AG-1681-S-15-0004-000001_Complete.pdf

PDF 151 KB Posted

Attached to
Finger Lakes Trough, Hydrant, Culvert Work Federal contract opportunity
Solicitation number
AG-1681-S-15-0004
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

AG-1681-S-15-0004-000001 Amendment

View the file

Other files for this federal contract opportunity

Other files attached to Finger Lakes Trough, Hydrant, Culvert Work, newest first.
File Type Posted
AG-1681-S-15-0004-000002_Complete.pdf PDF
Attch_2_DBWD_NY150051_010215_NY51_Heavy_Schuyler_Co.pdf PDF
AG-1681-S-15-0004.pdf PDF
Attch_1_Specs_and_Drawings.pdf PDF
Attch_3_GovtProvidedTechnicalProposalForms.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-1681-S-15-0004

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

24H8

WARREN PA 16365

4 FARM COLONY DRIVE

ALLEGHENY NATIONAL FOREST

USDA FOREST SERVICE

03/06/2015000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/06/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

IGF:OT:IGF

FLNF-FY2015 - Dredging of Auble and Backbone Ponds; Installing Frost-Free Hydrant and

Waterline; Replacement of Water Trough and Line; and Replacement of Two Trail Culverts.

LIST OF CHANGES:

Project Specification Change.

SEE ATTACHED PAGE TO MODIFIY THE SPECIFICATIONS OF THE TYPE OF WATERLINE THAT IS REQUIRED.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

ALAN J. ZERO

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Finger Lakes National Forest 2015 Trough, Hydrant & Culvert Installation ‐ Amendment

PROJECT SPECIFICATIONS

1) Modify the second sentence of the first paragraph of Section 3.B (Trough Installation, Plumbing) to the following:

“The inlet and drainage pipe shall be 1‐1/2” polyethylene waterline.”

2) Modify the second sentence of the second paragraph of Section 4.B (Frost Free Hydrant

Installation, Plumbing) to the following:

“The piping may be polyethylene waterline or galvanized steel.”

AG-1681-S-15-0004-000001
FLNF Trough, Hydrant & Culvert Work _Project Details Amendmant

File details come from the government source that posted it. Updated .