NEW BID SCHEDLUE FOR MILL CREEK.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GLENN SITE 17—BID SCHEDULE
Item No. Spec. Description Quantity Unit Unit Cost Total Cost
1. 1 Mobilization and 1 LS ________________ _______________ Demobilization
2. 2 Clearing and Grubbing 0.2 ACRE _________________ _______________
3. 3 E & S Control 1 LS _________________ _______________
4. 1000 Access Road 850 LF ________________ _______________
5. 1009 Access Gate 1 LS _________________ _______________
| 6. | 1001 Stream Intake Structure | |||||
| (a) Piping | 1 | LS | _______________ | _________________ | ||
| (b) Concrete | 1 | LS | _______________ | _________________ |
7. 4 & 23 Uncl. Excav. & Earthfill 1 LS _______________ ________________
8. 1002 High Quality Limestone
(a) System startup 50 Ton __________________ _______________
(b) 20 year longevity 80 Ton __________________ _______________
9. 45 Piping (SCH 40 PVC) installed
| (a) 4” Solid Pipe 8 LF _________________ _______________ | |||
| (b) 6” Perforated Pipe 20 LF _________________ _______________ | |||
| (c) 6” Solid pipe | 155 LF _________________ ________________ | ||
| (d) 8” Perforated Pipe 5 LF __________________ ________________ | |||
| (e) 8” Solid Pipe | 5 LF | _________________ ________________ | |
| (f) 6” Gate Valve 9 EA _________________ ________________ |
(g) 2” Dutile Iron Valve 1 EA _________________ ________________
| 10. 1001 Upflow Limestone Well | 2 EA __________________ _________________ | ||
| 11. | 1012 Flow Splitter Box | 1 LS __________________ _________________ | |
| 12. 61 Rock Lining / Rock Channel | 25 SY __________________ _________________ | ||
| 13. 1007 Monitoring Weir | 1 EA __________________ _________________ | ||
| 14. | 6 Seeding/Restoration 0.2 Acre ________________ ________________ | ||
| GLENN SITE 17 BID SCHEDULE TOTAL COST= _________________ |
GLENN SITE 19—BID SCHEDULE
Item No. Spec. Description Quantity Unit Unit Cost Total Cost
1. 1 Mobilization and 1 LS ________________ _______________ Demobilization
2. 2 Clearing and Grubbing 4 ACRE ________________ _______________
3. 3 E & S Control 1 LS ________________ _______________
4. 1000 Access Road 1400 SY _______________ _______________
5. 1009 Access Gate 1 LS ________________ _______________
6. 4 & 23 Uncl. Excavation & Earthfill 1 LS ________________ _______________
| 7. | 1010 Underdrain | 1200 LF ________________ ________________ |
| 8. 97 Geotextile Liner | 4655 SY _________________ ________________ |
9. 1002 High Quality Limestone
| (a) System startup 150 Ton _________________ ________________ |
| (b) 20 year longevity 175 Ton _________________ ________________ |
10. 1013 Limestone 4200 Ton _________________ ________________
11. 45 Piping (SCH 40 PVC) installed
| (a) 4” Slotted Pipe 325 LF _________________ _______________ | ||
| (b) 4” Solid Pipe 100 LF _________________ _______________ | ||
| (c) 6” Slotted Pipe | 80 LF _________________ ________________ | |
| (d) 6” Solid Pipe 1,110 LF _________________ ________________ | ||
| (e) 4” Gate Valve 2 EA _________________ ________________ | ||
| (f) 6” Gate Valve | 8 EA _________________ _________________ |
12. 1011 Upflow Limestone Column 2 EA __________________ ________________
13. 1006 Orifice Flow Control 2 EA ___________________ _________________
14. 61 Rock Lining/Rock Channel
| (a) Outfall Channels (R3) 140 SY __________________ ________________ |
| (b) Rock Lined Ditch (R4) 50 SY __________________ ________________ |
| (c) Energy Dissipator (R5) 9 SY __________________ _______________ |
15. 1007 Monitoring Weir 1 EA _________________ _____________
16. 6 Seeding/Restoration 2.8 Acre _________________ _____________
17. 1014 Cleanouts 18 EA _________________ _____________
18. 1015 Baffles 1 EA _________________ _____________
GLENN SITE 19 BID SCHEDULE TOTAL COST = _______________
| PLUS |
| GLENN SITE 17 BID SCHEDULE TOTAL COST= _________________ |
TOTAL BOTH SITE 17 & 19 BID SCHEDULE COST = _______________________