Attch_1_Specs_and_Drawings.pdf
PDF 3 MB Posted
- Attached to
- Finger Lakes Trough, Hydrant, Culvert Work Federal contract opportunity
- Solicitation number
- AG-1681-S-15-0004
About this file
Attch 1 Specs and Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-1681-S-15-0004-000002_Complete.pdf | ||
| AG-1681-S-15-0004-000001_Complete.pdf | ||
| Attch_2_DBWD_NY150051_010215_NY51_Heavy_Schuyler_Co.pdf | ||
| AG-1681-S-15-0004.pdf | ||
| Attch_3_GovtProvidedTechnicalProposalForms.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Finger Lakes National Forest Trough, Hydrant & Culvert Installation
Index of Sheets
Description Sheet Number Title Sheet 1 Statement of Work 2 Project Specifications 3 – 7 Material Specifications 8 – 11 Appendix A (Site Maps) 12 – 14 Appendix B (Pictures) 15 – 18 Pond Dredging Details 19 Hydrant Details 20 Trench/Waterline Details 21 Pond Riser Details 22 Trough Excavation 23 Trough Details 24 Culvert Details 25
Finger Lakes National Forest 2015
STATEMENT OF WORK
1. PROJECT DESCRIPTION
This project is to dredge two ponds, install a frost free hydrant and waterline, replace a water trough and waterline, and replace two trail culverts located on the Hector Ranger District on the Finger Lakes National Forest Service. The project includes site restoration, which includes finish grading and seeding.
The site locations are broken downs as follows:
Backbone Horse Camp: The site location is approximately 0.15 miles North on Forest Trail 608 (Backbone Trail) from the junction of Burnt Hill Road and Picnic Area Road in Hector, NY. See Appendix A for a location map. The work at this site includes (See Appendix B for pictures of items):
A. Dredging Backbone Pond and Restoring Dike (Approx. 4,500 Square Foot Pond) B. Installing a Frost Free Water Hydrant and Waterline C. Replacing a Trail Culvert (30 inch diameter)
Auble Pond and Backbone Trail: The site location is approximately 0.30 miles West on Forest Trail 608 (Backbone Trail) from the junction of Vesa Road and Bower Road in Hector, NY. See Appendix A for a location map. The work at this site includes (See Appendix B for pictures of items):
A. Dredging Auble Pond and Restoring Dike (Approx. 36,000 Square Foot Pond) B. Replace Water Trough and Waterline C. Replacing a Trail Culvert (30 inch diameter)
2. ACCESS
Both sites are accessible for vehicles and equipment. Access to Backbone Horse Camp work site is from the Backbone Campground. Access to Auble Pond and Backbone Trail work site is from the intersection of Bower Road and Vesa Road.
3. SCOPE OF WORK
The Contractor shall provide all labor, equipment, materials, supplies and supervision required to complete work listed in Section 1 at the project sites located on the Finger Lakes National Forest.
4. PROJECT START DATES
Work shall start after August 1st and complete by September 9th.
PROJECT SPECIFICATIONS
1. GENERAL NOTES
A. All existing culverts, water troughs and other waste material shall become the property of the Contractor and shall be removed and disposed of from U.S. Government land.
B. All soil moving equipment shall be thoroughly cleaned to make it free of soil, noxious weed seeds, vegetative matter or other debris that could contain or hold seeds prior to being delivered to the project site and leaving the site. Equipment shall be considered free of soil, noxious weed seeds and other such debris when a visual inspection by the COR., prior to the equipment being delivered to the site, does not disclose such material present. Disassembly of equipment components is not required. The Contractor shall notify the Forest Service at least five (5) working days prior to moving each piece of soil moving equipment onto the project site, and arrange for a convenient time and place for the Forest Service to inspect each piece of soil moving equipment prior to it being placed into service. The Contractor shall thoroughly clean all soil moving equipment prior to moving them between work sites. Equipment shall be considered free of soil, noxious weed seeds and other such debris when a visual inspection by the COR. The Contractor and the Forest Service shall agree on the methods of cleaning, location for the cleaning and control of off-site impacts, if any.
C. A spill prevention kit shall be furnished and on-site at all times during construction. This shall be paid for incidental to all other costs.
D. The Contractor shall apply temporary and /or permanent soil stabilization measures immediately on all disturbed areas where work is delayed or completed.
E. Any location of bare soil shall be seeded after completion of work. Prior to the beginning of seeding activities all surface areas required to be seeded shall be finished as required by other applicable subsections of this specification to the lines and grades shown on the drawings. Areas that have been damaged by erosion or other causes shall be restored before seeding. All stones, lumps, roots or other objectionable material shall be removed. The surface soil shall be roughened or loosened to provide a favorable condition for germination. Seed to be provided by the Forest Service. The reclamation/pollinator seed mixture to be used at all sites. The appropriate amount of seed will be supplied for all sites by the Forest Service. The seed mix shall be applied per the seeding formula and manufacturer’s recommendations.
F. All seeded areas shall be covered with erosion control matting immediately following seeding. Erosion control matting shall be Type 1.A Rolled Erosion Control Products or equivalent and installed in accordance with the manufacturer’s instructions.
G. Any ground disturbing activities beyond the authorized activities must be approved by the COR prior to implementation and restoration shall be paid for at the expense of the Contractor.
H. The Contractor shall be liable for all damage to property, including gates, fences, trees, etc., caused by its operations. Damaged items shall be repaired or replaced, as approved by the COR, by and at the Contractor’s expense at no additional cost to the Government.
I. Acceptance of work is subsequent to completion of all specifications as outlined for Trough/Hydrant Installation, Culvert Replacement, and Pond Dredging. Site restoration shall be incidental to all other costs.
2. POND DREDGING
A. Description. This work shall consist of the excavating, shaping pond side slopes and all material removed, on site material disposal, pumping and seeding and mulching all disturbed surfaces in accordance with these specifications and in reasonably close conformity with the lines, grades and typical cross sections shown on Sheet 19 or established by the C.O.R. It shall also consist of clearing and minor repair work, for the specified pond, in accordance with these specifications and the details shown on the drawings.
B. Clearing. All standing brush and trees on dike slopes shall be cut and disposed of. All cut material and down trees and other materials shall be disposed of on-site to be determined by the C.O.R. All stumps shall be cut flush and parallel with ground surface. Disposal shall be in accordance with the requirements of subsection Cleanup and Disposal.
C. Pumping. Prior to the beginning of excavation, the pond shall be completely dewatered unless shown otherwise on the drawings.
The discharge from any pumping operation shall not be discharged directly into a brook, stream or other body of water. Pump discharge shall be discharged into a settling pond or onto an area suitable to filter the sediment from the discharge prior to entering a stream or body of water as directed by the C.O.R.
D. Dredging Requirements. Prior to the beginning of excavation all necessary clearing along the pond edge and dewatering shall be completed.
The pond shall be excavated to the depth and slopes shown on Sheet 19 and with a horizontal bottom. The excavation shall be carried to either the specified depth or solid rock whichever occurs first. Excavation of solid rock is not required. If a permeable material is encountered in the excavation that will cause the pond to leak, all excavation shall cease and the COR shall be notified immediately.
Excavated surfaces shall be reasonably smooth and uniform around the pond perimeter. All existing depressions, sloughs and washed or worn depressions on the external dike side slope surface and on all internal pond perimeter side slope surfaces shall be filled with excavated material to provide a uniform surface from the existing ground surface to the pond bottom. Transitions between different side slopes shall be uniform over the distance specified on the drawings.
E. Silt Fence Used For Erosion Control. A silt fence shall be used in the construction of temporary structures such as settling basins, check dams and other application as determined by the C.O.R. to control erosion and contain soil runoff. Silt fence shall be constructed in accordance with manufactures specifications.
F. Cleanup and Disposal. All excavated material shall be disposed of at the on site location(s) shown on the drawings or at other on site locations directed by the C.O.R. Excavated material shall be placed and spread so that it shall blend in with the existing natural or man-made landforms at the disposal site. It is not the intent to create mounds or piles of waste material. The surface of the disposed material shall be sloped to drain, graded smooth and uniform with no projecting rocks, roots, stumps or other debris and be suitable for field mowing. Machine back blading is acceptable for the finished surface.
When disposed material is to wet to shape properly, it will be left to drain until it becomes suitable to grade and shaped as required above.
All cut brush and trees and slash shall be removed and buried in the waste disposal area shown on the drawings or at other locations as directed by the C.O.R. All waste materials shall be matted down in layer and covered with at least two (2) feet of material dredged from the pond.
G. Post Site Work. All areas of bare soil shall be seeded as specified in the General Notes Section of these specifications.
3. TROUGH INSTALLATION
A. Excavation. The area where the trough is to be installed shall be excavated to a depth of eighteen inches (18”) and a diameter of twenty-four and half feet (24.5’), see drawings on Sheet 23. The center of the excavation shall be the center of the trough once filled and leveled with rock. The bottom of the trough shall be placed six inches (6”) below the final grade of stone.
Remove existing water trough and waterline. Dispose of them as specified in the General Notes Section of these specifications. The new water line and pond riser will be placed at their existing locations. The trench and depth of the new waterline shall be as shown on the drawings on Sheet 21 or as specified by the COR.
Material excavated from the dike structure for installing the waterline shall be saved and re-used to rebuild the dike. The material that is excavated and not suitable for fill or restoring the dike will be transported offsite and will be the responsibility of the contractor.
B. Plumbing. The Contractor shall be responsible to furnish and install all material required to install the trough, waterlines and pond riser (unless otherwise noted). The inlet and drainage pipes shall be 1-1/2” PVC pipe. Materials to be furnished by the Government are:
8.5 feet diameter tire trough (weighs approximately 2000-2400lbs. Tire trough manufacture is:
Leiden Land and Cattle Company, 525 Maple Road, Coalport, PA 16627).
1 ½” high flow float valve with float 1 ½” brass nipples 1 ½” brass couplers 1 ½” brass 90 degree
Government furnished material will be located at the Hector Grazing Association Headquarters at 5046 Searsburg Road, Trumansburg, NY 14886.
The Contractor is responsible to ensure that all pipe and fittings that are used to connect the trough to the water lines meet the requirements of the trough manufacture’s specifications.
Install the pond riser and intake line as shown on the drawings on sheet 22.
Install pipes into the trough as shown on the drawings on Sheet 24 and so that the pipes would enter the center of the tire and thus where the cement would be poured. The inlet pipe from the pond and drain pipe from the trough shall be the same line with t-joints for the float valve and drain. The drainage line shall daylight at the same location as the current drain line or as specified by the COR.
The valve and float will be installed and will be fully operational without leaking. An additional valve will need to be installed in the interior of the tank on the drain pipe (or another approved location) to allow for draining of the tank if necessary.
Concrete will be poured within the bottom and center of the tire using the tire manufacturers recommended methods. Non-shrink concrete will be used to fill the inner diameter of the bead and make a permanent seal around the bead. Concrete shall be minimum 3000 psi compressive strength, air entrainment 5% and slump of 4” max. Concrete may be mixed on-site. A water resistant/ rubber and cement bondable sealant will be applied around the interface between the cement and rubber and around the inlet and drainage pipes between the cement and piping. Concrete will be allowed to dry completely before filling with water.
Install a drainage line in the excavated area around the trough to facilitate removing excess water from around the trough. The drainage line for the excavated area may be installed adjacent to the drain line from the trough and daylight at the same location.
C. Backfilling/Rebuild Dike. The Contactor shall place geotextile matting (Non-Woven, Class 2, Type D) on the bottom and sides of the excavation for the water trough. The excavation shall be filled with a mixture of aggregate (Gradation A) and gabion rock. The mixture shall be approximately 50/50 and the aggregate shall be used to fill between the spaces of the gabion stone.
The bottom of the tire trough will be installed six inches (6”) below the final grade of stone, so that when backfilling a portion of the tire will be backfilled with rock and provide additional stability.
Backfill the waterline trench as shown on the drawing on Sheet 21.
Rebuild the dike structure using the material that was excavated from the dike. The size and slope of the rebuilt dike embankment shall match the existing dike or as specified by the COR. The slope shall not be greater than 1V:3H. Place material in six inch (6”) lifts and uniformly compact each layer.
D. Post Site Work. All areas of bare soil shall be seeded as specified in the General Notes Section of these specifications.
4. FROST FREE HYDRANT INSTALLATION
A. Excavation. Excavate the trench for the water line and pond riser. Location of the hydrant, waterline and pond riser will be specified and marked by the Forest Service. The trench and depth of the new waterline shall be as shown on the drawings on Sheet 21.
Material excavated from the dike structure for installing the waterline shall be saved and re-used to rebuild the dike. The material that is excavated and not suitable for fill or restoring the dike will be transported offsite and will be the responsibility of the contractor.
B. Plumbing. The Contractor shall be responsible to furnish and install all material required to install the hydrant, waterlines and pond riser (unless otherwise noted). The hydrant shall be frost/freeze proof.
The hydrant shall be a Woodford Manufacturing Company, Model R34 Yard Hydrant, or an approved equal. Prior to installation, the type of hydrant to be installed shall be approved by the COR.
The Contractor shall ensure that all piping and fittings match the hydrant manufactures requirements. The piping may be PVC or galvanized steel.
Install the pond riser, intake line and waterline as shown on the drawings on Sheet 22.
Install the hydrant as shown on the drawings on Sheet 20 and in accordance with the manufactures specifications.
C. Backfilling/Rebuild Dike. Backfill the waterline trench as shown on the drawing on Sheet 21.
Rebuild the dike structure using the material that was excavated from the dike. The size and slope of the rebuilt dike embankment shall match the existing dike or as specified by the COR. The slope shall not be greater than 1V:3H. Place bedding and backfill material in six inch (6”) lifts and uniformly compact each layer.
D. Post Site Work. All areas of bare soil shall be seeded as specified in the General Notes Section of these specifications.
5. CULVERT REPLACEMENT
A. Installation. The Contractor shall be responsible to replace existing 30 inch diameter metal culverts located directly downstream of the Auble Pond and approximately 15 feet south of the Frost Free Hydrant installation at the Backbone site. The existing culverts are 20 ft long and shall be replaced with culverts that are 30 ft long. The culverts will be mark by the Forest Service. The new culvert shalls be a 30 inch diameter high density polyethylene (HDPE) culvert.
Install the culverts as shown on the drawings on Sheet 25. Place bedding and backfill material in six inch (6”) lifts and uniformly compact each layer.
Dispose of them as existing culvert in the General Notes Section of these specifications.
6. MATERIAL SPECIFICATIONS
A. Bedding Material: Bedding material may be existing material that is conserved from excavated areas or furnished by the Contractor.
Existing material must be approved by the COR.
Furnished material must be a suitable, well-graded, free draining material conforming to the following:
(1) Maximum particle size ½ in (12.5 mm) or half the corrugation depth, whichever is smaller
(2) Material passing No. 200 (75-µm) sieve, 10.0 percent max.
AASHTO T 27 and AASHTO T 11
B. Backfill Material: Backfill material may be existing material that is conserved from excavated areas or furnished by the Contractor.
Furnished material must be a suitable, well-graded, compactable material conforming to the following:
(1) For structures and pipes other than plastic pipe:
(a) Maximum particle size 3 in (75 mm)
(b) Soil classification, AASHTO M 145 A-1, A-2, or A-3
(2) For reinforced soil slopes and plastic pipe:
(a) Maximum particle size 1½ in (37.5 mm)
(b) Soil classification, AASHTO M 145 A-1, A-2-4, A-2-5, or A-3
C. Topsoil Material. Topsoil material may be existing material that is conserved from excavated areas or furnished by the Contractor.
Furnished material must be a fertile, friable, free draining, sandy loam soil that is free of subsoil, refuse, stumps, roots, brush, weeds, rocks larger than 1 inch (25 millimeters), or other substances detrimental to the development of vegetative growth. Demonstrate that the soil can sustain healthy crops of grass, shrubs, or other plant growth. Conform to the following:
(1) Texture
(a) Organic matter, AASHTO T 267 3.0 to 10.0 percent
(b) Sand, AASHTO T 88 20 to 70 percent
(c) Silt, AASHTO T 88 10 to 60 percent
(d) Clay, AASHTO T 88 5 to 30 percent
(2) pH, AASHTO T 289 6.0 to 8.0
D. Aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
(1) Gradation Table 7D
(2) Liquid limit, AASHTO T 89 25 max.
(3) Plastic limit, AASHTO T 90 Nonplastic
(4) Los Angeles abrasion, AASHTO T 96 40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210 35 min.
(7) Durability index (fine), AASHTO T 210 35 min.
(8) Fractured faces, ASTM D 5821 50% min.
(9) Free from organic matter and lumps or balls of clay
Do not use material that breaks up when alternately frozen and thawed or wetted and dried.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
Table 7D Target Value Ranges for Subbase and Base Gradation
Sieve Size Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11) Grading Designation
A (Subbase) B (Subbase) C (Base) D (Base) E (Base) 2½ inch (63 mm) 100(1) 2 inch (50 mm) 97 – 100(1) 100(1) 100(1)
1½ inch (37.5 mm) 97 – 100(1) 1 inch (25 mm) 65 – 79 (6) 80 – 100 (6) 100(1) ¾ inch (19 mm) 64 – 94 (6) 86 – 100 (6) 100(1)
½ inch (12.5 mm) 45 – 59 (7) ⅜ inch (9.5 mm) 40 – 69 (6) 51 – 82 (6) 62 – 90 (6) No. 4 (4.75 mm) 28 – 42 (6) 40 – 60 (8) 31 – 54 (6) 36 – 64 (6) 36 – 74 (6) No. 40 (425 µm) 9 – 17 (4) 12 – 26 (4) 12 – 26 (4) No. 200 (75 µm) 4.0 – 8.0 (3) 4.0 – 12.0 (4) 4.0 – 7.0 (3) 4.0 – 7.0 (3) 4.0 – 7.0 (3)
(1) Statistical procedures do not apply.
( ) The value in the parentheses is the allowable deviation () from the target values.
E. Gabion Rock. Furnish angular stone from a rock quarry or cut that is hard, durable, free of organic and spoil material, and resistant to weathering and water action. Do not use crushed river rock or rock with rounded surfaces. Conform to the following:
(1) Durability index (course), AASHTO T 210 50 min.
(2) Gradation. Furnish rock with breadth and thickness at least one-third its length.
(a) Maximum dimension 8 in (200 mm)
(b) Minimum dimension 4 in (100 mm)
(3) Los Angeles abrasion, AASHTO T 96 50 percent max.
F. Geotextile Material. Use long-chain synthetic polymers composed of at least 95 percent by mass of polyolefins or polyesters to manufacture geotextile and the threads used in joining geotextile by sewing.
Form the geotextile, including selvedges, into a stable network such that the filaments or yarns retain their dimensional stability relative to each other.
Property values, with the exception of apparent opening size (AOS), in these specifications represent minimum average roll value (MARV) in the weakest principal direction (that is average test results of any roll in a lot sampled for conformance or quality assurance testing must meet or exceed the specified values).
Values for AOS represent maximum average roll values. Conform to the following physical requirements of Table 7G.
Table 7G Separation and Stabilization Geotextile and Geotextile Filter Requirements (1)
Strength and Durability Properties Property Test
Method
ASTM
Units Class 1 Class 2
Type of Geotextile Woven Nonwoven Woven Nonwoven Elongation at break D4632 % < 50 ≥ 50 < 50 ≥ 50 Minimum grab strength
D4632 lb (N) 320 (1420)
(890)
(1110)
(710)
Minimum sewn seam strength
D4632 lb (N) 290 (1290)
(800)
(980)
(620)
Minimum tear strength
D4533 lb (N) 110 (490)
(360)
(400)
(240)
Minimum puncture strength
D6241 lb (N) 620 (2760)
(1910)
(2220)
(1380)
Minimum ultraviolet stability
D4355 % 50% retained strength after 500 hours of exposure
Hydraulic Properties Property Test
Method
ASTM
Units Type A Type B Type C Type D Type E
Minimum permittivity
D4491 s-1 0.7 0.5 0.2 0.1 0.1
Maximum apparent opening size
(AOS)
D4751 Sieve size U.S.
(mm)
No. 40 (0.425)
No. 40 (0.425)
No. 60 (0.250)
No. 40 (0.425)
No. 70 (0.212)
(1) Do not use woven slit film geotextile.
G. Waterline Pipe. Furnish waterline as specified below:
(1) Smooth Wall Polyvinyl Chloride (PVC) Pipe. Furnish pipe and fittings conforming to ASTM D2241. Select PVC 1120, PVC 1220, or PVC 2120 with a minimum wall thickness equal or greater than a standard dimension ratio (SDR) of 21. Furnish pipes bearing the National Sanitation Foundation Seal for use to transport potable water. Furnish joints conforming to the requirements of ASTM D3139 using a restrained rubber gasket conforming to ASTM F477. Furnish solvent cement for pipe and fittings conforming to ASTM D2564.
(2) Steel Pipe. Furnish galvanized steel pipe conforming to ASTM A53, Type F, standard weight class, and plain ends for the designation specified in the contract.
(H) Silt Fence.
(1) Geotextile. Conform to Table 7 of AASHTO M 288.
(2) Posts. Conforming to the following:
(a) Wood posts. Conform to the following:
(1) 1½ inches by 1½ inches by 4 feet (38 millimeters by 38 millimeters by 1.2 meters) minimum dimensions;
(2) Untreated fir, redwood, cedar, or pine, cut from sound timber with no loose or unsound knots; and
(3) Pointed on end driven in ground.
(b) Steel posts. Conform to the following:
(1) 48 inches (1200 millimeter) minimum length;
(2) Cross-section shape that can resist failure from lateral loads (T-shaped, U-shaped, or L-shaped); and
(3) 0.75 pound per foot (1.1 kilograms per meter) minimum mass.
(3) Silt fence reinforcement. Furnish a wire mesh consisting of 14 gauge (1.628-millimeter diameter) steel with mesh spacing of 6 by 6 inches (150 by 150 millimeters) or prefabricated polymeric mesh of equivalent strength.
Hector
Lodi Covert
Dix CatharineMontour
Enfield
Ulysses
Starkey
Reading
Milo
Newfield
Schuyler County
Seneca County
Tompkins County
F T
FT608
F T
F T
FT602
FT604
FT611
FT603
FT605
F T
FT610
F T
.1
9<=H13
Seneca Lake
Cayuga Lake
New York
Not to Scale
Backbone Horse Camp
Auble Pond and Backbone Trail
Green Mountain & Finger Lakes National Forest Service Trough, Hydrant & Culvert Work – Appendix A
'N
'N
Auble
Hawes Woodard
FT608
Allot #
20305 AUBLE
Allot #
20316 HAWES
Allot #
20336 WOODARD
F R
H
V
E S
A R
O A
D
FRH15 BOWER ROAD
USDA, BLM and FS personnel
Green Mountain & Finger Lakes National Forest Service Trough, Hydrant & Culvert Work – Appendix A
AUBLE POND
TROUGH LOCATION
CULVERT LOCATION
!O
Backbone Horse Camp
FRH07 PICNIC AREA ROAD
F R
H
B
U R
N T
H
IL
L R
O A
D F
T
FT610
9:;H03
USDA, BLM and FS personnel
Backbone Trail
Green Mountain & Finger Lakes National Forest Service Trough, Hydrant & Culvert Work – Appendix A
BACKBONE POND
HYDRANT LOCATION
WATERLINE
CULVERT LOCATION
Green Mountain & Finger Lakes National Forest Service 2015 Trough, Hydrant & Culvert Work – Appendix B
Backbone Horse Camp
Backbone Pond
Hydrant Location and Trail to Pond (Waterline Path)
Auble Pond and Backbone Trail
Auble Pond Outlet to Culvert
Auble Pond (Looking East)
Existing Trough
Auble Pond (Looking South)
Auble Pond and Backbone Trail
Backbone Trail Culvert to be Replaced
Backbone Trail
| FLNF Trough, Hydrant & Culvert Work |
| 2-11 |
| 12-14 |
| 15-18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| 25 |
File details come from the government source that posted it. Updated .