMITED TO THAT AVAILABLE WITHIN THE LIMITS OF CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH ALL DISCIPLINES AND ALL VENDORS.
CONTRACTOR MUST BE CERTIFIED TO CONDUCT ELECTRICAL WORK ACCORDING TO THE MOST RECENT NEC REQUIREMENTS.
DETAIL NUMBER
DRAWING NUMBER
WHERE DETAIL IS
DRAWN
SECTION NUMBER
DRAWING NUMBER
WHERE DETAIL IS
DRAWN
ELEVATION NUMBER
DRAWING NUMBER
WHERE ELEVATION IS
DRAWN
REVISION NUMBER
REVISION CLOUD
WALL TYPE NUMBER,
SEE SHT. A-601
DOOR NUMBER
ROOM NUMBERX
X
X
X
X
X
X
X X
XXX XXX
XXX1
XX WINDOW NUMBER
AFF
X' - X" CEILING HEIGHT
CLAY TILE
TERRAZZO
BRICK
CONCRETE
PRECAST
CONCRETE
PLYWOOD
HARDWOOD
WOOD BLOCKING
SHIM
METAL
GYPSUM BOARD
& PLASTER
INSULATION
BATT
RIGID
ACOUSTICAL
INSULATION
TILE
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural Research Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
RPR
SPECIFICATION NO.
DATE
J DARLING T GOLDEN
J HATFIELD
D MAGEE
P BORDELON
LOUVIERE, STRATTON & YOKEL, LLC
8484 GEORGIA AVENUE, SUITE 650
SILVER SPRING, MD 20910
(301) 588-1500
A-E STAMP
G-002
ABBREVIATIONS & GENERAL NOTES
REPLACE FIRE DOOR CLOSURES
NATIONAL LABORATORY FOR
AGRICULTURE AND ENVIRONMENT (NLAE)
AMES, IOWA
MC
BA/MC
JD
04-19-2017
SYMBOLS
MATERIALS
02 10
UP
UP
UP
UP
STAIRS
B03ST
Room
STAIR
B01ST
P&R GRIND
B04
CORRIDOR
GRIND
B05
OFFICE
B28
TELEPHONE
B31
SW GEAR
B29
B15B
STORAGE
B18
RADIO
STORAGE
B17
J.C.
B27
ELEV.
B06
MACHINE RM.
B08
VEST
B26
BM GEN
B30
FEMALE
LOCKER RM
B16
CORRIDOR
B17Z
STAIR
B02ST
OFFICE
B02MACH. RM.
B25D
SHT. MTL.
B25B
B25A
MALE
LOCKER
ROOM
B15
STORAGE
B07
REAR RM.
B11
G. CHAMB.
B14
PREP
B10
INSTRU.
B26B
TARGET
B26A
MECH. RM
B15
B15A
DRYING
ROOM
B12
P&R PREP
B01 B22
CORRIDOR
B10Z
ELEV. VEST.
B24
Room
B26B
CORRIDOR
B22Z
B25
WELD SHP.
B25C
B
B
B Z
A B A B
A B
A-10B 3
A-10B
A-10B
B19
A-10B
A B
A B
A B
GENERAL DEMOLITION NOTES:
A. DEMOLITION DRAWING SHOWS GENERAL EXTENT OF REQUIRED WORK. REMOVE FIXTURES, FITTINGS, DEVICES, ETC. REQUIRED TO PREPARE THE PROJECT SITE TO RECEIVE NEW WORK. SEE NEW WORK
DRAWINGS FOR ADDITIONAL INFORMATION.
B. PERFORM SELECTIVE DEMOLITION FOR WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS THAT
REQUIRES DEMOLITION NOT SHOWN ON DEMOLITION DRAWINGS. SUCH WORK SHALL INCLUDE, BUT IS NOT
LIMITED TO THE FOLLOWING:
1. REMOVE & REINSTALL SUSPENDED ACT CEILING AS REQUIRED TO PERFORM ELECTRICAL/FIRE ALARM
WORK.
C. PHASE DEMOLITION AND PROVIDE TEMPORARY FACILITIES AS REQUIRED TO MAINTAIN MEP AND LIFE SAFETY
SYSTEMS SERVING OCCUPIED SPACES IN FULL OPERATING CONDITION. COORDINATE PLAN FOR
MAINTENANCE OF THESE SYSTEMS WITH PROJECT OFFICER.
D. RESTORE FIRE SEPARATION CONSTRUCTION TO FULL CAPACITY AS SOON AS POSSIBLE AFTER DEMOLITION
ACTIVITIES THAT COMPROMISE THEIR INTEGRITY.
E. DISPOSE OF ALL NON-RECYCLABLE ITEMS OFF-SITE UNLESS INDICATED TO BE SALVAGED OR REUSED IN NEW
WORK.
F. STORE SALVAGED MATERIALS INTENDED FOR REUSE IN PROJECT AREA AND PROTECT SAME FROM DAMAGE.
G. MAINTAIN CLEAR ACCESS CORRIDORS TO BUILDING EXITS SERVING OCCUPIED AREAS OUTSIDE AREA OF
DEMOLITION AT ALL TIMES.
H. TURN OVER SALVAGED, NON-REUSED COMPONENTS AND ITEMS TO USDA LOCATION MONITOR. LOCATION
MONITOR WILL DETERMINE IF COMPONENTS AND ITEMS SHALL REMAIN PROPERTY OF USDA OR SHALL BE
RETURNED TO CONTRACTOR FOR DISPOSAL.
(T Y P I C A L A L L D E M O L I T I O N S H E E T S)
B
A
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural Research Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
RPR
SPECIFICATION NO.
DATE
J DARLING T GOLDEN
J HATFIELD
D MAGEE
P BORDELON
LOUVIERE, STRATTON & YOKEL, LLC
8484 GEORGIA AVENUE, SUITE 650
SILVER SPRING, MD 20910
(301) 588-1500
A-E STAMP
A-10B
DEMOLITION BASEMENT FLOOR PLAN
REPLACE FIRE DOOR CLOSURES
NATIONAL LABORATORY FOR
AGRICULTURE AND ENVIRONMENT (NLAE)
AMES, IOWA
MC
BA/MC
JD
04-19-2017
1/8" = 1'-0"A-10B
BASEMENT LEVEL DEMOLITION PLAN1
1/2" = 1'-0"A-10B
DOOR B24 DEMO2
1/2" = 1'-0"A-10B
DOOR B06 DEMO3
1/2" = 1'-0"A-10B
DOOR B15-Z DEMO4
DOOR DEMO NOTES: DEMOLITION KEY NOTES: (TYPICAL )X
01 REMOVE DOOR LEAF. SALVAGE ALL DOOR HARDWARE FOR REUSE AT SAME
LOCATION IN NEW WORK. DISCONNECT 120V POWER TO DOOR PANIC BAR.
02 REMOVE ELECTRIC HOLD OPEN TRACK CLOSER. DEMOLISH THE EXISTING
120V POWER CONNECTION BACK TO NON-ADDRESSIBLE FIRE ALARM RELAY
DEVICE.
PLAN NORTH TRUE NORTH
03 10
REMOVE DOOR LEAF AND HARDWARE. DISCONNECT 120V POWER TO DOOR
PANIC BAR.
1/2" = 1'-0"A-10B
DOOR B19 DEMO5
NOTE: NOT ALL KEYNOTES SHOWN BELOW MAY BE REFERENCED ON THIS DRAWING SHEET.
NOTE: NO DEMOLITION WORK REQUIRED FOR THIS DOOR.
UP
UP
UP
UP
STAIRS
108A
109B108B
109A
104A 105
XO101
E140
139138A 138
CO106
115119 x0100
CORRIDOR
CO108
STAIRS
103 ST
CORRIDOR
CO138
CO140
141 142
127129131
125A
E0106
145 146
134 132
130 126128 122 120 118
114116
STAIRS
ST100
CORRIDOR
CO112
CORRIDOR
CO111
CORRIDOR
C0135
CORRIDOR
CO126
CORRIDOR
CO100
CORRIDOR
CO101
130Z 120Z A
B
A
B
C
D
AB
104Z
A B
B
A145Z
B
A
A-101
A-101
A-101
A-101
A-101
A-101
A-101
AB
A
B
A B
A
B
01 02
A
B
01 02
A
B
C
D
GENERAL DEMOLITION NOTES:
A. DEMOLITION DRAWING SHOWS GENERAL EXTENT OF REQUIRED WORK. REMOVE FIXTURES, FITTINGS, DEVICES, ETC. REQUIRED TO PREPARE THE PROJECT SITE TO RECEIVE NEW WORK. SEE NEW WORK
DRAWINGS FOR ADDITIONAL INFORMATION.
B. PERFORM SELECTIVE DEMOLITION FOR WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS THAT
REQUIRES DEMOLITION NOT SHOWN ON DEMOLITION DRAWINGS. SUCH WORK SHALL INCLUDE, BUT IS NOT
LIMITED TO THE FOLLOWING:
1. REMOVE & REINSTALL SUSPENDED ACT CEILING AS REQUIRED TO PERFORM ELECTRICAL/FIRE ALARM
WORK.
C. PHASE DEMOLITION AND PROVIDE TEMPORARY FACILITIES AS REQUIRED TO MAINTAIN MEP AND LIFE SAFETY
SYSTEMS SERVING OCCUPIED SPACES IN FULL OPERATING CONDITION. COORDINATE PLAN FOR
MAINTENANCE OF THESE SYSTEMS WITH PROJECT OFFICER.
D. RESTORE FIRE SEPARATION CONSTRUCTION TO FULL CAPACITY AS SOON AS POSSIBLE AFTER DEMOLITION
ACTIVITIES THAT COMPROMISE THEIR INTEGRITY.
E. DISPOSE OF ALL NON-RECYCLABLE ITEMS OFF-SITE UNLESS INDICATED TO BE SALVAGED OR REUSED IN NEW
WORK.
F. STORE SALVAGED MATERIALS INTENDED FOR REUSE IN PROJECT AREA AND PROTECT SAME FROM DAMAGE.
G. MAINTAIN CLEAR ACCESS CORRIDORS TO BUILDING EXITS SERVING OCCUPIED AREAS OUTSIDE AREA OF
DEMOLITION AT ALL TIMES.
H. TURN OVER SALVAGED, NON-REUSED COMPONENTS AND ITEMS TO USDA LOCATION MONITOR. LOCATION
MONITOR WILL DETERMINE IF COMPONENTS AND ITEMS SHALL REMAIN PROPERTY OF USDA OR SHALL BE
RETURNED TO CONTRACTOR FOR DISPOSAL.
(T Y P I C A L A L L D E M O L I T I O N S H E E T S)
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural Research Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
RPR
SPECIFICATION NO.
DATE
J DARLING T GOLDEN
J HATFIELD
D MAGEE
P BORDELON
LOUVIERE, STRATTON & YOKEL, LLC
8484 GEORGIA AVENUE, SUITE 650
SILVER SPRING, MD 20910
(301) 588-1500
A-E STAMP
A-101
DEMOLITION FIRST FLOOR PLAN
REPLACE FIRE DOOR CLOSURES
NATIONAL LABORATORY FOR
AGRICULTURE AND ENVIRONMENT (NLAE)
AMES, IOWA
MC
BA/MC
JD
04-19-2017
1/8" = 1'-0"A-101
FIRST FLOOR DEMOLITION PLAN1
DEMOLITION KEY NOTES: (TYPICAL )X
01 REMOVE DOOR LEAF. SALVAGE ALL DOOR HARDWARE FOR REUSE AT SAME
LOCATION IN NEW WORK. DISCONNECT 120V POWER TO DOOR PANIC BAR.
02 REMOVE ELECTRIC HOLD OPEN TRACK CLOSER. DEMOLISH THE EXISTING
120V POWER CONNECTION BACK TO NON-ADDRESSIBLE FIRE ALARM RELAY
DEVICE.
DOOR DEMO NOTES:
1/2" = 1'-0"A-101
DOOR 144 DEMO3
1/2" = 1'-0"A-101
DOOR 145Z DEMO4
1/2" = 1'-0"A-101
DOOR 106 DEMO7
1/2" = 1'-0"A-101
DOOR 104Z DEMO8
1/2" = 1'-0"A-101
DOOR 120Z DEMO6
1/2" = 1'-0"A-101
DOOR 130Z DEMO5
1/2" = 1'-0"A-101
DOOR140 DEMO2
PLAN NORTH TRUE NORTH
04 10
REMOVE DOOR LEAF AND HARDWARE. DISCONNECT 120V POWER TO DOOR
PANIC BAR.
STAIRS
202ST
238A
CO202 210
208A
207 209
237A239A
231A
CO206
212A226A
STAIRS
203ST
CORRIDOR
CO200
CORRIDOR
CO238
241 CO240242
243 247 249
227229235 225 219 217
208246 212
234236 232
224 222 218220 216
STAIRS
CORRIDOR
CO 226
CORRIDOR
CORRIDOR
CO211
CORRIDOR
CO235
STAIRS
ST100
CORRIDOR
CO208
230Z 220Z A
B
A
B
A B
245Z 210Z A
B
A
B
A B
A-102
A-102
A-102
A-102
A-102
A-102
A B
A
B
A
B
01 02
A B
A
B
01 02
A
B
GENERAL DEMOLITION NOTES:
A. DEMOLITION DRAWING SHOWS GENERAL EXTENT OF REQUIRED WORK. REMOVE FIXTURES, FITTINGS, DEVICES, ETC. REQUIRED TO PREPARE THE PROJECT SITE TO RECEIVE NEW WORK. SEE NEW WORK
DRAWINGS FOR ADDITIONAL INFORMATION.
B. PERFORM SELECTIVE DEMOLITION FOR WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS THAT
REQUIRES DEMOLITION NOT SHOWN ON DEMOLITION DRAWINGS. SUCH WORK SHALL INCLUDE, BUT IS NOT
LIMITED TO THE FOLLOWING:
1. REMOVE & REINSTALL SUSPENDED ACT CEILING AS REQUIRED TO PERFORM ELECTRICAL/FIRE ALARM
WORK.
C. PHASE DEMOLITION AND PROVIDE TEMPORARY FACILITIES AS REQUIRED TO MAINTAIN MEP AND LIFE SAFETY
SYSTEMS SERVING OCCUPIED SPACES IN FULL OPERATING CONDITION. COORDINATE PLAN FOR
MAINTENANCE OF THESE SYSTEMS WITH PROJECT OFFICER.
D. RESTORE FIRE SEPARATION CONSTRUCTION TO FULL CAPACITY AS SOON AS POSSIBLE AFTER DEMOLITION
ACTIVITIES THAT COMPROMISE THEIR INTEGRITY.
E. DISPOSE OF ALL NON-RECYCLABLE ITEMS OFF-SITE UNLESS INDICATED TO BE SALVAGED OR REUSED IN NEW
WORK.
F. STORE SALVAGED MATERIALS INTENDED FOR REUSE IN PROJECT AREA AND PROTECT SAME FROM DAMAGE.
G. MAINTAIN CLEAR ACCESS CORRIDORS TO BUILDING EXITS SERVING OCCUPIED AREAS OUTSIDE AREA OF
DEMOLITION AT ALL TIMES.
H. TURN OVER SALVAGED, NON-REUSED COMPONENTS AND ITEMS TO USDA LOCATION MONITOR. LOCATION
MONITOR WILL DETERMINE IF COMPONENTS AND ITEMS SHALL REMAIN PROPERTY OF USDA OR SHALL BE
RETURNED TO CONTRACTOR FOR DISPOSAL.
(T Y P I C A L A L L D E M O L I T I O N S H E E T S)
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural Research Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
RPR
SPECIFICATION NO.
DATE
J DARLING T GOLDEN
J HATFIELD
D MAGEE
P BORDELON
LOUVIERE, STRATTON & YOKEL, LLC
8484 GEORGIA AVENUE, SUITE 650
SILVER SPRING, MD 20910
(301) 588-1500
A-E STAMP
A-102
DEMOLITION SECOND FLOOR PLAN
REPLACE FIRE DOOR CLOSURES
NATIONAL LABORATORY FOR
AGRICULTURE AND ENVIRONMENT (NLAE)
AMES, IOWA
MC
BA/MC
JD
04-19-2017
1/8" = 1'-0"A-102
SECOND FLOOR DEMOLITION PLAN1
DEMOLITION KEY NOTES: (TYPICAL )X
01 REMOVE DOOR LEAF. SALVAGE ALL DOOR HARDWARE FOR REUSE AT SAME
LOCATION IN NEW WORK. DISCONNECT 120V POWER TO DOOR PANIC BAR.
02 REMOVE ELECTRIC HOLD OPEN TRACK CLOSER. DEMOLISH THE EXISTING
120V POWER CONNECTION BACK TO NON-ADDRESSIBLE FIRE ALARM RELAY
DEVICE.
DOOR DEMO NOTES:
1/2" = 1'-0"A-102
DOOR 244 DEMO2
1/2" = 1'-0"A-102
DOOR 245Z DEMO4
1/2" = 1'-0"A-102
DOOR 210Z DEMO6
1/2" = 1'-0"A-102
DOOR 206 DEMO7
1/2" = 1'-0"A-102
DOOR 220Z DEMO5
1/2" = 1'-0"A-102
DOOR 230Z DEMO3
PLAN NORTH TRUE NORTH
05 10
REMOVE DOOR LEAF AND HARDWARE. DISCONNECT 120V POWER TO DOOR
PANIC BAR.
STAIRS
302ST
308A
Room
Room
CO306
312A326A
STAIRS
ST120
CORRIDOR
ST123
345A
301A
307 309
325A
329A
345E
345D
338A
314310
CORRIDOR
CO338
340 CO340342
345 349
329345B345C 327 321
334336 332
324 322 318320 316
CORRIDOR
CO308
CO335
CORRIDOR
CO326
CORRIDOR
312D
CORRIDOR
CO311312F
CORRIDOR
CO348
330Z 320Z A
B
A
B
310Z345Z
A B
A
B
A
B
A B
A-103
A-103
A-103
A-103
A-103
A-103
A B
A
B
A
B
01 02
A B
A
B
01 02
A
B
GENERAL DEMOLITION NOTES:
A. DEMOLITION DRAWING SHOWS GENERAL EXTENT OF REQUIRED WORK. REMOVE FIXTURES, FITTINGS, DEVICES, ETC. REQUIRED TO PREPARE THE PROJECT SITE TO RECEIVE NEW WORK. SEE NEW WORK
DRAWINGS FOR ADDITIONAL INFORMATION.
B. PERFORM SELECTIVE DEMOLITION FOR WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS THAT
REQUIRES DEMOLITION NOT SHOWN ON DEMOLITION DRAWINGS. SUCH WORK SHALL INCLUDE, BUT IS NOT
LIMITED TO THE FOLLOWING:
1. REMOVE & REINSTALL SUSPENDED ACT CEILING AS REQUIRED TO PERFORM ELECTRICAL/FIRE ALARM
WORK.
C. PHASE DEMOLITION AND PROVIDE TEMPORARY FACILITIES AS REQUIRED TO MAINTAIN MEP AND LIFE SAFETY
SYSTEMS SERVING OCCUPIED SPACES IN FULL OPERATING CONDITION. COORDINATE PLAN FOR
MAINTENANCE OF THESE SYSTEMS WITH PROJECT OFFICER.
D. RESTORE FIRE SEPARATION CONSTRUCTION TO FULL CAPACITY AS SOON AS POSSIBLE AFTER DEMOLITION
ACTIVITIES THAT COMPROMISE THEIR INTEGRITY.
E. DISPOSE OF ALL NON-RECYCLABLE ITEMS OFF-SITE UNLESS INDICATED TO BE SALVAGED OR REUSED IN NEW
WORK.
F. STORE SALVAGED MATERIALS INTENDED FOR REUSE IN PROJECT AREA AND PROTECT SAME FROM DAMAGE.
G. MAINTAIN CLEAR ACCESS CORRIDORS TO BUILDING EXITS SERVING OCCUPIED AREAS OUTSIDE AREA OF
DEMOLITION AT ALL TIMES.
H. TURN OVER SALVAGED, NON-REUSED COMPONENTS AND ITEMS TO USDA LOCATION MONITOR. LOCATION
MONITOR WILL DETERMINE IF COMPONENTS AND ITEMS SHALL REMAIN PROPERTY OF USDA OR SHALL BE
RETURNED TO CONTRACTOR FOR DISPOSAL.
(T Y P I C A L A L L D E M O L I T I O N S H E E T S)
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural Research Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
RPR
SPECIFICATION NO.
DATE
J DARLING T GOLDEN
J HATFIELD
D MAGEE
P BORDELON
LOUVIERE, STRATTON & YOKEL, LLC
8484 GEORGIA AVENUE, SUITE 650
SILVER SPRING, MD 20910
(301) 588-1500
A-E STAMP
A-103
DEMOLITION THIRD FLOOR PLAN
REPLACE FIRE DOOR CLOSURES
NATIONAL LABORATORY FOR
AGRICULTURE AND ENVIRONMENT (NLAE)
AMES, IOWA
MC
BA/MC
JD
04-19-2017
1/8" = 1'-0"A-103
THIRD FLOOR DEMOLITION PLAN1
DEMOLITION KEY NOTES: (TYPICAL )X
01 REMOVE DOOR LEAF. SALVAGE ALL DOOR HARDWARE FOR REUSE AT SAME
LOCATION IN NEW WORK. DISCONNECT 120V POWER TO DOOR PANIC BAR.
02 REMOVE ELECTRIC HOLD OPEN TRACK CLOSER. DEMOLISH THE EXISTING
120V POWER CONNECTION BACK TO NON-ADDRESSIBLE FIRE ALARM RELAY
DEVICE.
DOOR DEMO NOTES:
1/2" = 1'-0"A-103
DOOR 344 DEMO2
1/2" = 1'-0"A-103
DOOR 345Z DEMO4
1/2" = 1'-0"A-103
DOOR 310Z DEMO6
1/2" = 1'-0"A-103
DOOR 306 DEMO7
1/2" = 1'-0"A-103
DOOR 320Z DEMO5
1/2" = 1'-0"A-103
DOOR 330Z DEMO3
PLAN NORTH TRUE NORTH
06 10
REMOVE DOOR LEAF AND HARDWARE. DISCONNECT 120V POWER TO DOOR
PANIC BAR.
UP
UP
UP
STAIRS
B03ST
Room
STAIR
B01ST
P&R GRIND
B04
CORRIDOR
GRIND
B05
OFFICE
B28
TELEPHONE
B31
SW GEAR
B29
B15B
STORAGE
B18
RADIO
STORAGE
B17
J.C.
B27
ELEV.
B06
MACHINE RM.
B08
VEST
B26
BM GEN
B30
FEMALE
LOCKER RM
B16
CORRIDOR
B17Z
STAIR
B02ST
OFFICE
B02MACH. RM.
B25D
SHT. MTL.
B25B
B25A
MALE
LOCKER
ROOM
B15
STORAGE
B07
REAR RM.
B11
G. CHAMB.
B14
PREP
B10
INSTRU.
B26B
TARGET
B26A
MECH. RM
B15
B15A
DRYING
ROOM
B12
P&R PREP
B01 B22
CORRIDOR
B10Z
ELEV. VEST.
B24
Room
B26B
CORRIDOR
B22Z
B25
WELD SHP.
B25C
B
B
B Z
A B A B
A B
A-11B
A-11B
A-11B
B19
A-11B
A B
A B
A B
A S
S C
H E
D U
L E
D
AS SCHEDULED AS SCHEDULED
A S
S C
H E
D U
L E
D
0' - 4"
0' - 8"
GLAZING PER SPEC 08 81 00.
COMPLY WITH FIRE RESISTANCE
RATING REQUIREMENTS NOTED IN
SPEC, AND PER NFPA 80 AND IBC.
B
A
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural Research Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
RPR
SPECIFICATION NO.
DATE
J DARLING T GOLDEN
J HATFIELD
D MAGEE
P BORDELON
LOUVIERE, STRATTON & YOKEL, LLC
8484 GEORGIA AVENUE, SUITE 650
SILVER SPRING, MD 20910
(301) 588-1500
A-E STAMP
A-11B
NEW WORK BASEMENT FLOOR PLAN
REPLACE FIRE DOOR CLOSURES
NATIONAL LABORATORY FOR
AGRICULTURE AND ENVIRONMENT (NLAE)
AMES, IOWA
MKC
BA/MC
JD
04-19-2017
KEY NOTES: (TYPICAL )X
X DESIGNATE NEW WORK ACTIVITY BY ROOM
1/8" = 1'-0"A-11B
BASEMENT LEVEL NEW WORK PLAN1
1/2" = 1'-0"A-11B
DOOR B242
1/2" = 1'-0"A-11B
DOOR B063
1/2" = 1'-0"A-11B
DOOR B15Z4
DOOR NEW WORK NOTES:
01 NEW WHITE OAK WOOD DOOR LEAF WITH FACTORY-INSTALLED HOLLOW METAL LITE KIT AND GLAZING.
02 REINSTALL HINGES AND SURFACE VERTICAL ROD PANIC BAR WITH OUTSIDE LEVER SALVAGED DURING DEMOLITION. RECONNECT
EXISTING 120V POWER TO REINSTALLED PANIC BAR.
03 NEW BRUSH ASTRAGALS (PEMKO 18041CNB/2, HAGER 8725 CLR X 2) AND SMOKE SEALS (PEMKO S88) ON BOTH DOOR LEAVES.
04 NEW MAGNETIC HOLD OPENS ON WALL NEAR TOP OF DOOR WITH MATCHED METAL PLATE ASSEMBLY ON DOOR FACE. EXTEND
120V BRANCH CIRCUT FROM NON-ADDRESSIBLE FIRE ALARM RELAY DEVICE TO NEW MAGNETIC HOLD OPEN. (LCN SEM 70, SARGENT 1560, DORMA EM 500A)
05 NEW STANDARD HEAVY DUTY CLOSERS. (LCN 4040XP RW/PA, NORTON 7700, DORMA TS83)
06 NEW HOLLOW METAL DOOR LEAF.
07 NEW WHITE OAK WOOD DOOR LEAF.
08 NEW HEAVY DUTY SLIDE CLOSER/HOLD-OPEN MOUNTED TO DOOR. EXTEND 120V BRANCH CIRCUT FROM NON-ADDRESSIBLE FIRE
ALARM RELAY DEVICE TO NEW MAGNETIC HOLD OPEN. (LCN 4040SE, NORTON 7215MPDO, DORMA TS9356TH)
09 REINSTALL HINGES AND MORTISE PANIC BAR WITH OUTSIDE LEVER SALVAGED DURING DEMOLITION. RECONNECT EXISTING 120V
POWER TO REINSTALLED PANIC BAR.
10 NEW HOLLOW METAL DOOR LEAF WITH FACTORY-INSTALLED HOLLOW METAL LITE KIT AND GLAZING.
11 NEW HINGES AND SURFACE VERTICAL ROD PANIC BAR WITH OUTSIDE LEVER (VON DUPRIN E9927-L-F). RECONNECT EXISTING 120V
POWER TO NEW PANIC BAR.
12 NEW HINGES AND MORTISE PANIC BAR WITH OUTSIDE LEVER (VON DUPRIN E9975-L-F). RECONNECT EXISTING 120V POWER TO
NEW PANIC BAR.
13 PREPARE DOOR LEAF WITH OPEN BACK STRIKE (VON DUPRIN 576A).
14 NEW BOTTOM ROD COVERS FOR ROD PROTECTION (RGO PART NUMBER 050066-32).
DOOR SCHEDULE B
MARK
DOOR DIMENSIONS DOOR DESCRIPTION FIRE
RATING NOTESWIDTH HGT. THK. MATERIAL FIN ELEV
B FP
B06 6' - 0" 7' - 2" 0' - 1 3/4" HM PAINT B 20 MIN
B15Z 5' - 8" 7' - 2" 0' - 1 3/4" HM PAINT B 20 MIN
B19 5' - 8" 7' - 2" 0' - 1 3/4" EXST HM PAINT EXST EXST PAINT DOOR AND FRAME ONLY
B24 8' - 0" 7' - 2" 0' - 1 3/4" HM PAINT B 90 MIN
DOOR ELEVATIONS:
DOOR A DOOR B
PLAN NORTH TRUE NORTH
07 10
NOTE: NOT ALL KEYNOTES SHOWN BELOW WILL BE REFERENCED ON THIS DRAWING SHEET.
NOTE FOR ALL DOORS: FILL AND PATCH ALL EXISTING FRAME PREPS THAT ARE NOT REUSED.
NOTE FOR ALL DOORS: PAINT ALL DOOR FRAMES AND METAL DOORS WITH PAINT TO MATCH EXISTING COLOR AND FINISH.
NOTE: ONLY PAINT WORK REQUIRED FOR THIS DOOR.
1/2" = 1'-0"A-11B
DOOR B19 DEMO5
UP
UP
UP
UP
STAIRS
108A
109B108B
109A
104A 105
XO101
E140
139138A 138
CO106
115119 x0100
CORRIDOR
CO108
STAIRS
103 ST
CORRIDOR
CO138
CO140
141 142
127129131
125A
E0106
145 146
134 132
130 126128 122 120 118
114116
STAIRS
ST100
CORRIDOR
CO112
CORRIDOR
CO111
CORRIDOR
C0135
CORRIDOR
CO126
CORRIDOR
CO100
CORRIDOR
CO101
130Z 120Z A
B
A
B
C
D
A B
104Z
A B
B
A145Z
B
A
A-111
A-111
A-111
A-111
A-111
A-111
A-111
A
B
05040103
A B
A
B
050403
A
B
05 04 03
A
B
030405 01
A B
C
D
06 021314
AS SCHEDULED
A S
S C
H E
D U
L E
D
0' - 4"
0' - 8"
GLAZING PER SPEC 08 81 00.
COMPLY WITH FIRE RESISTANCE
RATING REQUIREMENTS NOTED IN
SPEC, AND PER NFPA 80 AND IBC.
A S
S C
H E
D U
L E
D
AS SCHEDULED
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural Research Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
RPR
SPECIFICATION NO.
DATE
J DARLING T GOLDEN
J HATFIELD
D MAGEE
P BORDELON
LOUVIERE, STRATTON & YOKEL, LLC
8484 GEORGIA AVENUE, SUITE 650
SILVER SPRING, MD 20910
(301) 588-1500
A-E STAMP
A-111
NEW WORK FIRST FLOOR PLAN
REPLACE FIRE DOOR CLOSURES
NATIONAL LABORATORY FOR
AGRICULTURE AND ENVIRONMENT (NLAE)
AMES, IOWA
MC
BA/MC
JD
04-19-2017
1/8" = 1'-0"A-111
FIRST FLOOR NEW WORK PLAN1
DOOR NEW WORK NOTES:
1/2" = 1'-0"A-111
DOOR 104Z8
1/2" = 1'-0"A-111
DOOR 1067
1/2" = 1'-0"A-111
DOOR 120Z6
1/2" = 1'-0"A-111
DOOR 130Z5
1/2" = 1'-0"A-111
DOOR 145Z4
1/2" = 1'-0"A-111
DOOR 1443
1/2" = 1'-0"A-111
DOOR 1402
KEY NOTES: (TYPICAL )X
X DESIGNATE NEW WORK ACTIVITY BY ROOM
01 NEW WHITE OAK WOOD DOOR LEAF WITH FACTORY-INSTALLED HOLLOW METAL LITE KIT AND GLAZING.
02 REINSTALL HINGES AND SURFACE VERTICAL ROD PANIC BAR WITH OUTSIDE LEVER SALVAGED DURING DEMOLITION. RECONNECT
EXISTING 120V POWER TO REINSTALLED PANIC BAR.
03 NEW BRUSH ASTRAGALS (PEMKO 18041CNB/2, HAGER 8725 CLR X 2) AND SMOKE SEALS (PEMKO S88) ON BOTH DOOR LEAVES.
04 NEW MAGNETIC HOLD OPENS ON WALL NEAR TOP OF DOOR WITH MATCHED METAL PLATE ASSEMBLY ON DOOR FACE. EXTEND
120V BRANCH CIRCUT FROM NON-ADDRESSIBLE FIRE ALARM RELAY DEVICE TO NEW MAGNETIC HOLD OPEN. (LCN SEM 70, SARGENT 1560, DORMA EM 500A)
05 NEW STANDARD HEAVY DUTY CLOSERS. (LCN 4040XP RW/PA, NORTON 7700, DORMA TS83)
06 NEW HOLLOW METAL DOOR LEAF.
07 NEW WHITE OAK WOOD DOOR LEAF.
08 NEW HEAVY DUTY SLIDE CLOSER/HOLD-OPEN MOUNTED TO DOOR. EXTEND 120V BRANCH CIRCUT FROM NON-ADDRESSIBLE FIRE
ALARM RELAY DEVICE TO NEW MAGNETIC HOLD OPEN. (LCN 4040SE, NORTON 7215MPDO, DORMA TS9356TH)
09 REINSTALL HINGES AND MORTISE PANIC BAR WITH OUTSIDE LEVER SALVAGED DURING DEMOLITION. RECONNECT EXISTING 120V
POWER TO REINSTALLED PANIC BAR.
10 NEW HOLLOW METAL DOOR LEAF WITH FACTORY-INSTALLED HOLLOW METAL LITE KIT AND GLAZING.
11 NEW HINGES AND SURFACE VERTICAL ROD PANIC BAR WITH OUTSIDE LEVER (VON DUPRIN E9927-L-F). RECONNECT EXISTING 120V
POWER TO NEW PANIC BAR.
12 NEW HINGES AND MORTISE PANIC BAR WITH OUTSIDE LEVER (VON DUPRIN E9975-L-F). RECONNECT EXISTING 120V POWER TO
NEW PANIC BAR.
13 PREPARE DOOR LEAF WITH OPEN BACK STRIKE (VON DUPRIN 576A).
14 NEW BOTTOM ROD COVERS FOR ROD PROTECTION (RGO PART NUMBER 050066-32).
DOOR SCHEDULE 01
MARK
DOOR DIMENSIONS DOOR DESCRIPTION FIRE
RATING NOTESWIDTH HGT. THK. MATERIAL FIN ELEV
01 FP
104Z 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN B 90 MIN
106 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN A 90 MIN
120Z 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN B 90 MIN
130Z 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN B 90 MIN
140 6' - 0" 7' - 2" 0' - 1 3/4" HM PAINT A 90 MIN
144 6' - 0" 7' - 2" 0' - 1 3/4" WD STAIN A 90 MIN
145Z 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN B 90 MIN
DOOR ELEVATIONS:
DOOR A DOOR B
PLAN NORTH TRUE NORTH
08 10
NOTE: NOT ALL KEYNOTES SHOWN BELOW WILL BE REFERENCED ON THIS DRAWING SHEET.
NOTE FOR ALL DOORS: FILL AND PATCH ALL EXISTING FRAME PREPS THAT ARE NOT REUSED.
NOTE FOR ALL DOORS: PAINT ALL DOOR FRAMES AND METAL DOORS WITH PAINT TO MATCH EXISTING COLOR AND FINISH.
STAIRS
202ST
238A
CO202 210
208A
207 209
237A239A
231A
CO206
212A226A
STAIRS
203ST
CORRIDOR
CO200
CORRIDOR
CO238
241 CO240242
243 247 249
227229235 225 219 217
208246 212
234236 232
224 222 218220 216
STAIRS
CORRIDOR
CO 226
CORRIDOR
CORRIDOR
CO211
CORRIDOR
CO235
STAIRS
ST100
CORRIDOR
CO208
230Z 220Z A
B
A
B
A B
245Z 210Z A
B
A
B
A B
A-112
A-112
A-112
A-112
A-112
A-112
A B
A
B
030405 01
A
B
05 04 03
A
B
03 04 0501
A
B
050403
A B
AS SCHEDULED
A S
S C
H E
D U
L E
D
0' - 4"
0' - 8"
GLAZING PER SPEC 08 81 00.
COMPLY WITH FIRE RESISTANCE
RATING REQUIREMENTS NOTED IN
SPEC, AND PER NFPA 80 AND IBC.
A S
S C
H E
D U
L E
D
AS SCHEDULED
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural Research Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
RPR
SPECIFICATION NO.
DATE
J DARLING T GOLDEN
J HATFIELD
D MAGEE
P BORDELON
LOUVIERE, STRATTON & YOKEL, LLC
8484 GEORGIA AVENUE, SUITE 650
SILVER SPRING, MD 20910
(301) 588-1500
A-E STAMP
A-112
NEW WORK SECOND FLOOR PLAN
REPLACE FIRE DOOR CLOSURES
NATIONAL LABORATORY FOR
AGRICULTURE AND ENVIRONMENT (NLAE)
AMES, IOWA
MC
BA/MC
JD
04-19-2017
1/8" = 1'-0"A-112
SECOND FLOOR NEW WORK PLAN1
KEY NOTES: (TYPICAL )X
X DESIGNATE NEW WORK ACTIVITY BY ROOM
01 NEW WHITE OAK WOOD DOOR LEAF WITH FACTORY-INSTALLED HOLLOW METAL LITE KIT AND GLAZING.
02 REINSTALL HINGES AND SURFACE VERTICAL ROD PANIC BAR WITH OUTSIDE LEVER SALVAGED DURING DEMOLITION. RECONNECT
EXISTING 120V POWER TO REINSTALLED PANIC BAR.
03 NEW BRUSH ASTRAGALS (PEMKO 18041CNB/2, HAGER 8725 CLR X 2) AND SMOKE SEALS (PEMKO S88) ON BOTH DOOR LEAVES.
04 NEW MAGNETIC HOLD OPENS ON WALL NEAR TOP OF DOOR WITH MATCHED METAL PLATE ASSEMBLY ON DOOR FACE. EXTEND
120V BRANCH CIRCUT FROM NON-ADDRESSIBLE FIRE ALARM RELAY DEVICE TO NEW MAGNETIC HOLD OPEN. (LCN SEM 70, SARGENT 1560, DORMA EM 500A)
05 NEW STANDARD HEAVY DUTY CLOSERS. (LCN 4040XP RW/PA, NORTON 7700, DORMA TS83)
06 NEW HOLLOW METAL DOOR LEAF.
07 NEW WHITE OAK WOOD DOOR LEAF.
08 NEW HEAVY DUTY SLIDE CLOSER/HOLD-OPEN MOUNTED TO DOOR. EXTEND 120V BRANCH CIRCUT FROM NON-ADDRESSIBLE FIRE
ALARM RELAY DEVICE TO NEW MAGNETIC HOLD OPEN. (LCN 4040SE, NORTON 7215MPDO, DORMA TS9356TH)
09 REINSTALL HINGES AND MORTISE PANIC BAR WITH OUTSIDE LEVER SALVAGED DURING DEMOLITION. RECONNECT EXISTING 120V
POWER TO REINSTALLED PANIC BAR.
10 NEW HOLLOW METAL DOOR LEAF WITH FACTORY-INSTALLED HOLLOW METAL LITE KIT AND GLAZING.
11 NEW HINGES AND SURFACE VERTICAL ROD PANIC BAR WITH OUTSIDE LEVER (VON DUPRIN E9927-L-F). RECONNECT EXISTING 120V
POWER TO NEW PANIC BAR.
12 NEW HINGES AND MORTISE PANIC BAR WITH OUTSIDE LEVER (VON DUPRIN E9975-L-F). RECONNECT EXISTING 120V POWER TO
NEW PANIC BAR.
13 PREPARE DOOR LEAF WITH OPEN BACK STRIKE (VON DUPRIN 576A).
14 NEW BOTTOM ROD COVERS FOR ROD PROTECTION (RGO PART NUMBER 050066-32).
DOOR NEW WORK NOTES:
1/2" = 1'-0"A-112
DOOR 2442
1/2" = 1'-0"A-112
DOOR 230Z3
1/2" = 1'-0"A-112
DOOR 245Z4
1/2" = 1'-0"A-112
DOOR 220Z5
1/2" = 1'-0"A-112
DOOR 210Z6
1/2" = 1'-0"A-112
DOOR 2067
DOOR SCHEDULE 02
MARK
DOOR DIMENSIONS DOOR DESCRIPTION FIRE
RATING NOTESWIDTH HGT. THK. MATERIAL FIN ELEV
02 FP
206 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN A 20 MIN
210Z 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN B 90 MIN
220Z 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN B 90 MIN
230Z 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN B 90 MIN
244 6' - 0" 7' - 2" 0' - 1 3/4" WD STAIN A 20 MIN
245Z 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN B 90 MIN
DOOR ELEVATIONS:
DOOR A DOOR B
PLAN NORTH TRUE NORTH
09 10
NOTE: NOT ALL KEYNOTES SHOWN BELOW WILL BE REFERENCED ON THIS DRAWING SHEET.
NOTE FOR ALL DOORS: PAINT ALL DOOR FRAMES AND METAL DOORS WITH PAINT TO MATCH EXISTING COLOR AND FINISH.
STAIRS
302ST
308A
Room
Room
CO306
312A326A
STAIRS
ST120
CORRIDOR
ST123
345A
301A
307 309
325A
329A
345E
345D
338A
314310
CORRIDOR
CO338
340 CO340342
345 349
329345B345C 327 321
334336 332
324 322 318320 316
CORRIDOR
CO308
CO335
CORRIDOR
CO326
CORRIDOR
312D
CORRIDOR
CO311312F
CORRIDOR
CO348
330Z 320Z A
B
A
B
310Z345Z
A B
A
B
A
B
A B
A-113
A-113
A-113
A-113
A-113
A-113
A B
A
B
030405 01
A
B
05 04 03
A
B
03 04 0501
A
B
03 04 0501
A B
A S
S C
H E
D U
L E
D
AS SCHEDULED AS SCHEDULED
A S
S C
H E
D U
L E
D
0' - 4"
0' - 8"
GLAZING PER SPEC 08 81 00.
COMPLY WITH FIRE RESISTANCE
RATING REQUIREMENTS NOTED IN
SPEC, AND PER NFPA 80 AND IBC.
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural Research Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
RPR
SPECIFICATION NO.
DATE
J DARLING T GOLDEN
J HATFIELD
D MAGEE
P BORDELON
LOUVIERE, STRATTON & YOKEL, LLC
8484 GEORGIA AVENUE, SUITE 650
SILVER SPRING, MD 20910
(301) 588-1500
A-E STAMP
A-113
NEW WORK THIRD FLOOR PLAN
REPLACE FIRE DOOR CLOSURES
NATIONAL LABORATORY FOR
AGRICULTURE AND ENVIRONMENT (NLAE)
AMES, IOWA
MC
BA/MC
JD
04-19-2017
1/8" = 1'-0"A-113
THIRD FLOOR NEW WORK PLAN1 KEY NOTES: (TYPICAL )X
X DESIGNATE NEW WORK ACTIVITY BY ROOM
01 NEW WHITE OAK WOOD DOOR LEAF WITH FACTORY-INSTALLED HOLLOW METAL LITE KIT AND GLAZING.
02 REINSTALL HINGES AND SURFACE VERTICAL ROD PANIC BAR WITH OUTSIDE LEVER SALVAGED DURING DEMOLITION. RECONNECT
EXISTING 120V POWER TO REINSTALLED PANIC BAR.
03 NEW BRUSH ASTRAGALS (PEMKO 18041CNB/2, HAGER 8725 CLR X 2) AND SMOKE SEALS (PEMKO S88) ON BOTH DOOR LEAVES.
04 NEW MAGNETIC HOLD OPENS ON WALL NEAR TOP OF DOOR WITH MATCHED METAL PLATE ASSEMBLY ON DOOR FACE. EXTEND
120V BRANCH CIRCUT FROM NON-ADDRESSIBLE FIRE ALARM RELAY DEVICE TO NEW MAGNETIC HOLD OPEN. (LCN SEM 70, SARGENT 1560, DORMA EM 500A)
05 NEW STANDARD HEAVY DUTY CLOSERS. (LCN 4040XP RW/PA, NORTON 7700, DORMA TS83)
06 NEW HOLLOW METAL DOOR LEAF.
07 NEW WHITE OAK WOOD DOOR LEAF.
08 NEW HEAVY DUTY SLIDE CLOSER/HOLD-OPEN MOUNTED TO DOOR. EXTEND 120V BRANCH CIRCUT FROM NON-ADDRESSIBLE FIRE
ALARM RELAY DEVICE TO NEW MAGNETIC HOLD OPEN. (LCN 4040SE, NORTON 7215MPDO, DORMA TS9356TH)
09 REINSTALL HINGES AND MORTISE PANIC BAR WITH OUTSIDE LEVER SALVAGED DURING DEMOLITION. RECONNECT EXISTING 120V
POWER TO REINSTALLED PANIC BAR.
10 NEW HOLLOW METAL DOOR LEAF WITH FACTORY-INSTALLED HOLLOW METAL LITE KIT AND GLAZING.
11 NEW HINGES AND SURFACE VERTICAL ROD PANIC BAR WITH OUTSIDE LEVER (VON DUPRIN E9927-L-F). RECONNECT EXISTING 120V
POWER TO NEW PANIC BAR.
12 NEW HINGES AND MORTISE PANIC BAR WITH OUTSIDE LEVER (VON DUPRIN E9975-L-F). RECONNECT EXISTING 120V POWER TO
NEW PANIC BAR.
13 PREPARE DOOR LEAF WITH OPEN BACK STRIKE (VON DUPRIN 576A).
14 NEW BOTTOM ROD COVERS FOR ROD PROTECTION (RGO PART NUMBER 050066-32).
DOOR NEW WORK NOTES:
1/2" = 1'-0"A-113
DOOR 3442
1/2" = 1'-0"A-113
DOOR 330Z3
1/2" = 1'-0"A-113
DOOR 345Z4
1/2" = 1'-0"A-113
DOOR 320Z5
1/2" = 1'-0"A-113
DOOR 310Z6
1/2" = 1'-0"A-113
DOOR 3067
DOOR SCHEDULE 03
MARK
DOOR DIMENSIONS DOOR DESCRIPTION FIRE
RATING NOTESWIDTH HGT. THK. MATERIAL FIN ELEV
03 FP
306 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN A 20 MIN
310Z 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN B 90 MIN
320Z 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN B 90 MIN
330Z 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN B 90 MIN
344 6' - 0" 7' - 2" 0' - 1 3/4" WD STAIN A 20 MIN
345Z 5' - 8" 7' - 2" 0' - 1 3/4" WD STAIN B 90 MIN
DOOR ELEVATIONS:
DOOR A DOOR B
PLAN NORTH TRUE NORTH
10 10
NOTE: NOT ALL KEYNOTES SHOWN BELOW WILL BE REFERENCED ON THIS DRAWING SHEET.
NOTE FOR ALL DOORS: PAINT ALL DOOR FRAMES AND METAL DOORS WITH PAINT TO MATCH EXISTING COLOR AND FINISH.
| G-001 - COVER SHEET |
| Sheets |
| A-10B - DEMOLITION BASEMENT FLOOR PLAN |
| A-11B - NEW WORK BASEMENT FLOOR PLAN |
| A-101 - DEMOLITION FIRST FLOOR PLAN |
| A-102 - DEMOLITION SECOND FLOOR PLAN |
| A-103 - DEMOLITION THIRD FLOOR PLAN |
| A-111 - NEW WORK FIRST FLOOR PLAN |
| A-112 - NEW WORK SECOND FLOOR PLAN |
| A-113 - NEW WORK THIRD FLOOR PLAN |
| G-001 - COVER SHEET |
| G-002 - ABBREVIATIONS & GENERAL NOTES |
| G-002 - ABBREVIATIONS & GENERAL NOTES |
| Sheets |
| A-10B - DEMOLITION BASEMENT FLOOR PLAN |
| A-11B - NEW WORK BASEMENT FLOOR PLAN |
| A-101 - DEMOLITION FIRST FLOOR PLAN |
| A-102 - DEMOLITION SECOND FLOOR PLAN |
| A-103 - DEMOLITION THIRD FLOOR PLAN |
| A-111 - NEW WORK FIRST FLOOR PLAN |
| A-112 - NEW WORK SECOND FLOOR PLAN |
| A-113 - NEW WORK THIRD FLOOR PLAN |
| G-001 - COVER SHEET |
| G-002 - ABBREVIATIONS & GENERAL NOTES |
| A-10B - DEMOLITION BASEMENT FLOOR PLAN |
| Sheets |
| A-10B - DEMOLITION BASEMENT FLOOR PLAN |
| A-11B - NEW WORK BASEMENT FLOOR PLAN |
| A-101 - DEMOLITION FIRST FLOOR PLAN |
| A-102 - DEMOLITION SECOND FLOOR PLAN |
| A-103 - DEMOLITION THIRD FLOOR PLAN |
| A-111 - NEW WORK FIRST FLOOR PLAN |
| A-112 - NEW WORK SECOND FLOOR PLAN |
| A-113 - NEW WORK THIRD FLOOR PLAN |
| A-101 - DEMOLITION FIRST FLOOR PLAN |
| Sheets |
| A-10B - DEMOLITION BASEMENT FLOOR PLAN |
| A-11B - NEW WORK BASEMENT FLOOR PLAN |
| A-101 - DEMOLITION FIRST FLOOR PLAN |
| A-102 - DEMOLITION SECOND FLOOR PLAN |
| A-103 - DEMOLITION THIRD FLOOR PLAN |
| A-111 - NEW WORK FIRST FLOOR PLAN |
| A-112 - NEW WORK SECOND FLOOR PLAN |
| A-113 - NEW WORK THIRD FLOOR PLAN |
| A-102 - DEMOLITION SECOND FLOOR PLAN |
| Sheets |
| A-10B - DEMOLITION BASEMENT FLOOR PLAN |
| A-11B - NEW WORK BASEMENT FLOOR PLAN |
| A-101 - DEMOLITION FIRST FLOOR PLAN |
| A-102 - DEMOLITION SECOND FLOOR PLAN |
| A-103 - DEMOLITION THIRD FLOOR PLAN |
| A-111 - NEW WORK FIRST FLOOR PLAN |
| A-112 - NEW WORK SECOND FLOOR PLAN |
| A-113 - NEW WORK THIRD FLOOR PLAN |
| A-103 - DEMOLITION THIRD FLOOR PLAN |
| Sheets |
| A-10B - DEMOLITION BASEMENT FLOOR PLAN |
| A-11B - NEW WORK BASEMENT FLOOR PLAN |
| A-101 - DEMOLITION FIRST FLOOR PLAN |
| A-102 - DEMOLITION SECOND FLOOR PLAN |
| A-103 - DEMOLITION THIRD FLOOR PLAN |
| A-111 - NEW WORK FIRST FLOOR PLAN |
| A-112 - NEW WORK SECOND FLOOR PLAN |
| A-113 - NEW WORK THIRD FLOOR PLAN |
| A-11B - NEW WORK BASEMENT FLOOR PLAN |
| Sheets |
| A-10B - DEMOLITION BASEMENT FLOOR PLAN |
| A-11B - NEW WORK BASEMENT FLOOR PLAN |
| A-101 - DEMOLITION FIRST FLOOR PLAN |
| A-102 - DEMOLITION SECOND FLOOR PLAN |
| A-103 - DEMOLITION THIRD FLOOR PLAN |
| A-111 - NEW WORK FIRST FLOOR PLAN |
| A-112 - NEW WORK SECOND FLOOR PLAN |
| A-113 - NEW WORK THIRD FLOOR PLAN |
| A-111 - NEW WORK FIRST FLOOR PLAN |
| Sheets |
| A-10B - DEMOLITION BASEMENT FLOOR PLAN |
| A-11B - NEW WORK BASEMENT FLOOR PLAN |
| A-101 - DEMOLITION FIRST FLOOR PLAN |
| A-102 - DEMOLITION SECOND FLOOR PLAN |
| A-103 - DEMOLITION THIRD FLOOR PLAN |
| A-111 - NEW WORK FIRST FLOOR PLAN |
| A-112 - NEW WORK SECOND FLOOR PLAN |
| A-113 - NEW WORK THIRD FLOOR PLAN |
| A-112 - NEW WORK SECOND FLOOR PLAN |
| Sheets |
| A-10B - DEMOLITION BASEMENT FLOOR PLAN |
| A-11B - NEW WORK BASEMENT FLOOR PLAN |
| A-101 - DEMOLITION FIRST FLOOR PLAN |
| A-102 - DEMOLITION SECOND FLOOR PLAN |
| A-103 - DEMOLITION THIRD FLOOR PLAN |
| A-111 - NEW WORK FIRST FLOOR PLAN |
| A-112 - NEW WORK SECOND FLOOR PLAN |
| A-113 - NEW WORK THIRD FLOOR PLAN |
| A-113 - NEW WORK THIRD FLOOR PLAN |
| Sheets |
| A-10B - DEMOLITION BASEMENT FLOOR PLAN |
| A-11B - NEW WORK BASEMENT FLOOR PLAN |
| A-101 - DEMOLITION FIRST FLOOR PLAN |
| A-102 - DEMOLITION SECOND FLOOR PLAN |
| A-103 - DEMOLITION THIRD FLOOR PLAN |
| A-111 - NEW WORK FIRST FLOOR PLAN |
| A-112 - NEW WORK SECOND FLOOR PLAN |
| A-113 - NEW WORK THIRD FLOOR PLAN |
File details come from the government source that posted it. Updated .