Amendment_02.pdf
PDF 834 KB Posted
- Attached to
- Road Maintenance Services
- Solicitation number
- AG-05M6-S-13-0038
About this file
Amendment 02 corrects the MATOC/BTO Specification Section 881 Mobilization/Equipment Moving and corrects the corresponding Scehdule of Items on each Blanket Task Order (BTO) Attachments 3 through 7.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
SECTION 881F-1- MOBILIZATION/EQUIPMENT MOVING
Revision: 03/2007
881.01 Service Required
A. Mobilization of personnel, equipment, and material to the project site.
B. Moving of equipment ordered by the Government that would result in loss of productivity or could not be worked into contractor’s normal operations.
881.02 Performance Standards
A. Make equipment available for inspection before it is used on National Forest System lands.
B. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.
C. Equipment will be clean and weed free before it arrives on National Forest System lands.
881.03 Location of Work:
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
881.04 Measurement:
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.
881.05
Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 881 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit 881(1) Mobilization Lump Sum 881(2) Mobilization Each 881(3)a Equipment Moving – Tilt-bed with Road Grader Miles 881(3)b Equipment Moving – Tilt-bed with Backhoe Miles 881(3)c Equipment Moving – Tilt-bed with Excavator Miles 881(3)d Equipment Moving – 3 Axle Low boy Loaded Miles With Equipment
AG-05M6-S-13-0038 Project: MBS Road Maintenance MATOC Page 98 of 147
SUB-ITEM
NO. Description Estimated
Quantity Unit Unit Price Total
872(10) Remount Sign 11 Each $_______________ $_______________
872(12) Maintain Marker 10 Each $_______________ $_______________
872(14) Replace Marker Government Furnished 20 Each $_______________ $_______________
881(3)a Equipment Moving – Tilt-bed with Road Grader 40 Miles $_______________ $_______________
881(3)b Equipment Moving – Tilt-bed with Backhoe 40 Miles $_______________ $_______________
881(3)c Equipment Moving - Tilt-bed with Excavator (all sizes) 40 Miles $_______________ $_______________
881(3)d Equipment Moving – 3 Axle Low boy Loaded with Equipment 40 Miles $_______________ $_______________
TOTAL PRICE: $_______________
B.2 PERSONNEL AUTHORIZED TO ISSUE WORK ORDERS
The following personnel are authorized to place and administer work orders under this BTO:
Name, Position, Phone, Email Ron Hausinger, South Zone Engineering, (425) 888-8776, rhausinger@fs.fed.us Santino Pascua, Road Manager, (425) 888-8784, spascua02@fs.fed.us Kamber Box, Civil Engineer, (425) 888-8785, klbox@fs.fed.us
Work Orders can ONLY be issued for those items that are listed and pre-priced in the Schedule of Items in this BTO. Only a warranted FS Contracting Officer is authorized to modify this BTO and any items in the schedule.
Note: Work Orders will include Pay Item Numbers and Quantity of each Subitem ordered. A Work Order will be issued designating the roads to be maintained and the time frame in which the work shall be accomplished. If the contractor fails to perform the ordered work within the timeframe required, the ordered work may be deleted from the contract and performed by other means.
BTO #1, AG-05M6-S-13-0043 (North Bend) MBS Road Maintenance MATOC Page 6 of 101
A. The accepted quantities will be paid at the contract price per unit of measurement for
881(2) Mobilization Each 881(3)a Equipment Moving – Tilt-bed with Road Grader Miles 881(3)b Equipment Moving – Tilt-bed with Backhoe Miles 881(3)c Equipment Moving – Tilt-bed with Excavator Miles 881(3)d Equipment Moving – 3 Axle Low boy Loaded Miles
BTO #1, AG-05M6-S-13-0043 (North Bend) MBS Road Maintenance MATOC Page 74 of 101
Sub-Item No. Description Estimated
Quantity Unit Unit Price Total
872(4)
Install or Replace Post, Government furnished - Carsonite markers, 4x4 treated posts, to dimensions and depths meeting MUTCD standards
5 Each $_______________ $_______________
872(8) Install or Replace Sign Government Furnished 9 Each $_______________ $_______________
872(10) Remount Sign 10 Each $_______________ $_______________
872(12) Maintain Marker 9 Each $_______________ $_______________
872(14) Replace Marker Government Furnished 9 Each $_______________ $_______________
881(3)a Equipment Moving – Tilt-bed with Road Grader 40 Miles $_______________ $_______________
881(3)b Equipment Moving – Tilt-bed with Backhoe 40 Miles $_______________ $_______________
881(3)c Equipment Moving - Tilt-bed with Excavator (all sizes) 40 Miles $_______________ $_______________
881(3)d Equipment Moving – 3 Axle Low boy Loaded with Equipment 40 Miles $_______________ $_______________
TOTAL PRICE: $_______________
B.2 PERSONNEL AUTHORIZED TO ISSUE WORK ORDERS
The following personnel are authorized to place and administer work orders under this BTO:
Name, Position, Phone, Email Ron Hausinger, South Zone Engineering, (425) 888-8776, rhausinger@fs.fed.us Santino Pascua, Road Manager, (425) 888-8784, spascua02@fs.fed.us Kamber Box, Civil Engineer, (425) 888-8785, klbox@fs.fed.us
Note: Work Orders will include Pay Item Numbers and Quantity of each Subitem ordered. A Work Order will be issued designating the roads to be maintained and the time frame in which the work shall be accomplished. If the contractor fails to perform the ordered work within the timeframe required, the ordered work may be deleted from the contract and performed by other means.
Work Orders can ONLY be issued for those items that are listed and pre-priced in the Schedule of Items in this BTO. Only a warranted FS Contracting Officer is authorized to modify this BTO and any items in the schedule.
BTO #2, AG-05M6-S-13-0044 (Enumclaw) MBS Road Maintenance MATOC Page 6 of 107
A. The accepted quantities will be paid at the contract price per unit of measurement for
881(2) Mobilization Each 881(3)a Equipment Moving – Tilt-bed with Road Grader Miles 881(3)b Equipment Moving – Tilt-bed with Backhoe Miles 881(3)c Equipment Moving – Tilt-bed with Excavator Miles 881(3)d Equipment Moving – 3 Axle Low boy Loaded Miles
BTO #2, AG-05M6-S-13-0044 (Enumclaw) MBS Road Maintenance MATOC Page 80 of 107
Quantity Unit Unit Price Total
872(4)
Install or Replace Post, Government furnished
- Carsonite markers, 4x4 treated posts, to dimensions and depths meeting MUTCD standards
8 Each $_______________ $_______________
872(8) Install or Replace Sign Government Furnished 15 Each $_______________ $_______________
872(10) Remount Sign 3 Each $_______________ $_______________
872(12) Maintain Marker 4 Each $_______________ $_______________
872(14) Replace Marker Government Furnished 20 Each $_______________ $_______________
881(3)a Equipment Moving – Tilt-bed with Road Grader 40 Miles $_______________ $_______________
881(3)b Equipment Moving – Tilt-bed with Backhoe 40 Miles $_______________ $_______________
881(3)c Equipment Moving - Tilt-bed with Excavator (all sizes) 40 Miles $_______________ $_______________
881(3)d Equipment Moving – 3 Axle Low boy Loaded with Equipment 40 Miles $_______________ $_______________
TOTAL PRICE: $_______________
B.2 PERSONNEL AUTHORIZED TO ISSUE WORK ORDERS
The following personnel are authorized to place and administer work orders under this BTO:
Name, Position, Phone, Email Ron Hausinger, South Zone Engineering, (425) 888-8776, rhausinger@fs.fed.us Santino Pascua, Road Manager, (425) 888-8784, spascua02@fs.fed.us Kamber Box, Civil Engineer, (425) 888-8785, klbox@fs.fed.us
Work Orders can ONLY be issued for those items that are listed and pre-priced in the Schedule of Items in this BTO. Only a warranted FS Contracting Officer is authorized to modify this BTO and any items in the schedule.
Note: Work Orders will include Pay Item Numbers and Quantity of each Subitem ordered. A Work Order will be issued designating the roads to be maintained and the time frame in which the work shall be accomplished. If the contractor fails to perform the ordered work within the timeframe required, the ordered work may be deleted from the contract and performed by other means.
BTO #3, AG-05M6-S-13-0045 (Skykomish) MBS Road Maintenance MATOC Page 6 of 105
A. The accepted quantities will be paid at the contract price per unit of measurement for
881(2) Mobilization Each 881(3)a Equipment Moving – Tilt-bed with Road Grader Miles 881(3)b Equipment Moving – Tilt-bed with Backhoe Miles 881(3)c Equipment Moving – Tilt-bed with Excavator Miles 881(3)d Equipment Moving – 3 Axle Low boy Loaded Miles
BTO #3, AG-05M6-S-13-0045 (Skykomish) MBS Road Maintenance MATOC Page 78 of 105
Quantity Unit Unit Price Total
872(10) Remount Sign 5 Each $_______________ $_______________
872(12) Maintain Marker 6 Each $_______________ $_______________
872(14) Replace Marker Government Furnished 6 Each $_______________ $_______________
881(3)a Equipment Moving – Tilt-bed with Road Grader 20 Miles $_______________ $_______________
881(3)b Equipment Moving – Tilt-bed with Backhoe 20 Miles $_______________ $_______________
881(3)c Equipment Moving - Tilt-bed with Excavator (all sizes) 20 Miles $_______________ $_______________
881(3)d Equipment Moving – 3 Axle Low boy Loaded with Equipment 20 Miles $_______________ $_______________
TOTAL PRICE: $_______________
B.2 PERSONNEL AUTHORIZED TO ISSUE WORK ORDERS
The following personnel are authorized to place and administer work orders under this BTO:
Jeremy Gill, Civil Engineer, (360) 856-2622, jcgill@fs.fed.us
Work Orders can ONLY be issued for those items that are listed and pre-priced in the Schedule of Items in this BTO. Only a warranted FS Contracting Officer is authorized to modify this BTO and any items in the schedule.
Note: Work Orders will include Pay Item Numbers and Quantity of each Subitem ordered. A Work Order will be issued designating the roads to be maintained and the time frame in which the work shall be accomplished. If the contractor fails to perform the ordered work within the timeframe required, the ordered work may be deleted from the contract and performed by other means.
Name, Position, Phone and E-mail:
Santino Pascua, Road Manager, (425) 888-8784, spascua02@fs.fed.us Jim Mitchell, North Zone Engineering Lead, (360) 856-2620, jbmitchell@fs.fed.us
BTO #4, AG-05M6-S-14-0025 (Mt. Baker) MBS Road Maintenance MATOC Page 6 of 99
A. The accepted quantities will be paid at the contract price per unit of measurement for
881(2) Mobilization Each 881(3)a Equipment Moving – Tilt-bed with Road Grader Miles 881(3)b Equipment Moving – Tilt-bed with Backhoe Miles 881(3)c Equipment Moving – Tilt-bed with Excavator Miles 881(3)d Equipment Moving – 3 Axle Low boy Loaded Miles
BTO #4, AG-05M6-S-14-0025 (Mt. Baker) MBS Road Maintenance MATOC Page 72 of 99
No. Description Estimated Quantity Unit Unit Price Total
842(1)b Vegetation Maintenance - Level 4 Road 5 Mile $________________ $_______________
842(2) Vegetation Maintenance - Level 3 Road 10 Mile $________________ $_______________
842(3) Vegetation Maintenance - Level 2 Road 5 Mile $________________ $_______________
851(2)
Danger Tree Removal, Fall trees outside of roadway, Trees fell on roadway and inside clearing limits are to be removed to outside of roadway
5 Each $________________ $_______________
851(3) Hazard or Obstruction Removal ML 3-5 Roads 4 Miles $________________ $_______________
851(4) Hazard or Obstruction Removal ML 2 Roads 3 Miles $________________ $_______________
861(4)
Recondition/clean traffic gate, repair by welding locking mechanism, remove graffiti, reinstall Government Furnished signs and hardware.
2 Each $________________ $_______________
872(1) Clean Sign Face, return sign by removing surfacing debris, remove graffiti 3 Each $________________ $_______________
872(3) Recondition Sign Face Government Materials 3 Each $________________ $_______________
872(4)
Install or Replace Post, Government furnished
- Carsonite markers, 4x4 treated posts, to dimensions and depths meeting MUTCD standards
3 Each $________________ $_______________
872(8) Install or Replace Sign Government Furnished 4 Each $________________ $_______________
872(10) Remount Sign 10 Each $________________ $_______________
872(12) Maintain Marker 9 Each $________________ $_______________
872(14) Replace Marker Government Furnished 9 Each $________________ $_______________
881(3)a Equipment Moving – Tilt-bed with Grader 30 Miles $________________ $_______________
BTO #5, AG-05M6-S-14-0026 (Darrington) MBS Road Maintenance MATOC Page 5 of 98
No. Description Estimated Quantity Unit Unit Price Total
881(3)b Equipment Moving – Tilt-bed with Backhoe 30 Miles $________________ $_______________
881(3)c Equipment Moving - Tilt-bed with Excavator (all sizes) 30 Miles $________________ $_______________
881(3)d Equipment Moving – 3 Axle Low boy Loaded with Equipment 30 Miles $________________ $_______________
TOTAL PRICE: $_______________
B.2 PERSONNEL AUTHORIZED TO ISSUE WORK ORDERS
The following personnel are authorized to place and administer work orders under this BTO:
Santino Pascua, Road Manager, (425) 888-8784, spascua02@fs.fed.us Jim Mitchell, North Zone Engineering Lead, (360) 856-2620, jbmitchell@fs.fed.us Jeremy Gill, Civil Engineer, (360) 856-2622, jcgill@fs.fed.us
Note: Work Orders will include Pay Item Numbers and Quantity of each Subitem ordered. A Work Order will be issued designating the roads to be maintained and the time frame in which the work shall be accomplished. If the contractor fails to perform the ordered work within the timeframe required, the ordered work may be deleted from the contract and performed by other means.
Work Orders can ONLY be issued for those items that are listed and pre-priced in the Schedule of Items in this BTO. Only a warranted FS Contracting Officer is authorized to modify this BTO and any items in the schedule.
Name, Position, Phone and E-mail:
BTO #5, AG-05M6-S-14-0026 (Darrington) MBS Road Maintenance MATOC Page 6 of 98
A. The accepted quantities will be paid at the contract price per unit of measurement for
881(2) Mobilization Each 881(3)a Equipment Moving – Tilt-bed with Road Grader Miles 881(3)b Equipment Moving – Tilt-bed with Backhoe Miles 881(3)c Equipment Moving – Tilt-bed with Excavator Miles 881(3)d Equipment Moving – 3 Axle Low boy Loaded Miles
BTO #5, AG-05M6-S-14-0026 (Darrington) MBS Road Maintenance MATOC Page 71 of 98
| Amendment 02 |
| Amendment 01 |
| Page 1 |
| Page 2 |
| Page 3 |
| Page 4 |
| Page 5 |
| Page 6 |
| Page 7 |
| Page 8 |
| Page 9 |
| Page 10 - 11 |
| Page 12 |
| IDCode: |
| Page: 1 |
| Pages: 13 |
| AmendNo: 02 |
| EffDate: 07/07/14 |
| ReqNo: |
| ProjNo: |
| IssCode: |
| IssuedBy: USDA Forest Service |
Mt. Baker-Snoqualmie National Forest 2930 Wetmore Ave., Suite 3A Everett, WA 98201
| AdmCode: |
| AdminBy: Same as Block 6 |
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolChgYs: Yes |
| SolChgNo: Off |
| SolAmdNo: AG-05M6-S-13-0038 |
| AmendDate: 06/19/14 |
| ModNo: |
| ModDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: N/A |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of Amendment 02 is as follows: |
a. Replace MATOC page 98 of 147 only. The amended sections are highlighted in yellow.
b. Attachment 3, AG-05M6-S-13-0043, BTO #1 (North Bend), Replace Pages 6 and 74 only.
c. Attachment 4, AG-05M6-S-13-0044, BTO #2 (Enumclaw), Replace Pages 6 and 80 only.
d. Attachment 5, AG-05M6-S-13-0045, BTO #3 (Skykomish), Replace Pages 6 and 78 only.
e. Attachment 6, AG-05M6-S-14-0025, BTO #4 (Mt. Baker), Replace Pages 6 and 72 only.
f. Attachment 7, AG-05M6-S-14-0026, BTO #5 (Darrington), Replace Pages 5-6 and 71 only.
g. All other terms and conditions remain unchanged.
| SignName: | |
| SignTitl: | |
| ContDate: | |
| CoName: BRIAN A. JOHNSON | |
| CoTitle: CONTRACTING OFFICER | |
| CODate: 07/07/14 | |
| 2014-07-07T14:08:03-0700 | |
| bajohnson03@usda.gov |