Manchester Ranger District Office Questions & Answers 06/01/2015

1. The radio antenna at the East elevation is currently supported by a bracket back to the building just above the existing gable vent. – the new gable vent encompasses this area. Please provide detail of new support bracket.

NEW BRACKETS ARE REQUIRED TO HAVE THE SAME CROSS SECTION DIMENSIONS AND BE THE SAME MATERIAL AS EXISTING. LENGTHS OF BRACKETS ARE TO BE EXTENDED AS REQUIRED TO MOUNT TO THE BUILDING OUTSIDE OF THE GABLE VENT.

2. North elevation Phase 2 portion does not depict the new public entry door etc.

ONLY SHOWED PHASE 2 CONSTRUCTION IN FLOOR PLAN VIEW. THE INFORMATION CAN BE TAKEN FROM DRAWING A6-01, FRAME ELEVATION 7, AND DOOR ELEVATION C.

3. Room finish schedule for mailroom 107 and storage 109indicates existing floor finish to temain – demolition drawing has these floor finishes being removed – with all the walls being removed this makes sense – what floor finishes are to be installed here? Linoleum?

LINOLEUM.

4. What floor finishes will be required for the alcove outside rooms 108 & 109? Linoleum?

LINOLEUM.

5. Door schedule shows a door 112 – I cannot find this door on the floor plan?

DOOR IS FOR EXISTING STORAGE ROOM 101A ONLY.