Section B C D E F G H I J K L M Grey Towers Mansion Storm Windows
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notification of Award GT Storm Windows.doc | DOC document | |
| Pre-bid Meeting Grey Towers Windows Questions and Answers.doc | DOC document | |
| 52.228-5 Insurance Work on a Government Installation.doc | DOC document | |
| sf-30 amendment 2.doc | DOC document | |
| 452.228.71 Insurance Liability.doc | DOC document | |
| sf-30.doc | DOC document | |
| Sec A SF-18.AG-24H8-S-08-0127.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ NEAT-02-110
Page
Construction RFQ
AG-24H8-S-08-0127
Grey Towers National Historic Site
Storm Windowns
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
USDA Forest Service Grey Towers National Historic Site
Magnetic Interior Storm Windows Schedule of Items
Base Bid: First and second floor Windows single pane removable standard color:
| WINDOWS |
| Aprox Sizes |
| First Floor |
| Second Floor |
| Third Floor |
| Total |
| cost |
| 8 over 8 double hungwindows |
| 38 " X 61" |
| 1 |
| 20 |
| 21 |
| $_________ |
8 over 8 double hung windows with fan lite
| 45" X 82" |
| 4 |
| 4 |
| $_________ |
| 8 over 8 double hung windows |
| 38" X 68" |
| 8 |
| 8 |
| $_________ |
| 8 over 8 double hung windows |
| 32" X 52" |
| 9 |
| $_________ |
| 6 over 6 double hung windows |
| 29" X 64 |
| 2 |
| 2 |
| $_________ |
| 6 over 6 double hung windows |
| 26" X 52 |
| 4 |
| $_________ |
| casement windows |
| 24" X 80" |
| 6 |
| 6 |
| $_________ |
TOTAL BASE BID
OPTION ITEMS:
Option Item 1: French Style Casement Doors single pane removable standard color
DOORS
| French style with fan lite |
| 60" X 113 |
| 1 |
| 1 |
| $_________ |
| French style with fan lite |
| 38" X 113" |
| 1 |
| 1 |
| $_________ |
| French style with fan lite |
| 46" X 113" |
| 6 |
| 6 |
| $_________ |
| French Style |
| 38" X 87" |
| 2 |
| $_________ |
TOTAL OPTION 1
Option Item 2: Third Floor windows single pane removable standard color:
| 6 over 6 double hung windows |
| 30" X 46 |
| 9 |
| 9 |
| $_________ |
| 6 over 6 double hung windows |
| 33" X 57" |
| 6 |
| 6 |
| $_________ |
| 6 over 6 double hung windows |
| 24" X 52" |
| 5 |
| 5 |
| $_________ |
| 6 over 6 double hung windows |
| 26" X 37" |
| 9 |
| 9 |
| $_________ |
| 2 over 2 double hung windows |
| 26" X 33" |
| 1 |
| 1 |
| $_________ |
| Awning Windows |
| 24" X 14" |
| 3 |
| 3 |
| $_________ |
TOTAL OPTION 2
Option Item 3: Added price for operator with Screen (per window)
Total Option 3
Option item 4: Custom color paint (per window) $_________
Total Option 4
QUOTERS PLEASE NOTE:
A. Before preparing your quotation, carefully review Section K, Section L and
Section M.
B. Only one award will be made as a result of this Solicitation.
C. Under Unit Price, "LS" stands for Lump Sum (LS). The quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.
D. There will be no conducted Pre-bid Meeting. Contractors are encouraged to view the site before quoting. Contact Brian Austin at 802-747-6757 if you have technical questions.
E. Price Range: The Government's estimate is:
between $25,000 and $100,000.
FAR 52.217-5 Evaluation of Options (July 1990) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
SECTION C - STATEMENT OF WORK
Grey Towers NHS – Storm Window Installation Mansion
SCOPE
Provide all labor, equipment, materials, and subcontracted services to manufacture and install storm windows on the interior of the wood single pane windows located in the Mansion at the Grey Towers National Historic Site, located just north of Milford, PA. The purpose of the Storm window Installation is to decrease the “u” value (which is the tendency of the window system to lose energy by conduction and infiltration) and increase the energy efficiency of the present single pane wood windows. Work shall be performed in accordance with the provided specifications and includes: manufacture of custom fit storm window, installation of the new storm windows to the interior of the existing windows.
The existing windows are historic to the building and the impact from the installation of the storm windows to the historic fabric should be minimal. The visual characteristics both from the interior and exterior should be minimal and narrowest dimension of the non glass components will be given highest consideration.
DRAWINGS
No drawings are provided for the bidding of this project:
SPECIFICATIONS
See the Technical Specifications publications.
SITE INSPECTION
It is the responsibility of the contractor to inspect the site to become familiar with the actual site conditions, verify dimensions, and other site aspects that may affect the proper pursuit of this project.
OCCUPANCY and SITE ACCESS
The Contractor must plan and coordinate all work with the Government COR (contracting officer’s representative) to minimize interruption of building services and employee/contractor access to site facilities. Work will need to be performed to ensure that daily work activities by Grey Towers employees are not adversely affected.
SANITATION FACILITIES
The Government will allow use of sanitation facilities during the period of construction for this project, during normal office hours. It is the contractor’s responsibility to use these facilities responsibly, and ensure that public areas and restrooms are kept clean.
EXISTING CONDITIONS
The windows are located in the Mansion that was built in 1886 and are single pane wooden double hung and casement style windows of various sizes. The Mansion is open to the public on the first floor and tours are given daily between May and November and the rest of the building is occupied by Grey Towers employees.
GOVERNMENT FURNISHED UTILITIES
A. The Government will furnish electrical and water utilities for the contractors use during installation within reason so long as the Contractor uses these efficiently and economically. Use of government furnished electricity for the purposes of providing space heating will not be permitted.
B. The use of the Government telephone and fax machine is permitted but shall be requested. Incoming calls will not be accepted on Government phones.
REFUSE/WASTE DISPOSAL
A.
At the end of the project, all waste products shall be removed from the site and disposed in a State-approved method.
B. The Contractor shall maintain the project site free and clear of garbage/debris on a daily basis.
C. The Contractor shall maintain the site free of hazards. The Contractor shall take measures to assure that potential hazards typical for the work have been considered and precautions are taken to mitigate them, for his employees, subcontractors, government employees, and passers-by.
PROJECT STAGING AREA
A reasonable project staging area will be provided for this project. The location of the staging area, and any stipulations relative to its use will be by mutual agreement between the Contractor and the Government.
GREEN PLAN
A Green Plan of Operation (See Section M) is required when submitting a quotation. The Green Plan shall show recycle and/or re-use of existing products removed, and use of bio-preferred products, environmentally friendly products, and alternate fuel vehicles used in the operation of the work. The Contractor may refer to the websites at http://www.epa.gov/epp/pubs/products/index.htm and http://www.biopreferred.gov/DesignationItemList.aspx 08580. 9000
MAGNETIC INTERIOR STORM WINDOWS
05/08
PART 1 GENERAL
1.1 REFERENCES
American Architectural Manufacturing Association
American Society for Testing Materials
1.2 PROJECT REQUIREMENTS
1.3 SUBMITTALS
SD-01 Shop Drawings are to be submitted showing components, sizes and fastening details.
SD-02 Product Data - Manufacturer's standard catalog data; submitted prior to manufacturing or installation detailing materials, fasteners, hardware, window members, magnetic seal, weather stripping, finish, glass specifications and glazing material, size, options, performance charts and curves, etc. in adequate detail to demonstrate compliance with contract requirements. Include in the Data manufacturer's recommended installation and maintenance instructions and procedures.
SD-04 Verification of Dimensions - A letter, at least two weeks prior to beginning installation, including the date the site was visited, confirmation of existing conditions, and any discrepancies found.
1.4 DELIVERY, STORAGE, AND HANDLING
Protect stored items from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Proper protection and care of all material both before and during installation is the Contractor's responsibility. Replace any materials found to be damaged at the Contractor's expense.
1.5 MANUFACTURER'S MULTI-YEAR WARRANTY
The manufacturer will be responsible for warranty minimum of five (5) year against faulty materials, paint and workmanship. Coordinate the selections made with the installation and consider the needs and repair/response capabilities of the user, the criticality of the site, the location of the site in relation to the availability of manufacturer qualified technicians, and cost.
1.5.1 Local Service Representative - Furnish Owner with manufacturer's multi-year warranty with the name, address, and telephone number of the service representative nearest to the location where the windows are installed. Upon a request for service under the multi-year warranty, the service representative shall honor the warranty during the warranty period, and shall provide the services prescribed by the terms of the warranty.
FOREST SERVICE PERSONNEL SHALL PERFORM PREVENTIVE MAINTENANCE AND OPERATIONAL MAINTENANCE
PART 2 PRODUCTS
2.1 STANDARD COMMERCIAL PRODUCTS
All materials shall be of commercial quality and proper for window construction free from defects impairing strength and durability and meet ASTM standards. All screws and other miscellaneous fastening devices incorporated shall be non corrosive and compatible. Glass shall be low E and not less than B quality. Finishes on exposed non glass members shall be clean and free from serious surface blemishes and meet AAMA standards.
Provide materials which are the standard products of a manufacturer regularly engaged in the manufacturing of such products, that are of a similar material, design and workmanship, and that have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2 year use shall include applications of materials under similar circumstances and of similar size. The 2 years experience shall be satisfactorily completed by a product which has been sold or is offered for sale on the commercial market through advertisements, manufacturer's catalogs, or brochures. Products having less than a 2 year field service record shall be acceptable if a certified record of satisfactory field operation, for not less than 6000 hours exclusive of the manufacturer's factory tests, can be shown. Products shall be supported by a service organization, as specified in the Submittals paragraph.
PART 3 EXECUTION
3.1 EXAMINATION
After becoming familiar with all details of the work, perform verification of dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.
3.2 INSTALLATION
Perform all work in accordance with the manufacturer's published diagrams, recommendations, and warranty requirements. Installer shall securely fasten windows in place to a strait, plumb and level condition, without distortion of the windows and shall make final adjustments for proper operation with manufacturer’s recommendations.
3.3 CLEANING
Windows shall be wiped clean, with all traces of oil, dust, dirt, or paint spots removed.
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-1 Contractor Inspection Requirements (APR 1984)
E-1 INSPECTION OF CONSTRUCTION (FAR 52.246-12) (Aug 1996)
(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not-
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection make reinspecting or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
E-2 INSPECTION AND ACCEPTANCE
Inspection and acceptance of all work performed under this contract shall be by the Contracting Officer's Technical Representative.
SECTION F--DELIVERIES OR PERFORMANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984) FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than December 7, 2008 or 90 calendar days after the date of notice to proceed. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by September 8, 2008. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
AGAR 452.236-75 Maximum Workweek – Construction Schedule (NOV 1996) Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
The maximum workweek that will be approved is Monday through Friday except holidays.
HOW TO REACH LOCATION
The Grey Towers Mansion Storm Window project is located on the grounds of the grey towers National Historic Site, which is ½ mile west of Milford, PA (Old Oswego Turnpike).
SECTION G--CONTRACT ADMINISTRATION DATA
AGAR 452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within 5 days after the date of contract award. The conference will be held at Grey Towers National Historic Site, 151 Grey Towers Drive, Milford, PA 18337
G.1 DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
On all matters that pertain to the contract terms the contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the contracting officer should be notified immediately, preferable in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G.2 PROJECT MANAGER
The offeror is requested to designate a Project Manager to be contacted for prompt contract administration:
Telephone Number: ______________________________
The contract shall provide a Project Manager who shall have the authority to make any no-cost contract technical, hiring and dismissal decisions, or special arrangements regarding this contract. This individual shall be responsible for the overall management and coordination of this contract and shall act as the central point of contact with the Government. The Project Manager, or a designated representative, shall have full authority to act for the Contractor in the performance of the required services. The Project Manager, or a designated representative, shall meet with the Contracting Officer's Technical Representative (COTR) to discuss problem areas as they occur. The Project Manager or his/her representative shall respond within four hours after notification of the existence of a problem. The Project Manager shall be able to fluently read, write, and speak the English language.
G.3 INVOICE REQUIREMENTS
One payment, in arrears, will be made upon completion and acceptance of work. The COTR will inspect and accept work. Once work is completed Contractor is to immediately forward an original and one copy of a proper invoice to the Contracting Officer at the address in block 5B of SF-18, Page 1.
The Definition of a Proper Invoice is:
An invoice includes the Government Purchase Order No., an invoice number (with 5 number characters and not beginning with 0 or 1), the Contract Line Item from the Purchase Order with the lines matching the Purchase Order Line Numbers, the amount for each line number, the description of the work, the total, the Remit to Address, the TIN (taxpayer ID number), and the DUNS (Dun and Bradstreet number).
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 DIFFERING SITE CONDITIONS (FAR 52.236-2) (APR 1984)
(a) The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of (1) subsurface or latent physical conditions at the site which differ materially from those indicated in this contract, or (2) unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work of the character provided for in the contract.
(b) The Contracting Officer shall investigate the site conditions promptly after receiving the notice. If the conditions do materially so differ and cause an increase or decrease in the Contractor's cost of, or the time required for, performing any part of the work under this contract, whether or not changed as a result of the conditions, an equitable adjustment shall be made under this clause and the contract modified in writing accordingly.
(c) No request by the Contractor for an equitable adjustment to the contract under this clause shall be allowed, unless the Contractor has given the written notice required; provided, that the time prescribed in (a) above for giving written notice may be extended by the Contracting Officer.
(d) No request by the Contractor for an equitable adjustment to the contract for differing site conditions shall be allowed if made after final payment under this contract.
H.2 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK 52.236-3 (APR 1984)
(a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to
(1) conditions bearing upon transportation, disposal, handling, and storage of materials;
(2) the availability of labor, water, electric power, and roads;
(3) uncertainties of weather, river stages, tides, or similar physical conditions at the site;
(4) the conformation and conditions of the ground; and
(5) the character of equipment and facilities needed preliminary to and during work performance.
The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.
(b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.
H.3 MATERIAL AND WORKMANSHIP 52.236-5 (APR 1984)
(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.
(b) The Contractor shall obtain the Contracting Officer's approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer's approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor's expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.
(c) All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.
H.4 SUPERINTENDENCE BY THE CONTRACTOR 52.236-6 (APR 1984)
At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.
H.5 PERMITS AND RESPONSIBILITIES 52.236-7 (NOV 1991)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
H.6 OTHER CONTRACTS 52.236-8 (APR 1984)
The Government may undertake or award other contracts for additional work at or near the site of the work under this contract. The Contractor shall fully cooperate with the other contractors and with Government employees and shall carefully adapt scheduling and performing the work under this contract to accommodate the additional work, heeding any direction that may be provided by the Contracting Officer. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by Government employees.
H.7 USE AND POSSESSION PRIOR TO COMPLETION 52.236-11 (APR 1984)
(a) The Government shall have the right to take possession of or use any completed or partially completed part of the work. Before taking possession of or using any work, the Contracting Officer shall furnish the Contractor a list of items of work remaining to be performed or corrected on those portions of the work that the Government intends to take possession of or use. However, failure of the Contracting Officer to list any item of work shall not relieve the Contractor of responsibility for complying with the terms of the contract. The Government's possession or use shall not be deemed an acceptance of any work under the contract.
(b) While the Government has such possession or use, the Contractor shall be relieved of the responsibility for the loss of or damage to the work resulting from the Government's possession or use, notwithstanding the terms of the clause in this contract entitled "Permits and Responsibilities." If prior possession or use by the Government delays the progress of the work or causes additional expense to the Contractor, an equitable adjustment shall be made in the contract price or the time of completion, and the contract shall be modified in writing accordingly.
H.8 CLEANING UP 52.236-12 (APR 1984)
The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer.
H.9 ACCIDENT PREVENTION 52.236-13 (NOV 1991)
(a) The Contractor shall provide and maintain work environments and procedures which will --
(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;
(2) Avoid interruptions of Government operations and delays in project completion dates; and
(3) Control costs in the performance of this contract.
(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall --
(1) Provide appropriate safety barricades, signs, and signal lights;
(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910; and
(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.
(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.
(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor's representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.
H.10 SAMPLES AND CERTIFICATES (AGAR 452.236-76) (FEB 1988)
When required by the specifications or the Contracting Officer, samples, certificates, and test data shall be submitted after award of the contract, prepaid, in time for proper action by the Contracting Officer or his/her designated representative. Certificates and test data shall be submitted in triplicate to show compliance of materials and construction specified in the contract performance requirements. Samples shall be submitted in duplicate by the Contractor, except as otherwise specified, to show compliance with the contract requirements. Materials or equipment for which samples, certifications or test data are required shall not be used in the work until approved in writing by the Contracting Officer.
H.11 APPLICABLE MINIMUM HOURLY RATES OF WAGES
The attached Wage Determination, No. VT030007, and VT030016 specifies the minimum hourly rate of wages that shall be paid to laborers and mechanics, etc. employed or working at the site embraced by the specifications. The rate has been determined by the Secretary of Labor in accordance with the provisions of the Davis-Bacon Act, as amended by FPR Temporary Regulation 70.
H.12 RESPONSIBILTY FOR SAFETY
It is the contractor’s responsibility to ensure that the work environment is safe for themselves as well as their employees. If the contractor feels that a requirement of this contract would place them or their employees in an unsafe environment, then work should stop on that area of work and the contractor should contact the COR. Work on other areas of the contract that the contractor does not view as unsafe should continue. A written Safety Plan will be provided to the COR before work begins on the project. It is expected that safety briefings between the Contractor and his/her employees are conducted prior to the beginning of any task and at least once weekly for the duration of the contract.
H.13 SUPLEMENTAL SPECIFICATION
Grey Towers National Historic Site
Storm Window Installation
Supplemental Specifications The majority of the windows in the mansion are wood frame and sash, double hung units with some casement style or type sash. There are 10 exterior wood frame “French” doors casement.
| WINDOWS |
| Aprox Sizes |
| First Floor |
| Second Floor |
| Third Floor |
| Total |
| 8 over 8 double hung windows |
| 38 " X 61" |
| 1 |
| 20 |
8 over 8 double hung windows with fan lite above
| 45" X 82" |
| 4 |
| 8 over 8 double hung windows |
| 38" X 68" |
| 8 |
| 8 over 8 double hung windows |
| 32" X 52" |
| 6 over 6 double hung windows |
| 29" X 64 |
| 2 |
| 6 over 6 double hung windows |
| 26" X 52 |
| 6 over 6 double hung windows |
| 30" X 46 |
| 9 |
| 9 |
| 6 over 6 double hung windows |
| 33" X 57" |
| 6 |
| 6 |
| 6 over 6 double hung windows |
| 24" X 52" |
| 5 |
| 5 |
| 6 over 6 double hung windows |
| 26" X 37" |
| 9 |
| 9 |
| 2 over 2 double hung windows |
| 26" X 33" |
| 1 |
| 1 |
| casement windows |
| 24" X 80" |
| 6 |
| Awning Windows |
| 24" X 14" |
| 3 |
| 3 |
Total all Windows
DOORS
| French style with fan lite |
| 60" X 113 |
| 1 |
| French style with fan lite |
| 38" X 113" |
| 1 |
| French style with fan lite |
| 46" X 113" |
| 6 |
| French Style |
| 38" 87" |
Total all Doors
Approximate sizes and quantity
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.204-9 Personal Identity Verification of Contractor Personnel (SEP 2007) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (SEP 2006) (Applicable if contract exceeds $30,000) 52.211-18 Variation in Estimated Quantity (APR 1984)
52.219-3 Notice of Total HUBZone Set-Aside (JAN 1999) 52.222-3 Convict Labor (JUN 2003) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988)
52.222-8 Payrolls and Basic Records (FEB 1988)
52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (FEB 1988)
52.222-20 Walsh-Healy Public Contracts Act (DEC 1996) (Applicable if contract exceeds $10,000) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) (Applicable if contract exceeds $10,000) 52.222-26 Equal Opportunity (MAR 2007) (Applicable if contract exceeds $10,000) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) (Applicable if contract exceeds $10,000) 52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998) (Applicable if contract exceeds $10,000)
52.222-50 Combating Trafficking in Persons (SEP 2007) 52.223-5 Pollution Prevention and Right-to-Know Information (AUG 2003) 52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual) 52.223-10 Waste Reduction Programs
52.224-1 Privacy Act Notification (APR 1984)
52.224-2 Privacy Act (APR 1984)
52.225-13 Restrictions on Certain Foreign Purchases (FEB 2006)
52.227-4 Patent Indemnity -- Construction Contracts (APR 1984)
52.228-2 Additional Bond Security (OCT 1997) (Applicable if contract exceeds $30,000)
52.228-11 Pledges of Assets (FEB 1992) (Applicable if contract exceeds $30,000) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) (Applicable if contract exceeds $30,000) 52.228-14 Irrevocable Letter of Credit (DEC 1999) (Applicable if contract exceeds $30,000) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-23 Assignment of Claims (JAN 1986)
52.232-27 Prompt Payment for Construction Contracts (SEP 2005)
52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)
52.233-1 Disputes (JUL 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by the Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-8 Other Contracts (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-11 Use and Possession Prior to Completion (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-13 Accident Prevention (NOV 1991)
Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997)
52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984)
52.244-6 Subcontracts for Commercial Items (MAR 2007) 52.245-2 Government Property (Fixed-Price Contracts) (JUN 2007) 52.246-21 Warranty of Construction (MAR 1994) Alternate I (APR 1984)
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984)
52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) (Applicable if contract is over $30,000) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76 Samples and Certificates (FEB 1988)
452.236-77 Emergency Response (NOV 1996)
52.204-7 Central Contractor Registration (JUL 2006)
(a) Definitions. As used in this clause—
“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same parent concern.
“Registered in the CCR database” means that—
(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and
(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.
(b)
(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) If located within the United States, by calling Dun and Bradstreet at 1-866-705-5711 or via the Internet at http://www.dnb.com; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(g)
(1)
(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:
(A) Change the name in the CCR database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.
52.223-11 Ozone-Depleting Substances.
As prescribed in 23.804(a), insert the following clause:
Ozone-Depleting Substances (May 2001)
(a) Definition. “Ozone-depleting substance,” as used in this clause, means any substance the Environmental Protection Agency designates in 40 CFR Part 82 as—
(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or
(2) Class II, including, but not limited to, hydrochlorofluorocarbons.
(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:
Warning
Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.
* The Contractor shall insert the name of the substance(s).
52.223-10 Waste Reduction Program.
As prescribed in 23.706(a), insert the following clause:
Waste Reduction Program (Aug 2000)
(a) Definitions. As used in this clause—
“Recycling” means the series of activities, including collection, separation, and processing, by which products or other materials are recovered from the solid waste stream for use in the form of raw materials in the manufacture of products other than fuel for producing heat or power by combustion.
“Waste prevention” means any change in the design, manufacturing, purchase, or use of materials or products (including packaging) to reduce their amount or toxicity before they are discarded. Waste prevention also refers to the reuse of products or materials.
“Waste reduction” means preventing or decreasing the amount of waste being generated through waste prevention, recycling, or purchasing recycled and environmentally preferable products.
(b) Consistent with the requirements of Section 701 of Executive Order 13101, the Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by this contract. The Contractor’s programs shall comply with applicable Federal, State, and local requirements, specifically including Section 6002 of the Resource Conservation and Recovery Act (42 U.S.C. 6962, et seq.) and implementing regulations (40 CFR Part 247).
(End of clause)
FAR 52.225-9 Buy American Act-Construction Materials (JAN 2005)
(a) Definitions. As used in this clause—
"Component" means an article, material, or supply incorporated directly into a construction material.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
"Cost of components" means—
(1) For components purchased by the Contractor, the acquisition cost, including…