Construction RFP

View the file

Other files for this federal contract opportunity

Other files attached to construction, newest first.
File Type Posted
MATOC_Amendment_2.pdf PDF
MATOC_Amendment_1.pdf PDF
Q A's_MATOC_RFP.docx DOCX document
AG-3142-S-16-0014_MATOC_Amendment_0001.docx DOCX document
SF_1442_SDVOSB_REV_2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-3142-S-16-0014 Page 1 of 1

J-6 CONTRACTOR’S RELEASE OF CLAIMS

SECTION B—SUPPLIESOR SERVICES……………………………………………………………….4

SECTION C--DESCRIPTION/SPECIFICATIONS24
SECTION D--PACKAGING AND MARKING42
SECTION E--INSPECTION AND ACCEPTANCE43
SECTION F--DELIVERIES OR PERFORMANCE44
SECTION G--CONTRACT ADMINISTRATION DATA45
SECTION H--SPECIAL CONTRACT REQUIREMENTS47
PART II-CONTRACT CLAUSE50
SECTION I--CONTRACT CLAUSES50
PART III--LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS103

SECTION K--REPRESENTATIONS, CERTIFICATIONS, …………………………………………104

SECTION L--INSTRUCTIONS,118
SECTION M--EVALUATION FACTORS FOR AWARD126

SECTION B – SUPPLIES OR SERVICES PRICES/COSTS

B.1 This acquisition is a set-aside for Service Disabled Veteran Owned Small Business (SDVOSB) in accordance with the public law 109-461. The period of performance for all contracts resulting from this solicitation shall be thirty six (36) months from contract award, which is estimated to be October 1, 2016 through September 30, 2019.The guaranteed minimum amount for each resultant award is $2,000 for the life of the contract. The minimum ordering limit per task order is $2,000 and the maximum ordering limit per task order is $4,000,000.

The acquisition includes two “SEED projects”; one a “hypothetical office renovation project” and another “actual design build project” will be included as part of this solicitation. Detailed information regarding the SEED projects can be found as attachments to this solicitation. A pre-proposal conference/site visit will be scheduled. All vendors who intend to submit a proposal are strongly encouraged to attend to review proper multiple award task order contracts (MATOC) procedures.

The Government makes no representation as to the number of task orders or the actual amount of work to be ordered. Contractors are not guaranteed work in excess of the minimum guarantee. Firms that design or prepare specifications for a construction contract or task order issued under the resulting contract are prohibited from providing the subsequent construction. This limitation also applies to subsidiaries or affiliates of the firm. This prohibition does not apply to those projects where the contractor’s design work is limited to that required to respond to RFP on a task order or the design is the result of a design-build effort awarded via task order under this contract.

B.2 AGAR 452.216-73 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (FEB 1988)

During the period specified in FAR clause 52.216- 19 Order Limitations, the Government shall place orders totaling a minimum of $2,000.00, but not in excess of $8,000,000.00 annually.

B.3 CONTRACT LINE ITEMS

a. Offeror shall enter unit prices for contract line items and sub-line items in the schedules that follow.

b. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid price and the total recomputed accordingly. If the Offeror provides a total amount for a contract item but fails to enter the unit price, the amount divided by the specified quantity will be held to be the intended unit price.

c. The Offeror is to propose the prices for the thirty (36) months in the attached Section B Tables for Washington DC and Beltsville MD. If the prices will remain the same for 36 months state that the prices remain the same for the 36 month period and only fill in the 12 month column.. If the offeror wishes to change prices for the beginning of the 24 and 36 month periods fill in the prices under the lableled spreadsheets accordingly in the attached tables.

Item No.
Supplies/Services
Washington DC
Beltsville MD
Unit
Amount per unit
Amount per unit

RATES

N1
Night differential rate to be added to work that must be performed after normal operating hours and or weekends. Normal operating hours are defined as 6:00 AM to 6:00 PM.
%
%
%
N2
Labor Rates by trade
a. Carpenter
hr
b. Electrician
hr
c. Laborer, Skilled
hr
d. Laborer, Common or General
hr
e. Marble/Stone Mason
hr
f. Glazier
hr
g. Painter (includes drywall finisher)
hr
g. Plasterer
hr
h. Cement Mason/Concrete Finisher
hr
i. Plumber
hr
j. Pipefitter
hr
k. Roofer
hr
l. Sprinkler Fitter
hr
m. Sheet Metal Worker
hr
n. HVAC Technician
hr
o. Elevator Mechanic
hr
p. Elevator Inspector
hr

ASBESTOS REMOVAL

A1
Remove floor tile and adhesive that contain asbestos material.
a. Up to 1000 SF
SF
b. 1001 SF to 2500 SF
SF
c. 2501 SF or more
SF
A2
Industrial Hygienist (IH)
Certified IH
hr

MASONARY

B1
Remove existing masonry partition (cinder block, hollow clay tile, brick) with or without plaster. Includes removal of any doors, windows, frames, and all electrical wiring within the partition to the nearest outlet/junction box, terminate and cap.
a. 6 inch thickness, 0 ft. to 12 ft. height
SF
b. 6 inch thickness, above 12 ft. height
SF
c. 8 inch thickness, 0 ft. to 12 ft. height
SF
d. 8 inch thickness, above 12 ft. height
SF
e. 12 inch thickness, 0 ft. to 12 ft. height
SF
f. 12 inch thickness, above 12 ft. height
SF
g. 12 inch thickness above 16 ft. height (applies only to that portion in excess of 16 ft. above floor).
SF
B2
F/I concrete block masonry partition running bond with 8 inch high x 16 inch long units including precast concrete lintels.
a. 6 inch thickness, 0 ft. to 12 ft. height
SF
b. 8 inch thickness, 0 ft. to 12 ft. height
SF
c. 8 inch thickness above 12 ft. height (applies only to that portion above 12 ft. in height)
SF
d. 8 inch thickness, 0 ft. to 12 ft. height with 2 hour fire rating
SF
e. 8 inch thickness above 12 ft. height with 2 hour fire rating (applies only to that portion above 10 ft. in height)
SF
f. 12 inch thickness, 0 ft. to 12 ft. height
SF
g. 12 inch thickness above 12 ft. (applies only to that portion above 12 ft.)
SF
h. 12 inch thickness, 0 ft. to 12 ft. height with 2 hour fire rating
SF
i. 12 inch thickness above 12 ft. with 2 hour fire rating (applies only to that portion above 12 ft. height)
SF
B3
F/I precast concrete lintels, solid
a. 4" wide x 6" high
LF
b. 6" wide x 8" high
LF
c. 8" wide x 8" high
LF
d. 8" wide x 12" high
LF
e. 12" wide x 12" high
LF
f. 12" wide x 16" high
LF
B4
F/I ready mix concrete 3000 psi, including formwork, reinforcing, finishing of concrete and site cleanup.
a. 1 to 7 CY
CY
b. 8 to 21 CY
CY
c. 22 or more CY
CY
B5
Concrete fill or topping up to 3 inches in thickness including preparation of excavation or existing slab, all necessary formwork and site cleanup.
a. 0 to 100 SF
SF
b. 101 SF to 300 SF
SF
c. 301 SF to 700 SF
SF
d. 701 SF or more
SF
B6
Masonry rotary/core drilling to support electrical installation. Rotary/Core drill clay hollow tile, brick or cinder block wall. Base price per opening. (All openings must be fire caulked)
a. Hole up to 12" deep , 2" diameter
EA
b. Hole up to 12" deep , 4" diameter
EA
c. Hole up to 12" deep , 6" diameter
EA
d. Hole up to 12" deep , 8" diameter
EA

CEILINGS

C1
Remove existing ceiling suspension system and accessories up to 12'-0" high (including sensors and ceiling accessories)
a. Suspended lay-in tile
SF
b. Suspended plaster or drywall
SF
c. Acoustic tile, stapled or cemented
SF
d. Suspended acoustic tile in concealed grid
SF
C1A
Remove existing light fixtures (to be replaced with like) all sizes and types in a ceiling suspension system up to 12-0" high
a. Suspended lay-in tile
EA
b. Suspended plaster or drywall
EA
c. Acoustic tile, stapled or cemented
EA
d. Suspended acoustic tile in concealed grid
EA
C2
Remove existing ceiling suspension system, tiles and accessories up to 12' 0" high
a. Suspended lay-in tile
SF
b. Suspended plaster or drywall
SF
c. Acoustic tile, stapled or cemented
SF
d. Suspended acoustic tile in concealed grid
SF
C3
Remove existing ceiling, suspension system and accessories over 12 ft. high
a. Suspended lay-in tile
SF
b. Suspended plaster or drywall
SF
c. Acoustic tile, stapled or cemented
SF
d. Suspended acoustic tile in concealed grid
SF
C4
F/I 2' x 4' x acoustical tile in existing lay-in grid system, including removal and disposal of existing tile where required.
a. Height - Up to 12' 0"
SF
b. Height - Over 12' 0"
SF
C5
F/I 2' x 2' x 5/8" (non-directional) acoustical tile and direct hung exposed metal grid suspension system. Exposed grid to be white as ordered.
a. Height - Up to 12' 0"
SF
b. Height - above 12" 0"
SF
C6
F/I 2' x 2' x 5/8" (non-directional) rabbeted edge acoustical tile and direct hung exposed metal grid suspension system. Exposed grid to be white as ordered.
a. Height - Up to 12' 0"
SF
b. Height - above 12' 0"
SF
C7
F/I 600mm x 600mm metric, ME2235 USG rabbeted edge acoustical ceiling tile (non-directional), and direct hung exposed metal grid suspension system. Exposed grid to be Fine line, bevel white or equivalent.
a. Height - Up to 12' 0"
SF
b. Height - Above 12' 0"
SF
C8
F/I thermal or acoustical batting above ceiling.
a. 3 1/2 inches thick
SF
b. 6 inches thick
SF
C9
F/I 2' x 4' x acoustical tile and direct hung exposed metal grid suspension system. Exposed grid to be white as ordered.
a. Height - Up to 12' 0"
SF
b. Height - Above 12' 0"
SF
C10
F/I window pockets around window above drop ceiling.
a. Metal (Aluminum Flashing)
LF
b. Plywood
LF
C11
F/I 5/8" gypsum board ceiling on suspended metal furring system. Finish joints with tape and compound.
a. Height - Up to 12' 0"
SF
b. Height - Above 12' 0"
SF
C12
In areas where partitions are removed, repair acoustical ceiling tile suspension system.
SF

DOORS AND FRAMES

D1
F/I door (3' 0" x 6' 8" to 7' 0" x 1 3/4") includes hinges and metal door frame. (Master Specifications, Division 08 71 00, Door Hardware). Door lock and closure not included in this Line item.
a. Solid core wood door fire rated
EA
b. Hollow metal door
EA
c. 'B' label fire rated frame and wood door
EA
d. 'B' label fire rated frame and metal door
EA
e. 2 panel solid wood door Oak Door Stain Grade
EA
f. 3 panel solid wood door Oak Door Stain Grade
EA
g. 6 panel solid wood door Oak Door Stain Grade
EA
h. 2 panel solid wood door Painter Grade Doors
EA
i. 3 panel solid wood door Painter Grade Doors
EA
j. 6 panel solid wood door Painter Grade Doors
EA
D2
F/I door (3' 6" x 6' 8" to 7' 0" and 1 3/4") includes hinges and metal door frame (Master Specifications, Division 08 71 00, Door Hardware). Door lock and closure not included in this Line item.
a. Solid core wood door fire rated
EA
b. Hollow metal door
EA
c. 'B' label fire rated frame and wood door
EA
d. 'B' label fire rated frame and metal door
EA
e. 'C' label fire rated frame and wood door
EA
f. 'C' label fire rated frame and metal door
EA
D3
F/I double doors (each 3' 0" x 6' 8" x 1 3/4"), including hinges, astragal and metal frame. (Master Specifications, Division 08 71 00, Door Hardware). Door lock and closure not included in this Line item.
a. Solid core wood door fire rated
EA
b. Hollow metal door
EA
c. 'B' fire rated frame and wood door
EA
d. 'B" fire rated frame and metal door
EA
e. 'C' fire rated frame and wood door
EA
f. 'C' fire rated frame and metal door
EA
D4
Install Government furnished frame and door (includes door lock, closure, and hinges) 3' 0" to 3' 6" x 6' 8" to7' 0" x 1 3/4".
a. Solid core wood door fire rated/Hollow core metal door
EA
D5
Install Government furnished door and hardware in existing frame, 3' 0" to 3' 6" x 6' 8" to 7' 0" x 1 3/4".
a. Solid core wood door fire rated
EA
D6
Prepare opening in existing partition to receive new door and frame (Contractor to prime one coat and paint one coat). Includes all framing and patching (up to 3' 0" x 6' 8" to 7' 0" x 1 3/4")
a. Drywall partition (wood and metal studs)
EA
b. Plaster partition (wood and metal studs)
EA
c. Masonry partition
EA
D7
Same as D6 but for Double Door (up to 6' 0" x 6' 8" to 7' 0" x 1 3/4")
a. Drywall partition (wood and metal studs)
EA
b. Plaster partition (wood and metal studs)
EA
c. Masonry partition
EA
D8
Furnish all labor and material to repair opening in new or existing ceiling or wall and install a steel access door including all framing and patching. See specification Section 08201.
a. 12 inch x 12 inch
EA
b. 16 inch x 20 inch
EA
c. 24 inch x 24 inch
EA
D9
Provide all labor and materials necessary to undercut or trim an existing door
a. Wood door
EA
b. Metal door
EA
D10
F/I light vision kit with wire reinforced glass.
a. 6 inch x 21 inch
EA
b. 12 inch x 12 inch
EA
c. 24 inch x 32 inch
EA
D11
F/I door louver vents
a. 12" x 18"
EA
b. 18" x 24"
EA

ELECTRICAL

E1
Remove existing lighting fixtures (all sizes and types of interior lights). Includes disconnecting and removal of wire, raceway or cable to the nearest junction outlet box. F/I cover on outlet box where wiring is removed.
a. Lighting fixtures to be disposed as directed by the COR.
EA
E2
Disconnect and remove data/power pole to include removal of power supply wiring and raceway to nearest junction, outlet box. F/I cover on outlet box where wiring is removed.
EA
E2A
Disconnect and remove power supply wiring and raceway to system furniture from nearest junction or outlet box.
EA
E3
Disconnect and remove existing thin wall conduit, rigid conduit, flexible conduit, armored or unarmored cable, surface raceway, I.e., wire mold, pancake molding, etc., include hangers, braces, straps, boxes, conductors and fittings (surface mounted or concealed in hollow walls or suspended ceilings).
a. 1/2" through 3/4" diameter
LF
b. 1" through 1-1/2" diameter
LF
c. 2" through 2-1/2" diameter
LF
d. 3" through 4" diameter
LF
E4
Disconnect and remove existing wall outlet or light switch and install blank cover plate.
EA
E5
Channel existing plaster wall, patch, paint to match existing to support the insulation of EMT conduit 1" in diameter
LF
E6
Furnish, install and secure thin wall conduit (EMT) to include fittings, connectors, bends, supports, hangers, conduits, pull boxes, and outlet junction boxes not to exceed 4-11/16" x 2-1/8" square maximum.
a. 1/2" diameter
LF
b. 3/4 diameter
LF
c. 1" diameter
LF
d. 1-1/4" diameter
LF
e. 1-1/2" diameter
LF
f. 2" diameter
LF
g. 2-1/2" diameter
LF
h. 3" diameter
LF
i. 4" diameter
LF
E7
Furnish, install and secure rigid steel conduit to include fittings, connectors, bends, supports, hangers, conduits, pull boxes not to exceed 4-11/16" x 2-1/8" maximum.
a. 1/2" diameter
LF
b. 3/4" diameter
LF
c. 1" diameter
LF
d. 1-1/4" diameter
LF
e. 1-1/2" diameter
LF
f. 2" diameter
LF
g. 2-1/2" diameter
LF
h. 3" diameter
LF
i. 4" diameter
LF
E8
Furnish, install, and secure flexible metal conduit including fittings, connectors and outlet/junction boxes not to exceed 4-11/16" x 2-1/8" square maximum.
a. 1/2" diameter
LF
b. 3/4" diameter
LF
c. 1" diameter
LF
d. 1-1/4" diameter
LF
e. 1-1/2" diameter
LF
f. 2" diameter
LF
E9
Furnish, install and secure flexible metallic liquid-tight conduit including fittings, connectors, supports and outlet/ junction boxes not to exceed 4-11/16" x 2-1/8" square maximum.
a. 1/2" diameter
LF
b. 3/4" diameter
LF
c. 1" diameter
LF
d. 1-1/4" diameter
LF
e. 1-1/2" diameter
LF
f. 2" diameter
LF
E10
F/I outlet box for outlets or switches. Box to be surface or recess mounted, adequate size for specified wiring device and maximum number of wires as allowed by code to accommodate this installation. (Does not include cable or conduit)
a. Single pole 20A switch
EA
b. Three way 20A switch
EA
c. Duplex Receptacle, 20A, 2 pole, 3 wire, 125V Nema 5-20
EA
d. Single Receptacle, 20A, 2 pole, 3 wire, 250V, Nema 6-20
EA
e. Single Receptacle, 20A, 3 pole, 4 wire, 125/250V, Nema 14-20
EA
f. Single recessed Data box with pull strings installed
EA
E11
Furnish, install in raceway system, copper electrical conductors, Per linear foot per conductor. To include connectors, 600 V maximum, solid to #10 AWG, larger sizes stranded
a. # 12 AWG THW insulation
LF
b. # 12 AWG THHN insulation
LF
c. # 10 AWG THW insulation
LF
d. # 10 AWG THHN insulation
LF
e. # 8 AWG THW insulation
LF
f. # 8 AWG THHN insulation
LF
g. # 6 AWG THW insulation
LF
h. # 6 AWG THHN insulation
LF
i. # 4 AWG THW insulation
LF
j. # 4 AWG THHN insulation
LF
k. # 2 AWG THW insulation
LF
l. # 2 AWG THHN insulation
LF
m. # 0 AWG THHN insulation
LF
n. # 2/0 AWG THHN insulation
LF
o. # 3/0 AWG THHN insulation
LF
p. # 4/0 AWG THHN insulation
LF
E12
Furnish, install and connect type (MC) armored flexible cable (bx with ground) in new partitions, and dropped ceilings including connections (mechanical and electrical), fittings, supports, straps, and insulators.
a. 12-2 MC
LF
b. 12-3 MC
LF
c. 10-2 MC
LF
d. 10-3 MC
LF
E13
Furnish, install and connect type (MC) armored flexible cable (bx with ground) in existing partitions and above dropped ceilings, including connections (mechanical and electrical), fittings, supports, straps and insulators
a. 12-2 MC
LF
b. 12-3 MC
LF
c. 10-2 MC
LF
d. 10.3 MC
LF
E14
F/I surface metal raceway, including all fittings, couplings, connectors, straps, adapters. When wiring is required, line item 12 must be included on order
a. Approx. 3/4" wide x 21/32" high (ex. Wire mold cat. 700 or equal)
LF
b. Approx. 2-3/4" wide x 1-3/4" high complete base and cover (ex. Wire mold cat. G-3000 or equal)
LF
c. Approx. 4-3/4" wide x 1-3/4" high complete with base and cover (ex. Wire mold cat. G-4000 or equal with or without dividers).
LF
d. Approx. 1-9/16" wide x 11/32" high, (ex. Wire mold cat. 1500 or equal)
LF
e. Approx. 4-3/4" wide x 3-9/16" high, complete with base and cover. Includes all fittings, connectors, take off and housing but no devices, wire or circuit breakers. If required, use applicable line items to include an order. Example, Wire mold G-6000 or equal.
LF
E15
F/I NEMA 1 galvanized junction box complete with a screw type cover and supports.
a. 6" x 6" x 4"
EA
b. 8" x 7" x 4"
EA
c. 12" x 12" x 6"
EA
d. 18" x 18" x 6"
EA
e. 18" x 18" x 8"
EA
f. 24" x 24" x 8"
EA
g. 24" x 24" x 12"
EA
h. 36" x 36" x 12"
EA
E16
Furnish, install and connect under floor outlet fittings with duplex receptacles or telephone service fittings into existing insert. Fittings shall match those existing in the building. If wiring is required, line item #12 must be included on order
a. Duplex receptacle and fitting
EA
b. Telephone outlet fitting
EA
E17
Core drilling reinforced concrete (not to include beams or columns) to 6" thick. (The Contractor shall locate reinforcing prior to drilling). No reinforcing shall be cut. The COR shall approve location of core prior to drilling. All penetrations shall be fire stopped. “no reinforcing relocation”
a. 1" diameter
EA
b. Each added inch thick
EA
c. 1-1/2" diameter
EA
d. Each added inch thick
EA
e. 2" diameter
EA
f. Each added inch thick
EA
g. 3" diameter
EA
h. Each added inch thick
EA
i. 6" diameter
EA
j. Each added inch thick
EA
E18
F/I Tele-Power® Poles, 2-3/4" x 1-17/32" Two Duplex Receptacles (20A, 125V) with mounting bezel, One Dual Cat 5e Insert, Two Blank Inserts and Labeling Supplies. For wiring, use applicable line items to provide power supply.
a. Pole height, 10' 5"
EA
b. Pole height, 12' 5"
EA
E19
Furnish, install and connect circuit breaker panel board, 3 phase, 4 wire, 100 ampere, 240V maximum. Main lugs only surface mount, top or bottom fed, complete with trim and cover with flush lock. Panel must accept bolt in type circuit breakers, 10,000 ampere interrupting rating. No circuit breakers or wiring included.
a. 12 circuit
EA
b. 24 circuit
EA
E20
Furnish, install and connect circuit breaker panel board, 3 phase, 4 wire, 100 ampere. With 100 ampere, 3 pole main circuit breaker, 10,000 ampere interrupting capacity. Surface cover with flush lock. Panel must accept bolt in type mount, top or bottom fed complete with trim and circuit breakers, 10,000 ampere interrupting rating. No other circuit breakers or wiring included.
a. 12 circuit
EA
b. 24 circuit
EA
E21
Furnish, install and connect 10,000A IC bolt-in type circuit breakers in existing panel boards.
a. 20A-1P (120V)
EA
b. 20A-2P (120V)
EA
c. 20A-3P (240V)
EA
d. 30A-1P (120V)
EA
e. 30A-2P (240V)
EA
f. 30A-3P (240V)
EA
g. 50A-2P (240V)
EA
h. 50A-3P (240V)
EA
i. 60A-2P (240V)
EA
j. 60A-3P (240V)
EA
k. 100A-3P (240V)
EA
E22
Furnish, install and connect E frame, 7500A IC type circuit breakers in existing panel board.
a. 20A-1P (120V)
EA
b. 20A-2P (240V)
EA
c. 20A-3P (240V)
EA
d. 30A-1P (120V)
EA
e. 30A-2P (240V)
EA
f. 30A-3P (240V)
EA
g. 50A-2P (240V)
EA
h. 50A-3P (240V)
EA
i. 60A-2P (240V)
EA
j. 60A-3P (240V)
EA
E23
Relocate surface mounted fluorescent light fixture including fixture outlet supports, and making electrical connections at fixture. (Conduit and wire from power source not included).
a. 1' x 4' - 2 lamps
EA
E24
Relocate surface mounted fluorescent light fixture (stems or chain) including making electrical connections at fixture, fixture outlet, and supports. (Conduit and wire from power source not included).
a. 1' x 4' - 2-lamp
EA
E25
Relocate recessed fluorescent light fixture in suspended ceiling grid system including making electrical connections at fixture, fixture outlet and supports. Add wire as required.
a. 1' x 4' - 2 lamps
EA
b. 2' x 4' - 3 lamps
EA
c. 2' x 4' - 4 lamps
EA
E26
F/I recessed high efficiency recessed troffer with 3M Silver Lux Reflector in suspended ceiling grid system, including two new T-8 (25 watt 4100K) lamp and making electrical connections. (Conduit and wire from power source not included).
a. 1' x 4' - 2-lamp
EA
b. 2' x 4' - 2-lamp
EA
c. 2' x 4' - 3-lamp
EA
d. 2' x 4' - 4-lamp
EA
e. 2' x 2' - (2 - 48" U-bent lamps)
EA
E27
Install new emergency (battery backup) LED lighting panel 8 watt for ceiling grid using metric or standard ceiling grids make all necessary electrical connections, item furnished by the contractor
a. 60cm x 60cm (Metric)
EA
b. 60cm x 120cm (Metric)
EA
c. 2' x 2 ' (Standard)
EA
d. 2' x 4 ' (Standard)
EA
E28
F/I 1/2 inch flexible metal conduit, high temperature wire (90C) and junction box (if required) and make connections at both ends.
LF
E29
F/I exit light fixture, LED TYPE, including making electrical connections at fixture, outlet and supports. (Conduit and wire from power source not included). Fixture furnished by the Contractor
a. Standard exit fixture - one face
EA
b. Standard exit fixture - two face
EA
c. Standard Reflective
EA
E30
F/I recessed high hat type fixture, including lamps and making electrical connections at the fixture. (Conduit and wire from power source not included)
a. LED
EA
b. Fluorescent
EA
E31
F/I LUTN 1000 dimmer switch, making electrical connections. (Conduit and wire from power source not included).
EA
E32
F/I LUTN 1500 dimmer switch, making electrical connections. (Conduit and wire from power source not included).
EA
E33
F/I fluorescent dimmer switch, making electrical connections. (Conduit and wire from power source not included).
EA
E34
F/I dimmer ballast, making electrical connections.

(Conduit and wire from power source not included).

EA

E35
Install system furniture hookup, including making electrical connections. (Pigtail furnished by Government). Add to demo wall section
EA
E36
Remove transom fan and all associated wiring, install plywood in opening, and stain to match
EA
E37
F/I light sensor
a. Reinstall (Existing)
EA
b. New
EA
E38
F/I replacement electrical outlet and cover plate. This is to replace existing outlet with new matching devises and cover plates.
EA
E39
Furnish and Uninstall replacement switches and cover plates. This is to replace existing outlet with new devises and cover plates.
a. Single switch, per unit
EA
b. Double switch, per unit
EA
c. Double switch with Electrical outlet, per unit
EA
E40
F/I under carpet wire systems (TE Under carpet wire system) with floor mounted outlet, power transition block, Power whip kit, Stainless steel bonding clips, with associated tool and connectors needed for installation of floor system
a. Surface mounted power source
EA
b. Recessed power source
EA
E41
F/I recessed dedicated wall outlet(s)
EA
a. GFCI
EA
b. Recessed mounted
EA
c. Surface mounted
EA
E42
Remove ceiling fan and all associated wiring and accessories, install ceiling tiles in opening.
a. Demo and remove fan
EA
E43
Install new LED lighting panel 8 watt for ceiling grid using metric or standard ceiling grids make all necessary electrical connections, item furnished by the contractor
a. 60cm x 60cm (Metric)
EA
b. 60cm x 120cm (Metric)
EA
c. 2' x 2 ' (Standard)
EA
d. 2' x 4 ' (Standard)
EA
E44
Install new LED downlights and make all necessary electrical connections, item furnished by the contractor
E45
Remove and reinstall/relocate the existing Public Address system ceiling speakers
EA

FINISHES

F1
Carpet removal / disposal
a. Broadloom
SY
b. Carpet tile
SY
F2
Remove and dispose of existing carpet, perform site prep, F/I new Carpet Tile
a. Shaw Carpet, Connect Tile 59342, Ciao Bella 40855 (or approved equal)
SY
b. Shaw Carpet, Kinetic Tile 59359, Metal Guru 58595 (or approved equal)
SY
c. Tandus Carpet, Merge 03550, Evening Edition 63507 (or approved equal)
SY
d. Tandus Carpet, Pietrra 03101, Underground 17718 (or approved equal)
SY
F3
Furniture Lift (added to the cost of work where furniture must be moved/removed and reset). Square yardage will be the measurement of the furniture.
SY
F4
Carpet repair (Government furnished carpet) where partitions are removed or installed.
LF
F5
Remove existing vinyl/rubber cove base, patch and finish to even surface
a. 4" high
LF
b. 6" high
LF
F6
F/I vinyl and/or rubber cove base
a. 4" wide
LF
b. 6" wide
LF
F7
F/I edging strips for floor tile /Carpet
a. Beveled vinyl transition strip
LF
b. Aluminum (Bullnose/Threshold)
LF
F8
Remove resilient floor tile (including patching floor)
SF
F9
F/I resilient floor tile
a. 12" x 12" x 1/8" vinyl tile
SF
b. 12" x 12" x 3/32" vinyl tile
SF
F10
F/I 3.5" rock wool batting insulation in conjunction with partition installation for soundproofing
SF
F11
Remove and re-install window accessories (Existing Access)
a. Blinds
EA
b. Blast Curtains ( Safety Drapes)
EA
c. Window Treatments/Curtain or Drapes
EA
D. Solar Shades
EA
F12
Remove and replace window sill (include: prime /paint)
a. Interior window sills
LF
F13
F/I new Safety Drape glass mitigation system by Mitigation Technology or approved equal. This includes removal of old drape and associated hardware.
a. 24" wide X up to 80" long
EA
b. 48" - 55" wide X up to 88" long
EA
c. 89" - 91" wide X up to 100" long
EA
F14
F/I blinds. This includes removal of old blind, associated hardware and installation of the new system with all associated accessories and parts (Blinds should include: tilt string, instead of wand).
a. 2" aluminum (color: Alabaster)
SF
b. 1” aluminum mini-blinds (color: Alabaster)
SF

Door Hardware

H1
F/I new hardware on existing door
a. Door closer
EA
b. New coordinating device panic hardware-Corbin Russwin or approved equal
EA
c. New door stop (floor mount)
EA
d. New door stop (wall mount)
EA
H2
F/I new panic hardware for double doors
EA
H3
F/I new automatic door opener with two remote activation
EA
H4
F/I new panic hardware
a. Single Door
EA
b. Double Door
EA
H5
F/I automatic ADA door openers (install at standard height per building codes)
EA
H6
F/I Corbin Russin Mortise Lock with ML 2051-w/ Sargent removal cores, COR will provide core specifications, knob shall meet ADA requirements
EA
H7
F/I cylindrical Lock set (Arrow RL) with Sargent Core, with lever shall meet ADA requirements
EA

MECHANICAL

M1
Remove existing sheet metal ductwork, including terminals, diffusers, hangers and associated appurtenances
LF
M2
F/I sheet metal duct with 1" sound lining, including hangers, fasteners, and collar takeout allowance for scrap
a. 6" Similar to M6
EA
b. 8" Similar to M6
EA
c. 10 " Similar to M6
EA
d. 12 " Similar to M6
EA
M3
F/I sheet metal including hangers, fasteners, and allowance for scrap.
a. 24 gage
SF
b. 22 gage
SF
c. 20 gage
SF
M4
F/I insulated flexible duct including tapping in to the existing ductwork (neck size). Maximum length allowed 10' 0"
a. 6" diameter
LF
b. 8" diameter
LF
c. 10" diameter
LF
d. 12" diameter
LF
M5
F/I uninsulated flexible duct including tapping into the existing ductwork (neck size). Maximum length allowed 10' 0".
a. 6" diameter
LF
b. 8" diameter
LF
c. 10" diameter
LF
d. 12" diameter
LF
M6
F/I sound lined flexible duct including tapping into the existing ductwork (neck size). Maximum length allowed 10' 0".
a. 6" diameter
LF
b. 8" diameter
LF
c. 10" diameter
LF
d. 12" diameter
LF
M7
F/I insulation with vapor barrier on ductwork
SF
M8
F/I ceiling diffuser in grid system, 24" x 24" finished dimension or square face, neck size (0 - 900 cfm) with opposed blade volume damper.
a. 6" diameter
EA
b. 8" diameter
EA
c. 10" diameter
EA
d. 12" diameter
EA
M9
F/I return air grilles and /or panel type diffusers in grid system rectangular face, diameter 24" x 24" finished dimension, 0 - 1000 cfm, (neck size):
a. 8" (0 - 250 cfm)
EA
b. 10" (250 - 500 cfm)
EA
c. 12" (500 - 750 cfm)
EA
d. 14" (750 - 1000 cfm)
EA
M10
F/I perforated plate in ceiling grid system(either supply or return)
a. 24" x 24"
EA
b. 24" x 48"
EA
M11
F/I in duct: Opposed blade volume damper
a. Up to 150 sq. in.
EA
b. 151 to 400 sq. in.
EA
c. 401 to 800 sq. in.
EA
d. 801 to 1300 sq. in.
EA
M12
F/I in main duct: Splitter damper outside controller
a. 200 to 400 sq. in.
EA
b. 401 to 800 sq. in.
EA
c. 801 to 1600 sq. in.
EA
M13
F/I in duct: Access door as required by SMACNA or as directed by the COR. Up to 200 sq. in.
EA
M14
F/I in duct: Fire damper - curtain located outside air stream.
a. Up to 180 sq. in.
EA
b. 181 to 600 sq. in.
EA
c. 601 to 1300 sq. in.
EA
M15
F/I lineal supply air diffuser consisting of minimum 6-slot (transverse) tee, air plenum with flexible hose inlet and adjustable damper. “linear diffuser only”
a. Nominal 5' 0" length, 4" minimum width
EA
b. Nominal 6' 0" length, 4" minimum width
EA
c. Remove the existing ceiling diffuser cap openings when the main duct is to remain.
EA
d. Remove the existing return air grille, cap opening when the main duct is to remain.
EA
e. Relocate the existing diffuser
EA
f. Relocate existing return air grille, cap opening not reusing including new cap into the existing system
EA
M16
BALANCING AIR ( including subcontractor labor and material)
a. Heating and ventilation equipment
EA
b. Centrifugal fans, utility unit
EA
c. Heating and ventilating unit
EA
d. In-line fan
EA
e. Propeller and wall fan
EA
f. Room exhaust fan
EA
g. Air conditioning equipment, central station
EA
h. Built-up high pressure unit
EA
i. Built-up low pressure unit
EA
j. Multi-zone AC and heating units
EA
k. For each zone over one, add
EA
l. Rooftop heating and cooling unit
EA
m. Supply, return exhaust registers and diffusers, Average height ceiling below 12' 0" high
EA
n. High ceiling - above 12' 0"
EA
M17
Remove and replace CI unit, install new shut off valve 2 pipe system, electronic controls, grill covers and accessories, including sheet metal tie ins as required. (Carrier unit or equal)
a. 42"
EA
b. 48"
EA
c. 52"
EA

PAINT

P1
Repair gypsum board cracks and/or joints. Spackle, tape and sand smooth. Apply one coat of sealer.
SF
P2
Remove existing defective gypsum board, patch with new gypsum board and framing, if necessary. Tape joints, spackle and sand smooth. Apply one coat of sealer.
SF
P3
Remove existing corner bead. Install metal corner bead and replace plaster. Apply one coat of sealer.
a. Plaster Wall
LF
b. Drywall
LF
P4
Repair plaster cracks in excess of 1/16" wide (under cut all cracks, apply bonding agent). Apply one coat of sealer.
SF
P5
Remove and replace alligatored white coat (to be used where brown coat is solid and firmly adhered to lath). Seal brown coat with bonding agent before white coat. Apply one coat of sealer. (This item shall be used for patching areas smaller than 10 square feet).
SF
P6
Remove existing plaster and backing lath. Replace with new lath, and gypsum plaster. Apply one coat of sealer.
a. Rock lath (2 coats plaster)
SF
b. Metal lath (3 coats plaster)
SF
P7
Furnish and apply gypsum plaster on base as described below: Apply one coat of sealer. (This item is only for plaster on walls, ceilings are not included).
a. Rock lath ( 2 coats plaster)
SF
b. Metal lath ( 3 coats plaster)
SF
c. Masonry wall (2 coats plaster)
SF
d. Add to items P7-a and P7-b for plaster installation on ceilings.
SF
P8
Premium to be added to unit prices for any items No. P1 through P7 when area of work is higher than 12' 0" above the finished floor Furnish materials, prepare surfaces, and paint with brush or roller method (under 12' 0")
SF
P9
Paint walls, partitions, ceilings, columns, floors, or other miscellaneous flat surfaces (Paint sheen TBD)
a. Paint 1 coat
SF
b. Paint 2 coats
SF
P10
Paint shelves, cabinets, base, moldings, window sash and trim, stair risers, doors, frames, miscellaneous trim (Paint sheen TBD)
a. Paint 1 coat
SF
b. Paint 2 coats
SF
P11
Paint ornamental work, railings, grilles, etc. (Brush only) Price for one coat
a. Paint 1 coat
SF
b. Paint 2 coats
SF
P12
Ductwork, conduit, piping (over 6" in diameter) Price for one coat. Wall or ceiling mounted items under 6" in diameter shall be painted at no extra cost.
SF
P13
Premium to be added to unit prices for any item No. P9 through P12 when area of work is higher than 12' 0" above the finished floor.
SF
P14
Furnish materials, prepare surfaces and: (under 12' 0" high)
a. Clear varnish in finish as ordered
SF
b. Stain in finish as ordered
SF
c. Stain-Varnish in finish as ordered
SF
P15
Furnish materials, prepare surface and paint radiators (Brush only)
SF
P16
Furnish materials, prepare surface and install vinyl wall covering.
SF
P17
Remove vinyl wall covering on plaster walls only. Prepare surfaces for painting (patch and prime one coat)
SF
P19
Furnish labor and material to paint parking lines in parking areas with zone marking paint - 1 coat 4" wide
LF
P20
Furnish labor and material to paint special messages on pavement with zone marking paint
a. Handicap symbol, 12 inch diameter
EA
b. Individual letters or numbers, 12" high
EA
P21
Cover existing painted traffic designations (e.g., traffic lines, lettering, numbers, etc.) with one coat of black asphalt paint
LF

GENERAL WORK

PROTECTIVE ENCLOSURES

S1
Install the following enclosure types in locations and to the extent directed by the Government. (Price includes: supplying all materials and labor to install and remove the specified protection methods).
a. 6 MIL Polyethylene suspended from the existing ceiling system and weights applied 4' 0" C.C. at floor
SF
b. 6 MIL Polyethylene secured to wood studs @ 24" O.C. with top and bottom 2' x 4' wood plate
SF
c. 1/2" Gypsum board secured (one side) to wood studs @ 24" O.C., joints taped (one coat compound). Provide hollow core wood access door (3' 0" x 6' 8") where required.
SF

DRYWALL CONSTRUCTION

W1
Remove entire existing wood or metal stud drywall partition. This includes the removal of door and door frame, molding, cove base all electrical wiring back to power source to include communications wire (outlet box). F/I cap on box. Remove all electric outlets and switches. Door, door frames and hardware shall be either returned to the Government or removed from the premises as directed by COR.
a. Partitions up to 6" thick, 12" high
SF
b. Add to the above for any part of partition above 12
SF
c. Remove solid metal partition
SF
W2
Remove existing wood or metal stud plaster partition, includes door and door frame, all electrical, baseboards and moldings, to include communications wiring back to power source. F/I cap on box (includes electric outlet and switch removal). Doors, door frames and hardware shall be either returned to the Government or removed from the premises as directed by the COR.
a. a. Partitions up to 6" thick, 12 high
SF
b. Add to the above for any part of partitions above 12
SF
W3
Remove drywall, one side, of wood or metal stud partition (for sound proofing). F/I new 1/2" drywall when soundproofing has been completed, includes prime one coat and paint two coats. Include rock wool insulation
a. Taped joints up to 12' high
LF
b. Taped joints above 12' high
LF
W4
Remove existing wood or metal door and door frame from drywall or masonry partition. Finish patch and paint. Door, door frame and hardware shall be either returned to the Government or removed from the premises as directed by the COR.
a. In drywall partition (wood or metal stud)
EA
b. In Masonry partition (cinder block, clay tile, brick, etc.)
EA
W5
Remove door and door frame in existing partition and seal the opening to match the adjacent surface, and paint to match existing wall and include insulation. Door, door frame and all hardware shall be either returned to the Government or removed from the premises as directed by the COR.
a. In drywall partition (wood or metal stud)
EA
b. In masonry partition (cinder block, clay tile, brick, etc.)
EA
c. In plaster partition (wood or metal stud)
EA
W6
Furnish all labor and material to install metal stud drywall partition. One hour fire rating (gypsum board both side of partition). Includes installation of rock wool fire resistant batting insulation, cutting and framing openings for doors, windows, etc. Prime one coat and paint two coats, color specified by the Government.
a. Joints taped and spackled, up to 12'
LF
b. Joints taped and spackled, above 12'. (Applies to that portion above 12' 0".)
SF
c. Two hour fire rating, up to 12' 0"
LF
d. Two hour fire rating above 12' 0". (Applies only to that portion above 12' 0".)
SF
W7
Furnish all labor and material to install metal stud drywall partition One hour Fire Rating (gypsum board one side only). Includes installation of insulation, cutting and framing for doors, windows, etc. Prime one coat and paint two coats. Color as specified by the Government.
a. Joints taped and spackled, up to 12' 0"
LF
b. Joints taped and spackled above 12' 0". (Applies only to that portion above 12' 0".)
SF
c. Two hour fire rating, up to 12' 0"
LF
d. Two hour fire rating above 12' 0". (Applies only to that portion above 12' 0".)
SF
W8
Furnish all labor and material to install metal furring strip drywall partition (gypsum board one side only). Includes installation of insulation, cutting and framing for doors, windows, etc. Prime one coat and paint one coat.
a. Joints taped and spackled, up to 12' 0" high
LF
b. Joints taped and spackled above 12' 0". (Applied only to that portion above 12' 0").
SF
W9
Using 2" x 4" wood stud, fire treated. Includes nailing metal to studs and framing for doors.
a. 14 GA
LF
b. 12 GA
LF
c. 11 GA
LF
W10
Using 2" x 2" x 1/4" black angle iron and 1-1/2" x 1-1/2" x 3/16" T angle iron. Angle iron is to be anchored in slab and columns. "T" bar applied at seams. Tack weld metal every 1' intervals, top, bottom, and seam.
a. 14 GA
LF
b. 12 GA
LF
c. 11 GA
LF
W11
Using 2" x 4" wood studs, fire treated, including nailing metal to studs and framing for doors.
a. 14 GA
SF
b. 12 GA
SF
c. 11 GA
SF
W12
Using 2" x 2" x 1/4" black angle iron and 1-1/2" x 1-1/2" x 3/16" T angle iron. Angle iron is to be anchored in slab and columns. "T" bar applied at seams. Tack weld metal every 1' intervals, top, bottom, and seam.
a. 14 GA
SF
b. 12 GA
SF
c. 11 GA
SF
W13
Provide and install a 3' 0" x 7' 0" single door. Made with same material as items W17a and W17b. Includes hinges, and door handle.
a. W17a - Wood frame
EA
b. W17b - Metal frame
EA
W14
F/I new molding. (_________ # from Smooth Lumber Molding Catalog)
a. Quarter round, WM-106, 11/16" x 11/16", A grade clear pine
LF
b. Sanitary Shoe Molding, SM-200 1/2" x 3/4", A grade clear pine
LF
c. Jumbo Sanitary Shoe Molding, SM-200J 3/4" x 1", A grade pine (RS Means 11/16 x 1 1/2)
LF
d. Base Cap, Beveled Oqee, WM-164, 11/16" x 1 1/8", A grade clear pine
LF
e. Chair Rail, LWM-390, 11/16 x 2 1/2" , A grade clear pine
LF
f. Chair Rail, LWM-297 3/4" x 3" A grade clear pine (RS Means 5/8 x 3 1/2)
LF
g. Casing, SM-68 and WM-623, 1-1/16 x 4-1/4 , A grade clear pine
LF
h. Stop, Ogee, WM-946 3/8" x 1/3/8", A grade clear pine
LF
i. Base, Ogee, WM-620 9/16" x 4 1/4"
LF
W15
F/I new Crown Molding, A grade clear pine. (# from Smooth Lumber Company mold)
a. Crown, WM-68, 9/16" x 1 5/8"
LF
b. Crown Bed Mold, WM-75, 9/16" x 1 5/8"
LF
c. Crown, Cove,, WM-86, 9/16 x 1 5/8"
LF
d. Crown, WM-53, 9/16" x 2 5/8"
LF
e. Crown, SM-22, 3/4" x 3 5/8"
LF

LF

W16
F/I heavy duty 4' high corner angle for corner protection.
a. 4" x 4" x 3/8"
EA
b. 6" x 6" x 3/8"
EA
c. 8" x 8" x 1/2"
EA
W17
F/I framing members only. Tack weld to other framing units and install anchors to slab or walls as needed Primary use is for expanded metal support legs or wall supports.
a. 2" x 2" x 1/4" angle
LF
b. 1-1/2" x 1-1/2" x 3/16 T bar
LF
c. 1-1/2" x 1-1/2" x 3/16" angle
LF
W18
Remove existing molding
a. To be disposed of
LF
b. Save and reuse
LF
W19
Remove raised floor tile, tracks, and supports. Repair cracks and holes in floor
SF
W20
F/I 3 piece wood base. To include base, base cap and shoe molding. Paint grade pine.
a. 3/4" x 6 - 5/8"
LF
b. 3/4" x 8 - 1/2"
LF
W21
F/I laminate safety glass. Trim out windows.
SF
W22
F/I Fire rated plywood to existing walls (up to 12') and floors
a. 4' x 8' x 1/4"
SF
b. 4' x 8' x 1/2"
SF
c. 4' x 8' x 3/4"
SF
W23
F/I fire rated wood blocking behind the drywall
a. 2 x 6 blocking
LF
b. 3/4" plywood
SF

SECTION C--DESCRIPTION/SPECIFICATIONS

STATEMENT OF WORK-GENERAL

BACKGROUND

The USDA South Building, one of the largest federal office buildings, was built between 1930 and 1936; provides space for approximately 4600 employees and is located south of the National Mall on Independence Avenue between 12th and 14th streets, S.W., Washington, DC. The building is listed on the National Register of Historic Places and shall be treated as a historic building. Therefore, the knowledge of historic preservation principles and procedures related to design, review submissions and working experience is significant. The building is a six (6) story steel frame building with a sub-basement, basement and an attic. It has seven (7) wings with a headhouse (Independence Ave side) and tailhouse (C street side) and six (6) courtyards. The building comprises over 2.2 million gross SF with over seven miles of corridors.

The Jamie L. Whitten Building, originally known as the Administration Building, was built in two phases. The L-shaped, East and West wings were built from 1904 thru 1908. The Central Section was built from 1928 thru 1930. This is the only Federal Building that faces the National Mall and it is also in the National Register of Historic Buildings. The building has over 380,000 gross SF.

The U.S. Department of Agriculture at Beltsville, Maryland is an office complex built in 1997 that provides office space for approximately 1000 employees. It consists of four buildings and has over a total of 360,000 gross SF. The complex was renamed George Washington Carver Center GWCC) in October 1999.

INTRODUCTION

The USDA Office of Operations, Facilities Management Division (OO/FMD) need a multiple award task order contract (MATOC) for construction, design, and/or design build projects at the Department of Agriculture Headquarters (South and Whitten Buildings) and other buildings (George Washington Carver Center (GWCC) in Beltsville, MD) in the Washington, DC metropolitan area as well as other locations nationwide.

The work under this contract will be primarily divided into two categories typified by the two SEED projects. The hypothetical project represents a large quantity of similar projects that USDA does in the specified buildings during a typical year. The Design-Build SEED project represents a project of the type and nature that USDA might also procure under the contract.

REQUIRED SERVICES

General project descriptions shall be derived from the statement of work (SOW) of each individual Task Order (TO) that is issued. The work may consist of multi-discipline architectural/engineering (A/E) services or construction or both. These services include but not be limited to the following categories of work: construction, study, design, design build, interior and exterior renovations, tenant build out, heating and air-conditioning, HVAC controls, plumbing, fire suppression, interior and exterior electrical and lighting, fire alarms, communications, escalator and elevator repairs, abatement of hazardous materials such as asbestos and lead paint, site-work, landscaping, masonry, roofing, waterproofing, waterproofing by epoxy injection, concrete, plaster, asphalt paving, painting, storm drainage, demolition and other construction-related work.

The architectural/engineering (A/E) services mentioned above shall also include, but are not limited to, surveys; testing; reports; concept studies; all aspects related to designs, specifications, drawings and cost estimates including interacting with CFA, NCPC and SHPO for section 106 compliance with the Historic Preservation; construction monitoring and inspection services, as may be required under each task order. All drawings shall be prepared with Autodesk AutoCAD version 2015 or higher. The designs shall be signed by architect and/or professional engineer registered with the District of Columbia (D.C.) for the work in D.C. and with Maryland for the work in Maryland.

The Section C –Supplemental Description/Specifications/Work Statement for Supplies or Services and Prices/Costs –is typical administrative and housekeeping requirements for all construction task orders in addition to the specific requirements in the scope of work in each of the task orders.

PRE-PROPOSAL CONFERENCE

Prior to providing the cost proposal under a task order, contractors shall conduct a walkthrough at the site to factor in existing conditions in the proposal.

CONSTRUCTION KICK-OFF MEETING

Prior to starting work under a task order, contractor shall meet with the Contracting Officer and Contracting Officer’s Representative (COR) on a kickoff meeting.

PROJECT CLOSEOUT

At the completion of the construction project, contractor shall follow project closeout procedures as stated in section C of this document.

SECTION C – SUPPLEMENTAL DESCRIPTION/SPECIFICATIONS/WORK STATEMENT FOR SUPPLIES OR SERVICES AND PRICES/COSTS

C.1 DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

The Contractor shall furnish all necessary labor, parts, tools, materials, equipment, supervision, and appurtenances to perform the work described under Supplies/Services at the USDA locations (see “Description”). The work shall be performed when authorized by any Delivery/task Order which shall be performed in accordance with Section C. The Contracting Officer shall be the only authorized issuing officer for Delivery/task Orders under this awarded contract, unless otherwise indicated by the contract.

SUPPLEMENTARY CONDITIONS

SCHEDULES AND REPORTS

1.GENERAL
1.1COORDINATION:
1.1.1Coordinate both the procedural timing and the listing (naming and sequencing) of activities required by provisions of this section and other sections, for consistency and logical coordination between submitted lists.
1.2CONSTRUCTION PROGRESS SCHEDULE
1.2.1Refers to the Construction Contract Clauses (Fixed-Price), Schedules for Construction Contracts.
1.2.1.1SCHEDULING OF WORK:
1.2.1.1.1Before any of the work within the Scope of the contract is started, the Contractor shall confer with the Office of Operations, Facilities Management Division, Task Order COR, to agree on a sequence of procedure; means of access to premises and buildings; delivery of materials, and use of approaches; use of corridors, stairways, elevators, and, eating spaces for Contractors and their subcontractors. It is the sole responsibility of the Contractor to field verify all site conditions to ensure accuracy of drawings, scopes of work and work plans.

Occasionally some furniture might be left in a space where work is scheduled and in this case the contractor should move the furniture as required to do work and move it back when work is completed as part of scope. This is an exception and not the rule.

1.2.1.1.3Delivery of materials and equipment shall be made with a minimum of interference to Government operations and personnel. The designated location and time of material delivery shall be determined by an Office of Operations, Facilities Management Division representative/ CO/COR, or on the delivery order.
1.2.1.1.4.1The work shall be done in designated sections or divisions and confined to limited areas, which shall be completed before work in other sections or divisions, is begun.
1.2.1.1.5All temporary outages of any utility service required for the performance of work shall be scheduled with the Office of Operations, Facilities Management Division, Task Order COR, no less than 24 hours in advance of such outages.
1.3SUBMITTAL SCHEDULE
1.3.1SHOP DRAWINGS AND SAMPLES: Submittals shall be submitted prior to execution of initial Delivery Order for this Contract and Submittals covering recurring items shall upon approval, remain as standard for remainder of Contract. Where new or differing materials or items are encountered, on a Delivery Order, provide appropriate Submittals for approval. In the case of paint contracts only, sample submittals and supplier’s record of test results are required.
1.3.2Contractor: Review period of five (5) calendar days starting from the date of submission will be required for checking and appropriate action by the Contracting Officer and the return of these items.
1.3.3Resubmission of rejected items shall be made within five (5) calendar days from the date of the rejection letter.
1.3.4Unless otherwise specified, schedules, certificates, and samples shall be submitted not later than five (5) calendar days after the receipt of Notice to Proceed. Shop drawings shall have the Contractor’s stamp of approval on each drawing, signed and dated as evidence of the Contractor’s verification and coordination of the items submitted.
1.3.5Each submittal shall be covered by an appropriate Contractor’s transmittal letter and sent to the Office of Operations, Facilities Management Division, Repair and Alterations Branch.

SECTION 01205 PROCEDURES AND CONTROLS

1.GENERAL:
1.1DESCRIPTION OF WORK:
1.1The types of minimum requirements for procedures and performance or control work of a general nature include but are not necessarily limited to the following categories:
1.Coordination and meetings.
2.Administrative/supervisory personnel.
3.Surveys and records or reports.
4.Limitations for use of site.
5.Special reports.
6.Tradespeople and workmanship standards.
7.Inspections, tests, and reports.
8.General installation provisions.
9.Cutting and patching.
10.Cleaning and protection.
11.Energy Conservation.
12.Environmental Protection.
1.2COORDINATION AND MEETINGS
1.2.1General: Prepare and distribute to each entity performing work at project site, a written memorandum of instructions on required coordination activities, including required notices, reports and attendance at meetings. Prepare similar memorandum for separate contractors where interfacing of work is required.
1.2.2Coordination Drawings: Refer to clause “Shop Drawings, Coordination Drawings, and Schedules,” of “General Conditions,” for general requirements.