Attachment_2_-_Contract_Errata_Sheet.pdf
PDF 62 KB Posted
- Solicitation number
- AG-2B46-S-16-0006
About this file
Attach 2 - Contract Errata Sheet
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2
1. Construction Drawings/Layout
2. Vicinity Map
3. Contract Errata Sheet
Construction Specifications:
1. Throughout – Construction specifications refer to Contract Officer Representative and/or COTR this shall be changed to Contract Officer Technical Representative – Project Engineer.
2. Updated ASTM D2487 has changed terminology. Throughout the specifications and drawings the word “mineral soil” shall be replaced with “inorganic soil” as defined in ASTM D 2487-11.
File details come from the government source that posted it. Updated .