12_NORTH_PATHWAY_STA_0 00.00_TO_5 30.00_REV_5.pdf
PDF 417 KB Posted
- Solicitation number
- AG-2B46-S-16-0006
About this file
This page 12 supersedes and replaces one previously uploaded due to some systematic issues experienced when downloading.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
North Pathway 0+00.00-5+30.00
-175:1
Horizontal
GRADE BREAK STA = 0+49.66
ELEV = 49.32
G R
A D
E
B
R E
A K
S
T
E L E
V
START: NORTH PATHWAY CONSTRUCTION
CONTRACTOR TO GRADE ROAD TO ELE.: 48.75.
(SEE TYPICAL CROSS SECTION SHEET 49)
PROPOSED GRADE
EXISTING GRADE
2 @ 36" AASHTO M 294 TYPE S
50.0 L.F.
INV. IN. 43.29
INV. OUT. 43.24
2 @ 60" AASHTO M 294 TYPE S
54.0 L.F.
INV. IN. 41.36
INV. OUT. 41.31
CONTRACTOR SHALL FILL
60" PIPES WITH ONE (1) FT. OF
COMPACTED SUITABLE FILL MATERIAL
L
O
D
L
O
D
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
L
O
D
L
O
D
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
W
R
P
P C
P C
P C
P C
P T
P T
P T
P T
N
S
L
S
L
L
C
L52
C40
C46
C49
C50
0+00
1+00 2+00
3+00
4+00
5+00
S H
E E
T
M A
T C
H L I N
E
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
DATE:
PROJ:
DWG:
VERIFY SCALE
SCALE AS SHOWN
W E
T L
A N
D
R
E S
E R
V E
P
R O
G R
A M
HORIZONTAL SCALE: 1" = 20'
20100 40 60
V E
R T
I C
A L
S
C A
L E
1.0
2.0
4.0
6.0
PLAN VIEW
(1" = 20' HORIZ.)
PROFILE VIEW
(1" = 20' HORIZ., 1" = 2.0' VERT.)
T I L
L E
R Y
N O
R T
H
P
A T
H W
Y
S
T
T
O
CN-101
SHEET: of 59
Value
N a t u r a l
R e s o u r c e s
C o n s e r v a t i o n
S e r v i c e
U n i t e d
S t a t e s
D e p a r t m e n t o f
A g r i c u l t u r e
PROPOSED NORTH PATHWAY
IMPROVEMENTS
APPROXIMATE WRE
EASEMENT BOUNDARY
PROPOSED NORTH STREAM
(SEE SHEETS 05 - 11)
PROPOSED LOD
(SEE SHEET 03) FOR
OVERALL LOD LOCATION
2 @ 36" AASHTO M 294 TYPE S
50.0 L.F.
INV. IN. 43.29
INV. OUT. 43.24
(SEE SHEET 08)
2 @ 60" AASHTO M 294 TYPE S
54.0 L.F.
INV. IN. 41.36
INV. OUT. 41.31
(SEE SHEET 08)
GENERAL NOTES
1. CONTRACTOR SHALL STOCK PILE EXCESS SPOIL MATERIAL IN
SPOIL PILE AREAS AS SHOWN ON PLAN SHEETS.
2. CONTRACTOR SHALL ADHERE TO ALL SEDIMENT AND EROSION
CONTROL PRACTICES AS SPECIFIED WITHIN THIS CONTRACT.
3. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS
BETWEEN PROPOSED AND EXISTING GRADE.
4. CONTRACTOR SHALL FILL OLD FIELD DITCHES AS SHOWN ON
PLAN SHEETS AND PROVIDE A SMOOTH TRANSITION TO
PROPOSED GRADE. CONTRACTOR SHALL ENSURE THAT THE
FILL SECTIONS OF THE OLD FIELD DITCHES ARE COMPACTED IN
ACCORDANCE WITH THE CONSTRUCTION SPECIFICATIONS.
SHIELDS ROAD
CONTRACTOR SHALL INSTALL
CONSTRUCTION ENTRANCE
(SEE DETAIL SHEET 54)
REMOVE AND DISPOSE
OF EXISTING PIPE
AND HEADWALL
ISSUED FOR CONSTRUCTION 06/28/2016 REV 4
D S
G N
D
R
C H
K
A P
V D
D
A T
E
N o
D E
S C
R I P
T I O
N A
P V
D B
Y D
A T
E
J D
H J D
H S
D L
T L R
J D
H
I S
S U
D
F
O
B
I
C
O N
S T
R U
C T
I O
N
J D
H
R e v
I S
S E
D
F
N
S T
R U
C T
I O
N
J D
H
R e v
I S
S U
F
N
S T
R U
C T
I O
N
J D
H
R e v
I S
S E
D
F
N
S T
R U
C T
I O
N
J D
H
R e v
I S
S E
D
F
N
S T
R U
C T
I O
N
J D
H
File details come from the government source that posted it. Updated .