SOLICITATION, OFFER,

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED

AND AWARD [gj SEALED BID (/FB)

(Construction, Alteration, or Repair) AG-2846-S-16-0008

D NEGOTIATED (RFP)

07/22/2016

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER , 6. PROJECT NUMBER

TBD

7. ISSUED BY

NRCS - HQ - 122846

USDA-NRCS Contracting Team 2

1400 Independence Avenue, SW

Room 6801-S

Washington, DC 20250

803895

CODE 8. ADDRESS OFFER TO

NRCS-HQ-122846

USDA-NRCS Contracting Team 2

Attn: Scott Crist

6013 Lakeside Blvd

Indianapolis, IN 46278

PAGE OF

9. FOR INFORMATION I a. NAME CALL: ~ Scott A. Crist I

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

317-295-5830

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

PAGES

USDA, Natural Resources Conservation SeNice is planning to improve the drainage (Main Drainage Channel, Pump Station and Flood Levee (leak repair)) and irrigation around the Plant Materials Center located - Lafourche Parish in Galliano, Louisiana. The job consists of the following tasks.

• Mobilization and de-mobilization

• Excavation

• Earthfill

• Vegetative seeding, fertilization and mulching

• Removal of water

• Installation of water control gates

• Timber fabrication and installation

• Concrete structure creation

• Construction surveys

11. The contractor shall begin performance within 10 calendar days and complete it within _ _;;_3.;;;.5 __ calendar days after receiving

D award, [g] notice to proceed. This performance period is [g] mandatory D negotiable. (See ------------ ).

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

DYES 0No

13. ADDITIONAL SOLICITATION REQUIREMENTS:

12b. CALENDAR DAYS

a. Sealed offers in original and e-mail copies to perform the work required are due at the place specified in Item 8 by 2 p.m. EDT (hour) local time August 22, 2016 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offerer's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee [g] is, D is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than __ 6"-0'---- calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA- FAR (48 CFR) 53.236-1(d)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offerer agrees to perform the work required at the pnces specified below in strict accordance with the terms of this solicitation, 1f this offer 1s accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

AMOUNTS~

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DA TE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ~!ITEM

(4 copies unless otherwise specified)

26. ADMINISTERED BY

NRCS-HQ-122846

USDA-NRCS Contracting Team 2 Attn: Scott Crist

1122846

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

D 10 U.S.C. 2304(c) ( 0 41 U.S.C. 3304(a) (

27. PAYMENT WILL BE MADE BY

NRCS

Louisiana

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

0 28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and retum copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

30b. SIGNATURE 30c. DATE

0 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

31a. NAME OF CONTRACTING OFFICER (Type or print)

31c. DATE

07/22/2016

STANDARD FORM 1442 (REV. 812014) BACK