1.7 Monthly Status Report Within 5 calendar days of the last
calendar day of the month
2.1 Draft Transition Plan Within 10 calendar days of the kickoff meeting
2.2 Final Transition Plan Within 10 calendar days of receipt of
USFS comments
7.2. Inspection and Acceptance
The Government will perform inspection of the deliverables and services received from the Contractor in accordance with the contract Quality Assurance Surveillance
Plan (QASP). The Government has the right to perform periodic surveillance of the
Contractor to ensure that the Contractor’s work products and QC processes are in compliance with the contract requirements. The Government and the Contractor will coordinate Government surveillance in a manner that will not unduly delay or disrupt the Contractor’s performance of the contract.
The COR will have seven (7) seven calendar days to review draft deliverables and make comments. The Contractor will have seven (7) seven calendar days to make corrections. Upon receipt of the final deliverables, the COR/designee will have seven (7) seven calendar for final review prior to acceptance or providing documented reasons for non-acceptance.
Should the Government fail to complete the review within the review period the deliverable will become acceptable by default.
The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR/designee of the specific reasons for rejection. The Contractor shall have seven (7) seven calendar to correct the rejected deliverable and return it per delivery instructions.
8. PERIOD OF PERFORMANCE
Anticipated Contractor Start Date: March 15, 2017
At the option of the Government, the contract may be renewed for one eight month period, not to exceed one option period, provided the Contracting Officer serves notice of renewal.
Base Period: March 15, 2017 – March 14, 2018 Option Period 1: March 15, 2018 – October 31,