52.228-5 Insurance Work on a Government Installation.doc
FAR Clause DOC document 21 KB Posted
- Solicitation number
- AG-24H8-S-08-0127
About this file
52.228-5 Insurance Work on a Government Installation
View the file
Other versions and copies of FAR 52.228-5
| File | Revision | Posted | Attached to |
|---|---|---|---|
| 15. Attachment 7-FAR Clause 52.228-5.pdf | Revision not stated | Joint Base Lewis-McChord PAVEMENT IDIQ | |
| FAR_52.228-5 | Revision not stated | OPTION - CCTV Preventive Maintenance and Repairs | |
| Local_Information_52.228-5 | Revision not stated | Shower Lease Services | |
| HSBP1110Q2867 52.228-5.pdf | Revision not stated | Animal Caretaker services in Otay Mesa, CA |
Who attaches FAR 52.228-5
Other files
| File | Type | Posted |
|---|---|---|
| Notification of Award GT Storm Windows.doc | DOC document | |
| Pre-bid Meeting Grey Towers Windows Questions and Answers.doc | DOC document | |
| sf-30 amendment 2.doc | DOC document | |
| 452.228.71 Insurance Liability.doc | DOC document | |
| sf-30.doc | DOC document | |
| Sec B-M Grey Towers Storm Windows.doc | DOC document | |
| Sec A SF-18.AG-24H8-S-08-0127.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
52.228-5 Insurance—Work on a Government Installation.
As prescribed in 28.310, insert the following clause:
Insurance—Work on a Government Installation (Jan 1997)
(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective—
(1) For such period as the laws of the State in which this contract is to be performed prescribe; or
(2) Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
(End of clause)
File details come from the government source that posted it. Updated .