Construction specification and items of work

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Specification 8—Mobilization and Demobilization

1. Scope The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.

2. Equipment and material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable;

and other items specified in section 4 of this specification.

Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.

This work includes mobilization and demobilization required by the contract at the time of award.

If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.

3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.

Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS008-1

4. Items of work and construction details

Items of work to be performed in conformance with this specification and construction details are:

A. Bid Item 1, Mobilization and Demobilization

1. This item shall include the movement of the contractor’s forces and equipment to the site for the execution of the contract work.

2. In Section 3, Payment, Payment for mobilization and demobilization shall be by lump sum upon the completion of all work and only after the contractor has removed all equipment from the site.

3. Items of work subsidiary to this Bid Item are:

a. Traffic Control – Construction Specification 9

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS008-2

Construction Specification 9—Traffic Control

The work shall consist of establishing traffic control and maintaining safe, convenient use of public roads and rights-of-way.

2. Traffic and access The contractor's operations shall cause no unnecessary inconvenience to the public. The public rights-of-way shall be maintained at all times unless interruption is authorized by proper local authority. Contractor's authorized closing or detour plans shall be provided to the engineer for approval.

Safe and adequate access shall be provided and maintained to all public protection devices and to all critical utility control locations. Facility access shall be continuous and unobstructed unless otherwise approved.

3. Storage of equipment and material in public streets Construction materials and equipment shall not be stored or parked on public streets, roads, or highways. During any material or equipment loading or unloading activities that may temporarily interfere with traffic, an acceptable detour shall be provided for the duration of the activity. Any associated expense for this activity is the responsibility of the contractor.

Excavated material, including suitable material that is intended for adjacent trench backfill or other earth backfill as specified in section 5 of this specification, shall not be stored on public streets, roads, or highways that remain in service for the public. Any waiver of this requirement must be obtained from the proper local authority and approved by the engineer. All excess and unsuitable material shall be removed from the site as soon as possible. Any spillage shall be removed from roadways before they are used by the public.

4. Street closures, detours, and barricades The contractor shall comply with the requirements of all applicable responsible units of government for closure of any street, road, or highway. The contractor shall provide the required barriers, guards, lights, signs, temporary bridges, and flaggers together with informing the public of any detours and construction hazards by the most suitable means available, such as local newspapers or radio stations. The contractor is also responsible for compliance with additional public safety requirements that may arise during construction. The contractor shall furnish, install, and, upon completion of the work, promptly remove all signs, warning devices, and other materials used in the performance of this work.

Unless otherwise specified, the contractor shall notify, in writing, the fire chief, police chief, county sheriff, state patrol, schools that operate school buses, or any other government official as may be appropriate no less than 7 days before closing, partly closing, or reopening any street, road, or highway.

Unless otherwise specified, the contractor shall furnish to the engineer a written plan showing the proposed method of signing, barricading for traffic control, and safety for street detours and closures.

NY–TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS009-1

All temporary detours will be maintained to ensure use of public rights-of-way is provided in a safe manner. This may include dust control, grading, and graveling as required in section 7 of this specification.

5. General and specific references All signs, signals, barricades, use of flaggers, and other traffic control and public safety devices shall conform to the general requirements set forth in the Manual of Uniform Traffic Control Devices (MUTCD) and the latest edition of Standard Highway Signs and Standard Alphabets for Highway Signs and/or OSHA Construction Industry Standards (29 CFR Part 1926), Subpart G, Signs, Signals, and Barricades unless otherwise specified in section 7 of this specification.

6. Measurement and payment Compensation for any item of work described in the contract, but not listed in the bid schedule will be included in the payment for mobilization.

NY–TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS009-2

7. Items of work and construction details

Items of work to be performed in conformance with this specification and construction details are:

A. Subsidiary Item, Traffic Control

1. This item shall consist of safely maintaining pedestrian and vehicular traffic through and around the construction sites and staging areas during the entire contract period.

It shall also consist of providing signs and a flag person(s) as necessary for safety at access points to public rights-of-way, barriers and lane closures.

2. The contractor shall comply with the Town’s traffic requirements for the site. Where possible, one lane shall remain open.

3. The contractor shall comply with the provisions of applicable permits issued by State, County or Municipal Units for work to be performed from or within public rights-of-way.

4. The contractor shall notify the Town two (2) days prior to the start of construction.

The Town shall contact school district(s), local fire department(s), and emergency squad personnel for notification of limited road access.

5. Any material which falls from any hauling or construction equipment will be cleaned up on at least a daily basis and more often if needed to prevent a safety hazard.

6. In Section 6, Measurement and Payment, no separate payment shall be made for traffic control, all traffic control activities shall be paid under the contract lump sum price for Bid Item 1 UMobilization and Demobilization.

NY–TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS009-3

Construction Specification 11—Removal of Water

The work consists of the removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It shall include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required.

2. Diverting surface water The contractor shall install, maintain, and operate all cofferdams, channels, flumes, sumps, and all other temporary diversion and protective works needed to divert streamflow and other surface water through or around the construction site. Control of surface water shall be continuous during the period that damage to construction work could occur. Unless otherwise specified and/or approved, the diversion outlet shall be into the same drainageway that the water would have reached before being diverted.

The contractor shall furnish the contracting officer, in writing, a proposed plan for diverting surface water before beginning any construction activities for which a diversion is required, unless waived in section 8 of this specification. Acceptance of this plan or the waiving of the plan requirement will not relieve the contractor of the responsibilities related to this activity during the process of completing the work as specified.

3. Dewatering the construction site Foundations, cutoff trenches, and all other parts of the construction site shall be dewatered and kept free of standing water and muddy conditions as necessary for the proper execution of the work. The contractor shall furnish, install, operate, and maintain all drains, sumps, pumps, casings, well points, and all other equipment required to properly dewater the site as specified.

Dewatering systems that cause a loss of soil fines from the foundation areas will not be permitted.

The contractor shall furnish the contracting officer, in writing, a proposed plan for dewatering before commencing with any construction activity for which dewatering may be required, unless waived in section 8 of this specification. Acceptance of this plan or the waiving of the plan requirement will not relieve the contractor of the responsibilities for completing the specified work.

4. Dewatering borrow areas The contractor shall maintain all borrow areas free of surface water or otherwise provide for timely and effective removal of surface and subsurface water that accumulates within the borrow area, unless waived in section 8 of this specification. Borrow material shall be processed as necessary to achieve proper and uniform moisture content at the time of placement.

If pumping to dewater borrow areas is included as a bid item of work in the bid schedule, each pump discharge pipe shall be equipped with a water meter. The meter shall be such that the measured quantity of water is accurate within 3 percent of the true quantity. The contractor shall provide necessary support to perform accuracy tests of the water meter when requested by the contracting officer.

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS-011-1

5. Erosion and pollution control Removal of water from the construction site, including the borrow areas, shall be accomplished so that erosion and the transporting of sediment and other pollutants are minimized. Dewatering activities shall be accomplished in a manner that the water table water quality is not altered.

Pollution control activities shall not conflict with the requirements of Construction Specification 5, Pollution Control, if it is a part of this contract.

6. Removal of temporary works When temporary works are no longer needed, the contractor shall remove and return the area to a condition similar to that which existed before construction. Areas where temporary works were located shall be graded for sightly appearance with no obstruction to natural surface waterflows or the proper functioning and access to the works of improvement installed. The contractor shall exercise extreme care during the removal stages to minimize the loss of soil sediment and debris that was trapped during construction.

Pipes, casings, and any other material used to dewater the site shall be removed from temporary wells. The wells shall be filled to ground level with clean gravel or other suitable material approved by the contracting officer. The contractor shall exercise extreme care to prevent pollution of the ground water by these actions.

7. Measurement and payment Method 1—Items of work listed in the bid schedule for removal of water, diverting surface water, and dewatering construction sites and borrow areas are paid for at the contract lump sum prices. Such payment will constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.

Method 2—Items of work listed in the bid schedule for removal of water, diverting surface water, dewatering construction sites, and dewatering borrow areas are paid for at the contract lump sum prices. Such payment will constitute full compensation for furnishing, installing, operating, and maintaining the necessary trenches, drains, sumps, pumps, and piping and for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work. The exception is that additional payment for pumping to dewater borrow areas and the removal of water will be made as described in the following paragraph.

If pumping to dewater borrow areas is a contract bid item, payment is made at the contract unit price, which shall be the price per 1,000 gallons shown in the bid schedule. Such payment will constitute full compensation for pumping only. Compensation for equipment and preparation and for other costs associated with pumping is included in the lump sum payment for removal of water or the lump sum payment for dewatering the borrow areas. Payment is made only for pumping that is necessary to dewater borrow areas that cannot be effectively drained by gravity or that must have the water table lowered to be usable as a suitable borrow source. Pumping for other purposes will not be included for payment under this item.

All Methods—The following provisions apply to all methods of measurement and payment.

Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the contract line item to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 8 of this specification.

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS-011-2

8. Items of work and construction details

A. Bid Item 2, Removal of Water.

1. This item includes all of the work necessary to remove water from the rock toe excavation and diverting the stream flow from the construction operations.

2. Equipment operation in flowing water is prohibited unless specifically authorized.

3. Any water discharged from a pumping operation that contains sediment shall not be discharged directly into the stream. It shall be discharged to a grassed area in the staging area prior to being redirected to the stream, such that no discoloration occurs downstream.

4. In Section 7, Measurement and Payment, Method 1 shall apply.

5. Items of work subsidiary to this Bid Item are:

a. Pollution Control – Construction Specification 5

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS-011-3

Construction Specification 5—Pollution Control

The work consists of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.

2. Material All material furnished shall meet the requirements of the material specifications listed in section 8 of this specification.

3. Erosion and sediment control measures and works The measures and works shall include, but are not limited to, the following:

Staging of earthwork activities—The excavation and moving of soil materials shall be scheduled to minimize the size of areas disturbed and unprotected from erosion for the shortest reasonable time.

Seeding—Seeding to protect disturbed areas shall occur as soon as reasonably possible following completion of that earthwork activity.

Mulching—Mulching to provide temporary protection of the soil surface from erosion.

Diversions—Diversions to divert water from work areas and to collect water from work areas for treatment and safe disposition. They are temporary and shall be removed and the area restored to its near original condition when the diversions are no longer required or when permanent measures are installed.

Stream crossings—Culverts or bridges where equipment must cross streams. They are temporary and shall be removed and the area restored to its near original condition when the crossings are no longer required or when permanent measures are installed.

Sediment basins—Sediment basins collect, settle, and eliminate sediment from eroding areas from impacting properties and streams below the construction site(s). These basins are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.

Sediment filters—Straw bale filters or geotextile sediment fences trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under or around them. These filters are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.

Waterways—Waterways for the safe disposal of runoff from fields, diversions, and other structures or measures. These works are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.

Other—Additional protection measures as specified in section 8 of this specification or required by Federal, State, or local government.

4. Chemical pollution

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS-005-1

The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to dispose of chemical pollutants, such as drained lubricating or transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a by-product of the construction activities. At the completion of the construction work, sumps shall be removed and the area restored to its original condition as specified in section 8 of this specification. Sump removal shall be conducted without causing pollution.

Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source. At the completion of construction activities, facilities shall be disposed of without causing pollution as specified in section 8 of this specification.

5. Air pollution The burning of brush or slash and the disposal of other materials shall adhere to state and local regulations.

Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained at locations shown on the drawings.

All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application.

6. Maintenance, removal, and restoration All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed and the site restored to near original condition.

7. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each item is measured to the nearest unit applicable. Payment for each item is made at the contract unit price for that item. For water or chemical suppressant items used for dust control for which items of work are established in section 8 of this specification, measurement for payment will not include water or chemical suppressants that are used inappropriately or excessive to need. Such payment will constitute full compensation for the completion of the work.

Method 2—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds and supported by invoices presented by the contractor that reflect actual costs. If the total of all progress payments is less than the lump sum contract price for this item, the balance remaining for this item will be included in the final contract payment. Payment of the lump sum contract price will constitute full compensation for completion of the work.

Method 3—For items of work for which lump sum prices are established in the contract, payment will be prorated and provided in equal amounts on each monthly progress payment estimate. The number of months used for prorating shall be the number estimated to complete the work as outlined in the

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS-005-2

contractor's approved construction schedule. The final month's prorate amount will be provided with the final contract payment. Payment as described will constitute full compensation for completion of the work.

All Methods—The following provisions apply to all methods of measurement and payment.

Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items, and the items to which they are made subsidiary, are identified in section 8 of this specification.

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS-005-3

Items of work to be performed in conformance with this specification and construction details are:

A. Subsidiary Item, Pollution Control

1. All construction of BMP’s should take place during dry conditions. If possible, schedule construction of BMP’s sensitive to erosion around storm events.

2. This item shall consist of applying and performing all construction activities in a manner that will minimize water pollution, air pollution, and soil erosion. It shall include maintenance and installation of the following:

a. Sediment basins to receive outflows from pumps used to remove water.

b. Diversions and/or coffer dams.

3. Special precautions shall be taken in the scheduling and use of construction equipment to minimize erosion. The crossing of live streams by fording will not permitted. Temporary stream crossing such as culverts or bridges shall be installed and maintained as necessary, to allow equipment to cross without entering the stream.

4. Stabilized construction entrances shall be maintained in a condition that will prevent tracking or flowing of sediment onto public right-of-ways, including cleanout and paving with additional stone as conditions demand. All sediment spilled, dropped, washed, or tracked onto public right-of-ways shall be removed immediately.

5. Excavation and Clearing operations shall not be started until pollution control measures are in place to control runoff and the sediment from respective work area.

6. Filter fabric barriers, silt fencing, or other methods to control erosion are to be used on the downslope edge of any disturbed areas. These erosion/sediment controls are to be put in place before any disturbance of the ground occurs and are to be maintained in good working order. Said structures must remain “in place” in good working order throughout construction and shall remain until final grading has been completed and final seeding has been established.

7. All unused, excavated materials and/or construction debris shall be removed from the site upon completion of construction to the disposal site designated by the sponsor.

8. There shall be no discharge of sediment or turbid waters to wetlands or water bodies. In the case of stream work, the water below the work area shall remain as clear as the flowing water above the work site.

9. Equipment operation in the water is prohibited unless specifically authorized.

10. Disturbance to the bed and banks of the stream shall be kept to the minimum necessary to complete the project.

11. Follow all provisions of NYS DEC and Army Corp of Engineers Stream Permits, as applicable.

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS-005-4

12. In Section 4, Chemical Pollution, a sump shall not be used for disposing of chemical pollutants.

13. In Section 5, Air Pollution, burning of any material shall not be permitted.

14. Stockpiles of fill and/or topsoil that are to be stored in excess of 14 days shall be protected from wind and water erosion by mulching, sprinkling, seeding, straw bale diking, or covering with polyethylene (plastic) sheeting. If sheeting is used it shall be anchored with rocks, gravel, or staking to prevent its accidental removal.

15. Geotextile for silt fence shall conform to the requirements of Material Specification 592 –

Geotextile

16. In Section 7, Measurement and Payment, no separate payment shall be made for Pollution

Control, all Pollution Control activities shall be paid under the contract lump sum price for Bid Item 2 Removal of Water.

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS-005-5

Construction Specification 4—Channel Clearing and Shaping

The work consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish, and the shaping of the channel.

2. Protection of existing vegetation Trees and other vegetation designated to remain undisturbed shall be protected from damage throughout the duration of the construction period. Any damages resulting from the contractor's operations or neglect shall be repaired by the contractor.

Earthfill, stockpiling of materials, vehicle or equipment parking, and excessive foot or vehicle traffic shall not be allowed within the drip line of vegetation designated to remain in place.

Vegetation damaged by any of these or similar actions shall be replaced with viable vegetation of the same species, similar condition, and like size unless otherwise approved by the contracting officer.

Any cuts, skins, scrapes, or bruises to the bark of the vegetation shall be carefully trimmed and local nursery accepted procedures used to seal damaged bark.

Any limbs or branches 0.5 inch or larger in diameter that are broken, severed, or otherwise seriously damaged during construction shall be cut off at the base of the damaged limb or branch flush with the adjacent limb or tree trunk.

All roots 1 inch or larger in diameter that are cut, broken, or otherwise severed during channel shaping shall have the end smoothly cut perpendicular to the root. Roots exposed during channel shaping operations shall be covered with moist soil as soon as possible to prevent roots from drying out.

3. Marking The limits of the area(s) to be cleared and shaped are marked by stakes, flags, paint, tree markings, or other suitable methods or as specified in section 8 of this specification, or they will be shown on the drawings. Trees to remain standing, undisturbed, and uninjured are designated by special markings.

4. Clearing Trees and other vegetation marked for clearing shall be cut off as near the ground surface as conventional tools and equipment normally permit. All trees not marked for preservation and all snags, logs, brush, shrubs, stumps, and rubbish shall be cleared from within the area limits identified.

5. Disposal All woody material, vegetation, and rubbish resulting from clearing from designated areas shall be disposed of at the locations and in a manner shown on the drawings, or as specified in section 8 of this specification.

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS-004-1

6. Shaping The channel bottom and side slopes shall be shaped as shown on the drawings. The resulting shaped channel surface shall be reasonably smooth. Material excavated during the channel shaping operation shall be removed from the channel and disposed of as specified in section 8 of this specification.

7. Measurement and payment Method 1—For items of work for which specific unit prices are established by the contract, the designated cleared and shaped area is measured and the area determined to the nearest 0.1 acre.

Payment for clearing and shaping is made at the contract unit price for the item and shall constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the satisfactory completion of the work.

Method 2—For items of work for which specific unit prices are established by the contract, the length of the cleared and shaped channel designated is measured to the nearest 100 feet. Payment for clearing and shaping is made at the contract unit price for the item and shall constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the satisfactory performance of the work.

Method 3—For items of work for which specific unit prices are established by the contract, the cleared and shaped area(s) is measured and the area determined to the nearest 0.1 acre. The designated cleared and shaped area(s) is determined from the measured width at representative sections and the distance between the sections. Payment for clearing and shaping is made at the contract unit price for the item and shall constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the satisfactory completion of the work.

Method 4—For items of work for which specific lump sum prices are established by the contract, the extent of clearing and shaping is not measured or determined for payment. Payment for clearing and shaping is made at the contract lump sum price for the item and shall constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the satisfactory completion of the work.

All Methods—The following provisions apply to all methods of measurement and payment.

Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and items to which they have been made subsidiary are identified in section 8 of this specification.

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS-004-2

Construction Specification 4 - Channel Clearing and Shaping

Items of work to be performed in conformance with this specification and construction

A. Bid Item 3, Channel Clearing and Shaping

1. This item shall consist of removal and disposal of trees, root wads, other vegetation, and refuse from the stream channel and subsequent removal from the site.

2. The trees shall be identified by flagging in the field by NRCS personnel.

3. No live or standing trees are to be removed from the site other than those identified and flagged in the field by NRCS personnel.

4. In Section 5, Disposal, miscellaneous farm implements, tires, and other refuse shall be disposed of at a legal disposal site or salvage yard. The contractor shall identify the disposal location.

5. Logs shall be removed and disposed of as in Section 5 or to a site designated by the sponsor. Tops and other excised woody material shall be disposed of as above or chipped on site. No burning of material onsite shall be allowed.

6. Large rocks shall be stockpiled on site for possible later use in the reconstructed streambank.

7. Gravel removed from the streambed may be reused as fill to shape the streambanks in preparation for the riprap or to fill the areas west of the sloped rock riprap. The remaining streambed shall be graded to a uniform slope – no potholes or gravel dams shall be allowed to remain.

8. In Section 7, Measurement and Payment, Method 4 shall apply. A single lump sum payment shall be made for the movement and removal of all indicated debris.

NY – TOWN OF NICHOLS – SACKETT CREEK NRCS-NEH-20 CS-004-3

(210-VI-NEH, May 2001) 95–1

Construction Specification 95—Geotextile

1. Scope This work consists of furnishing all material, equipment, and labor necessary for the installation of geotextiles.

2. Quality Geotextiles shall conform to the requirements of Material Specification 592 and this specification.

3. Storage Before use, the geotextile shall be stored in a clean, dry location out of direct sunlight, not subject to extremes of either hot or cold temperatures, and with the manufacturer's protective cover undisturbed.

Receiving, storage, and handling at the job site shall be in accordance with the requirements listed in

ASTM D 4873.

4. Surface preparation The surface on which the geotextile is to be placed shall be graded to the neat lines and grades as shown on the drawings. It shall be reasonably smooth and free of loose rock and clods, holes, depressions, projections, muddy conditions, and standing or flowing water (unless otherwise specified in section 7 of this specification).

5. Placement Before the geotextile is placed, the soil surface will be reviewed for quality assurance of the design and construction. The geotextile shall be placed on the approved prepared surface at the locations and in accordance with the details shown on the drawings and specified in section 7 of this specification. It shall be unrolled along the placement area and loosely laid, without stretching, in such a manner that it conforms to the surface irregularities when material or gabions are placed on or against it. The geotextile may be folded and overlapped to permit proper placement in designated area(s).

Method 1—The geotextile shall be joined by machine sewing using thread material meeting the chemi-cal requirements for the geotextile fibers or yarn. The sewn overlap shall be 6 inches, and the sewing shall consist of two parallel stitched rows at a spacing of about 1 inch and shall not cross (except for any required re-stitching). The stitching shall be a lock-type stitch. Each row of stitching shall be located a minimum of 2 inches from the geotextile edge. The seam type and sewing machine to be used shall pro-duce a seam strength, in the specified geotextile, that provides a minimum of 90 percent of the tensile strength in the weakest principal direction of the geotextile being used, when tested in accordance with ASTM D 4884. The seams may be factory or field sewn.

The geotextile shall be temporarily secured during placement of overlying material to prevent slippage, folding, wrinkling, or other displacement of the geotextile. Unless otherwise specified, methods of secur-ing shall not cause punctures, tears, or other openings to be formed in the geotextile.

Method 2—The geotextile shall be joined by overlapping a minimum of 18 inches (unless otherwise specified) and secured against the underlying foundation material. Securing pins, approved and provided by the geotextile manufacturer, shall be placed along the edge of the panel or roll material to adequately hold it in place during installation. Pins shall be steel or fiberglass formed as a U, L, or T shape or con-tain "ears" to prevent total penetration through the geotextile. Steel washers shall be provided on all but the U-shaped pins. The upstream or upslope geotextile shall overlap the abutting downslope geotextile.

At vertical laps, securing pins shall be inserted through the bottom layers along a line through approxi-mately the mid-point of the overlap. At horizontal laps and across slope labs, securing shall be inserted

(210-VI-NEH, May 2001) through the bottom layer only. Securing pins shall be placed along a line about 2 inches in from the edge of the placed geotextile at intervals not to exceed 12 feet unless otherwise specified. Additional pins shall be installed as necessary and where appropriate to prevent any undue slippage or movement of the geotextile. The use of securing pins will be held to the minimum necessary. Pins are to remain in place unless otherwise specified.

Should the geotextile be torn or punctured, or the overlaps or sewn joint disturbed, as evidenced by visible geotextile damage, subgrade pumping, intrusion, or grade distortion, the backfill around the damaged or displaced area shall be removed and restored to the original approved condition. The repair shall consist of a patch of the same type of geotextile being used and overlaying the existing geotextile.

When the geotextile seams are required to be sewn, the overlay patch shall extend a minimum of 1 foot beyond the edge of any damaged area and joined by sewing as required for the original geotextile except that the sewing shall be a minimum of 6 inches from the edge of the damaged geotextile. Geotextile panels joined by overlap shall have the patch extend a minimum of 2 feet from the edge of any damaged area.

Geotextile shall be placed in accordance with the following applicable specification according to the use indicated in section 7:

Slope protection—The geotextile shall not be placed until it can be anchored and protected with the specified covering within 48 hours or protected from exposure to ultraviolet light. In no case shall material be dropped on uncovered geotextile from a height of more than 3 feet.

Subsurface drains—The geotextile shall not be placed until drainfill or other material can be used to provide cover within the same working day. Drainfill material shall be placed in a manner that prevents damage to the geotextile. In no case shall material be dropped on uncov-ered geotextile from a height of more than 5 feet.

Road stabilization—The geotextile shall be unrolled in a direction parallel to the roadway centerline in a loose manner permitting conformation to the surface irregularities when the roadway fill material is placed on its surface. In no case shall material be dropped on uncov-ered geotextile from a height of more than 5 feet. Unless otherwise specified, the minimum overlap of geotextile panels joined without sewing shall be 24 inches. The geotextile may be temporarily secured with pins recommended or provided by the manufacturer, but they shall be removed before the permanent covering material is placed.

6. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, the quantity of geotextile for each type placed within the specified limits is determined to the nearest specified unit by measurements of the covered surfaces only, disregarding that required for anchorage, seams, and overlaps. Payment is made at the contract unit price. Such payment constitutes full compensation for the completion of the work.

Method 2—For items of work for which specific unit prices are established in the contract, the quantity of geotextile for each type placed with the specified limits is determined to the nearest specified unit by computing the area of the actual roll size or partial roll size installed. The computed area will include the amount required for overlap, seams, and anchorage as specified. Payment is made at the contract unit price. Such payment constitutes full compensation for the completion of the work.

Method 3—For items of work for which specific lump sum prices are established in the contract, the quantity of geotextile is not measured for payment. Payment for geotextiles is made at the contract lump sum price and constitutes full compensation for the completion of the work.

95–2

All methods—The following provisions apply to all methods of measurement and payment. Compensa-tion for any item of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 7 of this specification.

95–3

This item includes furnishing all materials, equipment, and labor necessary for the proper installation of the geotextile material as indicated on the drawings.

A. Bid Item 4, Geotextile – sloped rock riprap, toe rock, and stream barb

1. Section 2, Quality - The geotextile fabric shall be Non-Woven, Class II in accordance with NRCS Material Specification 592 – Geotextile Table 592-2.

2. Section 5, Placement - Placement shall be for road stabilization with the exception that rocks may not be dropped onto uncovered geotextile material from a height greater than two

(2) feet.

3. In Section 6, Measurement and Payment, Method 1 shall apply.

NY-TOWN OF NICHOLS - SACKETT CREEK NRCS-NEH-20 CS095-4

Chapter 3 National Standard Material Specifications Part 642 National Engineering Handbook

(210-VI-NEH, May 2011) 592–1

Material Specification 592—Geotextile

1. Scope This specification covers the quality of geotextile, including geotextile for temporary silt fence.

2. General requirements Fibers (threads and yarns) used in the manufacture of geotextile shall consist of synthetic polymers composed of a minimum of 85 percent by weight polypropylenes, polyesters, polyamides, polyethylene, polyolefins, or polyvinylidene-chlorides. They shall be formed into a stable network of filaments or yarns retaining dimensional stability relative to each other. The geotextile shall be free of defects, such as holes, tears, and abrasions. The geotextile shall be free of any chemical treatment or coating that significantly reduces its porosity. Fibers shall contain stabilizers and/or inhibitors to enhance resistance to ultraviolet light. Geotextile other than for temporary silt fence shall conform to the requirements in tables 592–1 or 592–2, as applicable. Geotextile for temporary silt fence shall conform to the requirements in table 592–3.

Thread used for factory or field sewing shall be of contrasting color to the fabric and made of high strength polypropylene, polyester, or polyamide thread. Thread shall be as resistant to ultraviolet light as the geotextile being sewn.

3. Classification Geotextiles shall be classified based on the method used to place the threads or yarns forming the fabric. The geotextiles will be grouped into woven and nonwoven types. Geotextile for temporary silt fence may be either woven or nonwoven. Slit film woven geotextile may not be used except for temporary silt fence.

Woven—Fabrics formed by the uniform and regular interweaving of the threads or yarns in two directions. Woven fabrics shall be manufactured from monofilament yarn formed into a uniform pattern with distinct and measurable openings, retaining their position relative to each other. The edges of fabric shall be selvedged or otherwise finished to prevent the outer yarn from unraveling.

Nonwoven—Fabrics formed by a random placement of threads in a mat and bonded by needle punching, heat-bonding, or resin-bonding. Nonwoven fabrics shall be manufactured from individual fibers formed into a random pattern with distinct, but variable small openings, retaining their position relative to each other when bonded by needle punching, heat-, or resin-bonding. The use of heat- or resin-bonded nonwovens is restricted as specified in note 2 of table 592–2.

4. Sampling and testing The geotextile shall meet the specified requirements (tables 592–1, 592–2, or 592-3, as applicable) for the product type shown on the label. Product properties as listed in the latest edition of the "Specifiers Guide," Geosynthetics, (Industrial Fabrics Association International, 1801 County Road B, West Roseville, MN 55113-4061 or at http://www.geosindex.com) and that represent minimum average roll values, are acceptable documentation that the product style meets the requirements of these specifications.

For products that do not appear in the above directory or do not have minimum average roll values listed, typical test data from the identified production run of the geotextile will be required for each of the specified tests (see table 592–1, 592–2, or 592-3, as applicable) as covered under clause AGAR 452.236-76.

5. Shipping and storage The geotextile shall be shipped/transported in rolls wrapped with a cover for protection from moisture, dust, dirt, debris, and ultraviolet light. The cover shall be maintained undisturbed to the maximum extend possible before placement.

Each roll of geotextile shall be labeled or tagged to clearly identify the brand, class, and the individual production run in accordance with ASTM D 4873.

(210-VI-NEH, May 2011) 592–2

Table 592–1 Requirements for woven geotextiles 1/

Property Test Method Units Class I Class II Class III Class IV Grab Tensile Strength ASTM D 4632 pounds

247 min. 180 min. 180 min. 315 min.

Elongation at Failure ASTM D 4632 percent

< 50 <50 <50 <50

Trapezoidal Tear Strength ASTM D 4533 pounds

90 min. 67 min. 67 min. 112 min.

Puncture Strength ASTM D 6241 pounds

495 min. 371 min. 371 min. 618 min.

Ultraviolet Stability (retained strength)

ASTM D 4355 percent

50 min. 50 min. 50 min. 50 min.

Permittivity ASTM D 4491 sec-1

0.7 min. or as specified

Apparent Opening Size

(AOS) 2/

ASTM D 4751 mm 0.22 max. or as specified

Percent Open Area (POA) USACE

CWO-02215

percent 4 min.

1/ All values are minimum average roll values (MARV) in the weakest principal direction, unless otherwise noted.

2/ Maximum average roll value.

Note: CWO is a USACE reference.

Table 592–2 Requirements for nonwoven geotextiles 1/

Property Test Method Units Class I 2/ Class II 2/ Class III 2/ Class IV 2/ Grab Tensile Strength ASTM D 4632 pounds

202 min. 157 min. 112 min. 202 min.

Elongation at Failure ASTM D 4632 percent

Trapezoidal Tear Strength ASTM D 4533 pounds

79 min. 56 min. 40 min. 79 min.

Puncture Strength ASTM D 6241 pounds

433 min. 309 min. 223 min. 433 min.

Ultraviolet Stability (retained strength)

ASTM D 4355 percent

0.7 min. or as specified

Apparent Opening Size

(AOS) 3/

ASTM D 4751 mm 0.22 max. or as specified

1/ All values are minimum average roll values (MARV) in the weakest principal direction, unless otherwise noted.

2/ Needle punched geotextiles may be used for all classes. Heat-bonded or resin-bonded geotextiles may be used for classes III and IV only . They are particularly well suited to class IV.

3/ Maximum average roll value.

(210-VI-NEH, May 2011) 592–3

Table 592-3 Requirements for Temporary Silt Fence 1/

Property

Test Method

Units

Requirements, Supported Silt Fence 2/

Requirements, Unsupported Silt Fence 2/

Woven Geotextile (Elongation < 50% 3/)

Nonwoven Geotextile (Elongation > 50% 3/)

Maximum Post Spacing ft

4 6.5 4

Grab Tensile Strength: ASTM D 4632 pounds

Machine Direction

90 124

X-Machine Direction

90 101

0.05 0.05

Apparent Opening Size (AOS) 4/

ASTM D 4751 mm 0.60 0.60

Ultraviolet Stability (retained strength)

ASTM D 4335 % 70% after 500 hours of exposure

70% after 500 hours of exposure

1/ All values are minimum average roll values (MARV) in the weakest principal direction, unless otherwise noted.

2/ Silt fence support shall consist of 14-gage steel wire with a mesh spacing of 6 inches each way or prefabricated polymeric mesh of equivalent strength.

3/ As measured in accordance with ASTM D 4632.

4/ Maximum average roll value.

Construction Specification 21—Excavation

The work shall consist of the excavation required by the drawings and specifications and disposal of the excavated materials.

2. Classification Excavation is classified as common excavation, rock excavation, or unclassified excavation in accordance with the following definitions.

Common excavation is defined as the excavation of all materials that can be excavated, transported, and unloaded using heavy ripping equipment and wheel tractor-scrapers with pusher tractors or that can be excavated and dumped into place or loaded onto hauling equipment by excavators having a rated capacity of one cubic yard or larger and equipped with attachments (shovel, bucket, backhoe, dragline, or clam shell) appropriate to the material type, character, and nature of the materials.

Rock excavation is defined as the excavation of all hard, compacted, or cemented materials that require blasting or the use of ripping and excavating equipment larger than defined for common excavation. The excavation and removal of isolated boulders or rock fragments larger than 1 cubic yard encountered in materials otherwise conforming to the definition of common excavation shall be classified as rock excavation. The presence of isolated boulders or rock fragments larger than 1 cubic yard is not in itself sufficient cause to change the classification of the surrounding material.

For the purpose of these classifications, the following…