Project Details_Drawings.pdf

PDF 2 MB Posted

Attached to
Forest Road 58 Reconstruction on the Green Mountain NF
Solicitation number
AG-24H8-S-12-0039
Issued by

About this file

Drawings

View the file

Other files

File Type Posted
Amendment1.rtf RTF text file
VT35.pdf PDF
SubmissionPackage.doc DOC document
SupplementalSpecifications.docx DOCX document
SolicitationPackage.doc DOC document
sf24 bid bond form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FR58 Staples Brook

Road Reconstruction

Project Details

Disaster No. VT2011-1-FS

DSR No. GM-58-1

Table of Contents:

Sheet Number: Title:

1: Cover Sheet

2 – 3: General Notes

4: Work List

5: Site Location Map

6: Photos

7: Roadway Details

8: Erosion Control

GENERAL NOTES:

1. THE PROJECT WORK SHALL GENERALLY INCLUDE, BUT IS NOT LIMITED TO, FILLING AND

SHAPING THE ROAD, REMOVING AND REPLACING CULVERTS, CLEANING CULVERTS, CLEANING

DITCHES, AND SURFACING AND GRADING THE ROAD.

2. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S

OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE

CONTRACTOR'S EXPENSE.

3. ALL WASTE MATERIAL, INCLUDING UNUSED EXCAVATED MATERIAL, SHALL BECOME THE

PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF OFF U.S. GOVERNMENT

(NATIONAL FOREST) LAND AT AN APPROVED LOCATION. THERE ARE NO GOVERNMENT

DISPOSAL SITES OR PITS.

4. ALL SOIL MOVING EQUIPMENT SHALL BE THOROUGHLY CLEANED TO MAKE IT FREE OF SOIL, NON-NATIVE INVASIVE SPECIES OF OTHER DEBRIS THAT COULD CONTAIN OR HOLD SEEDS PRIOR

TO BEING DELIVERED TO THE PROJECT SITE. EQUIPMENTS SHALL BE CONSIDERED FREE OF

NON-NATIVE OR INVASIVE SPECIES AND OTHER SUCH DEBRIS WHEN A VISUAL INSPECTION BY

THE C.O.R., COMPLETED PRIOR TO THE EQUIPMENT BEING MOVED TO THE SITE, DOES NOT

DISCLOSE SUCH MATERIAL PRESENT. A CURRENT LIST OF NON-NATIVE INVASIVE SPECIES OF

CONCERN TO THE FOREST SERVICE IS AVAILABLE AT THE FOREST SUPERVISOR'S OFFICE AT

GREEN MOUNTAIN & FINGER LAKES NATIONAL FOREST, 231 NO. MAIN STREET, RUTLAND,

VERMONT 05701.

5. ON-SITE MATERIAL WASHED FROM THE ROADWAY MAY BE USED FOR ROADWAYF FILL UNDER

THE FOLLOWING CONDITIONS. THE MATERIAL NEEDS TO MEET THE SPECIFICATION FOR

UNCLASSIFIED BORROW IN SECTION 704.06. NO EXCAVATION BELOW EXISTING GROUND SHALL

BE MADE TO RETRIEVE THE MATERIAL. NO TREE SHALL BE CUT TO RETREIVE THE MATERIAL.

MATERIAL RETRIEVED SHALL BE WITHIN 20 FEET OF THE EDGE OF THE ROADWAY TEMPLATE.

ALL USE OF ON-SITE MATERIAL SHALL BE APPROVED BY THE C.O.R.

6. ALL LOCATIONS LISTED IN THE WORK LIST SHALL BE LOCATED IN THE FIELD BY THE FS PRIOR TO

CONSTRUCTION.

EROSION CONTROL NOTES:

1. PRIOR TO STARTING CONSTRUCTION THE CONTRACTOR SHALL SUBMIT AN EROSION AND

SEDIMENT CONTROL PLAN WITH A SCHEDULE OF CONSTRUCTION ACTIVITIES. THE PLAN SHALL

BE SITE SPECIFIC AND SHALL BE PAID FOR INCIDENTAL TO ITEM 15713, SOIL EROSION AND

POLLUTION CONTROL.

2. THE CONTRACTOR SHALL MINIMIZE THE AMOUNT OF DISTURBED SOIL EXPOSED TO EROSION

FROM WIND AND WATER BY USING VEGETATIVE AND STRUCTURAL CONTROLS AND PROPER

TIMING AND SEQUENCING OF ACTIVITIES.

3. ALL ITEMS SPECIFIED IN THE EROSION CONTROL PLAN BUT NOT INCLUDED AS A SEPARATE PAY

ITEM SHALL BE PAID FOR INCIDENTAL TO ITEM 15713, SOIL EROSION AND POLLUTION

CONTROL.

4. THE CONTRACTOR SHALL APPLY TEMPORARY AND/OR PERMANENT SOIL STABILIZATION

MEASURES IMMEDIATELY ON ALL DISTURBED AREAS WHERE WORK IS DELAYED OR

COMPLETED.

5. ALL EARTH STOCKPILES SHALL BE PROTECTED BY SILT FENCE AT THE PERIMETER AND COVERED

WITH A BLANKET OF HAY MULCH.

6. AFTER THE PERMANENT EROSION CONTROL MEASURES ARE INSTALLED AND APPROVED BY THE

C.O.R., TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED AND DISPOSED OF BY

THE CONTRACTOR OFF GOVERNMENT LAND. COST FOR DISPOSAL SHALL NOT BE PAID FOR

SEPARATELY, BUT SHALL BE CONSIDERED INCIDENTAL TO INSTALLATION.

7. SEED MIXTURE FOR THE PURPOSES OF TURF ESTABLISHMENT SHALL BE THE NEW ENGLAND

EROSION CONTROL / RESTORATION MIX (FOR DETENTION BASINS AND MOIST SITES) BY NEW

ENGLAND WETLAND PLANTS, INC. OR AN APPROVED EQUAL. THE MIX SHALL CONTAIN ALL

NATIVE SPECIES TO THE STATE OF VERMONT. THE SEED MIX SHALL BE APPLIED PER THE

SEEDING FORMULA AND MANUFACTURER'S RECOMMENDATIONS. ALL SEEDED AREAS SHALL

RECEIVE MULCH IMMEDIATELY FOLLOWING SEEDING. PAYMENT FOR SEEDING SHALL BE

UNDER ITEM 62503, SEEDING, DRY METHOD.

8. PAYMENT FOR MULCHING SHALL INCLUDE SOIL PREPARATION AND MULCHING AND SHALL BE

PAID FOR UNDER ITEM 62509, MULCHING, DRY METHOD. ALL MULCH SHALL BE STRAW

MUCLH.

Work List

Mile Post Description

0.330 Place new 18” HDPE pipe culvert, 40’ length

0.341 Begin road reconstruction

0.360 Place new 36” HDPE pipe culvert, 40’ length

0.453 Remove & reset 18" pipe culvert

0.477 Place new 24” HDPE pipe culvert, 40’ length

0.512 End road reconstruction

0.513 Place new 18” HDPE pipe culvert, 40’ length

0.571 Place new 18” HDPE pipe culvert, 40’ length

0.589 Begin road reconstruction

0.621 Place new 24” HDPE pipe culvert, 40’ length

0.644 Place new 18” HDPE pipe culvert, 40’ length

0.698 Place new 18” HDPE pipe culvert, 40’ length

0.720 Place new 30” HDPE pipe culvert, 40’ length

0.777 Remove & reset 18" pipe culvert

0.826 Place new 18” HDPE pipe culvert, 40’ length

0.845 Place new 18” HDPE pipe culvert, 40’ length

0.852 Remove & reset 18" pipe culvert

0.867 Place new 18” HDPE pipe culvert, 40’ length

0.909 Place new 24” HDPE pipe culvert, 40’ length

0.964 Place new 24” HDPE pipe culvert, 40’ length

0.980 Place new 18” HDPE pipe culvert, 40’ length

1.023 Place new 24” HDPE pipe culvert, 40’ length

1.047 Place new 18” HDPE pipe culvert, 40’ length

1.047 End road reconstruction

1.061 Begin road reconstruction

1.067 Place new 30” HDPE pipe culvert, 40’ length

1.089 Remove & reset 18" pipe culvert

1.094 End road reconstruction

1.132 Place new 18” HDPE pipe culvert, 40’ length

1.146 Place new 18” HDPE pipe culvert, 40’ length

1.155 Place new 30” HDPE pipe culvert, 40’ length

1.188 Begin road reconstruction

1.196 Place new 24” HDPE pipe culvert, 40’ length

1.224 End road reconstruction

1.234 Begin road reconstruction

1.249 Place new 24” HDPE pipe culvert, 40’ length

1.256 End road reconstruction

1.267 Begin road reconstruction

1.277 Place new 24” HDPE pipe culvert, 40’ length

1.339 Place new 24” HDPE pipe culvert, 40’ length

1.375 Remove & reset 24" pipe culvert

1.383 End road reconstruction

1.438 Place new 24” HDPE pipe culvert, 40’ length

Site Location Map

Not to Scale

Typical road washout

Typical culvert & road washout

Typical culvert washout

File details come from the government source that posted it. Updated .