Cle Elum Dispersed CG Rehab RFQ Construction.pdf

PDF 808 KB Posted

Attached to
Cle Elum Valley Dispersed Campground Rehab
Solicitation number
AG-05GG-S-12-0053
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Amendment 1 Cle Elum Dispersed CG Rehab.docx DOCX document
WA1_dvb.txt TXT text file
fire_clauses_r6-fs-6300-52.doc DOC document
Cle Elum CG Rehab Specifications.docx DOCX document
7 Spec List.docx DOCX document
r6-fs-6300-54.rtf RTF text file
CleValleyDispCmp.pdf PDF
experience_questionaire.doc DOC document
r6-fs-6300-53.rtf RTF text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION PAGE OF PAGES

(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE 1 40

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING

AG-05GG-S-12-0053 9/3/2012 605536

AND/OR DMS REG. 1

5a. ISSUED BY 6. DELIVER BY (Date)

USDA Forest Service, Okanogan-Wenatchee NF, 215 Meloday Lane, Wenatchee WA

98802

60 Calendar Days after NTP

5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION

NAME TELEPHONE NUMBER OTHER (See Schedule)

AREA CODE NUMBER 9. DESTINATION

Mariah Morris, CO

Larry Miller, COR

664-9317

653-1424

a. NAME OF CONSIGNEE

8. TO:

a. NAME b. COMPANY b. STREET ADDRESS

c. STREET ADDRESS c. CITY

d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5A ON OR

BEFORE CLOSE OF BUSINESS

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A.

This request does not commit the Government to pay any costs incurred in the preparation of the

June 1, 2012 by 1630 Pacific Time submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT

PRICE

AMOUNT

(a) (b) (c) (d) (e) (f)

Okanogan-Wenatchee NF

Cle Elum Ranger District

Kittitas County

Cle Elum Valley Dispersed Campground

Rehab

The construction magnitude is estimated between $100,000 and $250,000.

TIN _________________________

DUNS _______________________

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF

a. NAME OF QUOTER SIGN QUOTATION QUOTATION

b. STREET ADDRESS 16. SIGNER

a. NAME (Type or print) b. TELEPHONE

c. COUNTY AREA CODE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 2 of 40 Page 2 of 40

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

Cle Elum Valley Dispersed Campground Rehab

Cle Elum R.D.

Okanogan-Wenatchee N.F.

Kittitas County

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization Lump Sum 1 $ ________ $ ________

21001 Soil Scarification Hour 31 $ ________ $ ________

21106 Roadway Obliteration – Method 1 LF 4680 $ ________ $ ________

32203 Crushed Aggregate Grading S(1-1/2” minus), Compaction CY 35 $ ________ $ ________

62201A Rental Equipment, Excavator - Large Hour 55 $ ________ $ ________

62201B Rental Equipment, Excavator - Mini Hour 20 $ ________ $ ________

62201C Rental Equipment, Backhoe Hour 12 $ ________ $ ________

62601A Log Delivery – USFS Source Each 42 $ ________ $ ________

62601B Log Delivery - Commercial Source Each 94 $ ________ $ ________

62601C Log Structure - Cluster Each 21 $ ________ $ ________

62602 Log Structure – Flow path Hour 25 $ ________ $ ________

63001 Rock Barriers Each 191 $ ________ $ ________

Total Cost $ ________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

Hourly payment shall be for Items 21101, 62201A, 62201B, 62201C and 62602 only. Hourly rate is considered a loaded rate to include all mobilization, necessary personnel/crews, material, equipment, services, facilities, transportation, fringe benefits, overhead etc. to perform per contract requirements. The ceiling price for hourly line items 21101, 62201A, 62201B, 62201C and 62602 is not to exceed $30,000.00.

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 3 of 40 Page 3 of 40

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 Scope of Contract

This project consists of road decommissioning of existing dispersed campground roads and parking areas. The work includes minor roadway excavation, scarification of areas for seeding, log haul and delivery, placement of wood log clusters, haul and placement of rock barriers plus equipment rental work directed by the engineer.

The Contractor shall utilize products and materials that promote energy conservation, pollution prevention, waste reduction, use of recovered materials, that are environmentally preferable, and are made from biobased materials (e.g. insulating foam, composite panels, and concrete with fly ash) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered.

C.2 Project Location

The project is located on the Cle Elum Ranger District of the Okanogan-Wenatchee National

Forest. The project is located on Forest System Road 4330 between project milepionts 7.9 and

9.0. approximately 25 miles west of Cle Elum, WA. To reach the project travel northwest on

County 903 to the junction with FSR 4330 then continue on FSR 4330 to project sites.

C.3 Price Range

The Government’s estimate is: between $100,000 and $250,000

If contractor’s quote is between $30,000 and $100,000, Alternative Payment Protection is required. Reference I-6 FAR 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JUL

2000). If contractor’s proposal is over $150,000 Bid Guarantee is required. Reference I-5 FAR

52.228-1 BID GUARANTEE (SEP 1996).

C. 3 Terminology

The term “Engineer”, when used in the contract documents, shall refer to the Contracting

Officer’s Representative (COR)

The term “Owner”, when used in the contract documents, shall refer to the Federal Government

(U.S. Forest Service)

C.4 Performance Period

It is anticipated that this contract will be awarded by _September 28, 2012_. Work is to be completed within the following period: October 1, 2012 to October 1, 2013_. The estimated duration of the project is approximately ___4____weeks. 60 calendar days from the Notice of

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 4 of 40 Page 4 of 40

Proceed are allowed for contractor performance. Reference Section F.

C.5 Project Control

Contractor shall submit a proposed work plan, prior to beginning construction, for approval by the Contracting Officer, 60 calendar days have been allowed for the contract.

Contractor is responsible for protecting workers from injury. Refer to FAR 52.236-13, Accident Prevention, for full text.

The Contractor shall confine all operations (including storage of materials) on

Government premises to areas authorized or approved by the Contracting Officer. The

Government is not responsible for loss of or damage to materials or supplies stored on-site during performance of this contract.

Unless otherwise agreed, to prevent the introduction of seeds of noxious weeds onto

National Forest land, Contractor shall ensure all equipment moved onto National Forest land is free of soil, seeds, vegatative matter or other debris that could contain or hold seeds. Contractor shall employ whatever cleaning methods necessary to insure compliance with this provision, and shall notify the Forest Service prior to moving each piece of equipment onto National Forest land. Upon request of Forest Service, arrangements will be made for Forest Service to inspect each piece of equipment prior to being moved onto National Forest land.

C.6 Technical Specifications

References to Standard Specifications in the contract refer to the U.S. Department of

Transportation, “Standard Specifications for Construction of Roads and Bridges on

Federal Highway Projects: FP-03 U.S. Customary Units,” hereafter refered to as FP-03, and are included by reference. The requirements contained in Section 101 through 158 are hereby made a part of this solicitation and any resultant contract.

Supplemental Specifications that amend FP-03 are given on the Supplemental List but are physically attached in Section J. The attachments to the Statement of Work and the

Supplemental Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

Specifications not on the list but referenced by other Standard Specifications, shall also be applicable to this document.

Offerors can access the FP-03 specifications from the website below:

http://www.wfl.fha.dot.gov/design/specs/fp03.htm

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 5 of 40 Page 5 of 40

C. 7 Attachement to Statement of Work/Specifications

U.S. Department of Transportation, “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects: FP-03 U.S. Customary Units,” hereafter refered to as FP-03, are included by reference. The requirements contained in Section

101 through 158 are hereby made a part of this solicitation and any resultant contract.

Special Project Specifications (SPS) that amend FP-03 can be found in this contract.

WSDOT Standard Specifications for Road, Bridge and Municipal Construction are hereby made a part of this solicitation and any resultant contract.

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

C.8 Product Substitution

Any modification of other items, designs, materials, products or equipment made necessary because of a substitution , will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer’s approval of any substitute will not affect the Contractor’s responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 6 of 40 Page 6 of 40

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 7 of 40 Page 7 of 40

SECTION E--INSPECTION AND ACCEPTANCE

E-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-1 Contractor Inspection Requirements (APR 1984)

52.246-12 Inspection of Construction (AUG 1996)

52.246-6 Inspection—Time-and-Material and Labor-Hour (MAY 2001) (Items 21101, 62201A, 62201B, 62201C and 62602 only) http://www.arnet.gov/far/

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 8 of 40 Page 8 of 40

SECTION F--DELIVERIES OR PERFORMANCE

F-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

available. Also, the full text of a clause may be accessed electronically at this/these address(es):

52.242-14 Suspension of Work (APR 1984)

F-2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days after the issuance of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 9 of 40 Page 9 of 40

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 WA Use Tax Clause for Construction Contracts: The Contractor is liable for Use

Tax, in accordance with State of Washington Code 458-20-173, Sub-paragraph (8), which states:

“Thus the use tax applies to all property provided by the federal Government to the Contractor for installation or inclusion in the contract work as well as to all Government provided tooling”.

G.2 Supplemental Definitions: Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:

A. Calendar Days - Every day shown on the calendar, Saturdays, Sundays and holidays included.

B. Change Order - An order issued to the Contractor by the Contracting Officer, pursuant to the

“change” clause included in Section I of this contract, requiring work to be performed, within the general scope of the contract.

C. Clearing Limits - The limits of clearing as designated on the ground, shown on the drawing or designated in the Special Project Specifications.

D. Contract Pay Item - A pay item designated on the bid schedule and described by a specification.

E. Contracting Officer (CO) - The person executing this contract on behalf of the Government, including any duly appointed successor and authorized representatives of the Contracting

Officer acting within the limits of his/her authority.

F. Contracting Officer's Representative (COR) - The on-site contract administrator for the

Contracting Officer. The duties and responsibilities of the Contracting Officer’s

Representatives are defined below in this Section or in a letter of designation issued by the

Contracting Officer.

G. Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.

H. Drawings - The approved documents and reproductions of these documents, including plan and profile sheets, cross sections, site plants, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, and similar documents showing details for construction of a facility.

I. Equipment - All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.

J. Inspector - The person(s) appointed in writing by the Contracting Officer’s Representative to conduct and document inspections according to contract specifications and provisions. The inspector’s authorities are strictly limited, not to exceed the authority to issue to the

Contractor a Notice of Noncompliance.

K. Labor Standards Provisions - Those statutory and regulatory requirements pertaining to the

Contractor’s employees and employment practices.

L. Materials - Any substances for use in the construction of the project and its appurtenances.

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 10 of 40 Page 10 of 40

M. Notice of Noncompliance - A written notice from the Contracting Officer’s representative or inspector which documents, for the Contractor’s attention, specific performance deficiencies.

N. Original Contract Quantities - Those quantities shown in the Schedule of Items as awarded.

O. Right of Way - A general term denoting land, property, or interest therein acquired for or devoted to a road or a construction site.

P. Schedule of Items - Schedule in the contract which contains a listing and description of construction items, quantities, units of measure, method of measurement, unit price and amount.

Q. Special Project Specifications - Specifications which detail the conditions and requirements peculiar to the individual project, including but not limited to CSI format specifications and additions and revisions to Standard Specifications.

R. Specifications - A general term applied to all written directions and requirements pertaining to performance of work.

S. Standard Specifications - Specifications established for Region wide use for construction of facilities which cover most items of work likely to be performed; such as Earthwork, Base

Courses, Pavement, Concrete, etc.

T. Utility Services - Are services such as electricity, gas, steam, water and sewage.

U. Work Order - An order written by the Contracting Officer or Contracting Officer’s

Representative, which directs the Contractor to correct deficient performance. It may also be used to document acceptable completion of units and to approve starting on additional work units.

G.3 Designation of Contracting Officer's Representative:

A. The Contracting Officer will designate an individual as Contracting Officer's Representative

(COR) at time of award. The name will be on the purchase order or designated in a letter/form.

B. The Contracting Officer’s Representative is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the Contracting Officer prior to completion of the contract.

C. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the Contracting Officer’s

Representative provided they do not affect the delivery schedule or performance period stated in the contract.)

D. On all matters that pertain to the contract terms the Contractor must communicate with the

Contracting Officer. Whenever, in the opinion of the Contractor, the Contracting Officer’s

Representative requests effort outside the scope of the contract, the Contractor should so advise the Contracting Officer’s Representative. If the Contracting Officer’s Representative persists and there still exists a disagreement as to proper contractual coverage, the

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 11 of 40 Page 11 of 40

Contracting Officer should be notified immediately, preferably in writing if time permits.

Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

E. The Contracting Officer’s Representative's major duties and responsibilities are contained in the Forest Service Handbook of Contract Administration. The Contracting Officer’s

Representative is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:

1. Approve Change Orders and Modifications

2. Take action to terminate the contract for default or Government convenience.

3. Make contract adjustments under the Differing Site Conditions clause.

4. Grant extensions of contract time.

5. Approve assignment of claims.

6. Make final decisions under the Disputes clause.

7. Make final acceptance under the contract.

8. Make final decisions under the Suspension of Work clause.

9. Make equitable adjustments.

10. Authorize change in amount of Payment Retention.

11. Approve subcontractors.

12. Approve payments with deductions or final payment.

13. Approve use and possession prior to completion.

14. Enforce the warranty provisions.

G. 4 Notification of Subcontracting: The Contractor shall promptly notify the Contracting

Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:

A. The name, address and telephone number of the subcontractor.

B. The date upon which the subcontract was entered into and its duration.

C. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.

D. Documentation of the subcontractor's representative authority.

Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.

G.5 Public Officials Not Personally Liable: There shall be no personal liability upon the

Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them, by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 12 of 40 Page 12 of 40

G.6 Pre-Work Conference: The Contractor shall meet with the Government to discuss contract terms and work performance requirements, Work Progress Schedule, and Fire

Prevention and Suppression Plans. Contractor designated representative or foreman (whomever the Contractor will have on the site) shall be present at the prework conference.

G.7 Government Furnished Property:

The Government will provide the following item(s) of Government property to the Contractor with in accordance with provisions of the ‘Government Property” FAR clause contained elsewhere in the contract. Contractor shall be responsible for all loading, transporting of the following material to be furnished or made available to the contractor unless otherwise designated.

Property to be Furnished Delivery Point Time of Delivery

Trees Roadside locations of 5 sites within 30 miles or less of the project site

July 15 2013

Barriers – Rock Boulders Roadside location on FS Rd.

4330-140 via FS Rd. 4330-

138 within 4 miles of beginning of project site

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 13 of 40 Page 13 of 40

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 FAR 52.236-4 Physical Data (APR 1984)

Data and information furnished or referred to below is for the Contractor’s information. The

Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

A. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by observations and measurements.

B. Weather conditions: Typical NE Washington

H.2 Conformity with Drawings and Specifications: Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is compliance with reasonable and customary manufacturing and construction tolerance.

H.3 Warning Signs and Restrictions: Contractor shall be totally responsible for safety signing, barricades and other signing to maintain a safe site to the public and Government employees.

H.4 Traffic Control: The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public.

Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the

Federal Highway Administration and applicable safety codes. Any road closures shall be limited to 30 minutes or as approved by CO.

The Contractor shall furnish, erect, maintain, and remove when notified any project identification signs shown on the drawings.

Necessary warning signs and guards shall be posted during blasting operation to safeguard the public.

H.5 Emergency Control:

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 14 of 40 Page 14 of 40

A. Contractor's Responsibility for Fighting Fire.

1. The Contractor, under the provisions of FAR clause 52.236-9, Protection of Existing

Vegetation, Structures, Equipment, Utilities and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work.

2. The Contractor may be held liable for all damages and for all costs incurred by the

Government for labor, subsistence, equipment, supplies and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor' agents or employees.

B. Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.

C. Contractor's Responsibility for Responding to Emergencies.

When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment form the work site for emergency work

(anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the Change clause, or under an Emergency

Equipment Rental Agreement. Payment will be made at not less then the current area rates established by the Government. Employees and equipment will be released from emergency operations when other labor and equipment adequate for the protection of the area are obtained.

NOTE: See Fire Plan Requirements referenced in Section J.

H.6 Legal Relations and Responsibilities: Contractor's Responsibility for Utilities - In the event of interruption to utility services because of accidental breakage the Contractor shall promptly notify the utility authority and shall cooperate with that authority in the restoration of service.

H.7 Job Specific Safety Plan: Prior to the prework meeting, the Contractor shall provide a written job specific safety plan that recognizes the inherently hazardous conditions that will exist on this contract. Some of these hazardous conditions are, but not limited to: fall protection, heavy equipment operation, permitted confine space entry, traffic control on haul routes, loading an unloading of materials, site security, noises and dust contract and the use of personal protective equipment (PPE) in the work area. The plan shall be in accordance with OSHA Regulations.

The plan shall include all tasks and related activities anticipated to successfully complete the work.

H.8 Accident Prevention: The Contractor shall provide and maintain work environments and procedures, which will (1) safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities; (2) avoid interruptions of Government operations and delays in project completion dates; and (3) control costs in the performance of this contract. A Safety Plan will be requested before starting work.

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 15 of 40 Page 15 of 40

H.9 Storage of Materials and Equipment: Materials shall be stored to assure the preservation of their quality and fitness for work. Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the

Government shall be restored to a satisfactory condition at the Contractor's expense.

H.10 Landscape Preservation and Hazardous Materials:

A. The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the clearing limits shall be repaired as directed by the Contracting Officer.

B. Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

Pollutants such as fuels, lubricants, bitumen, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

Mechanized equipment shall not be operated in live streams without written approval by the

Contracting Officer.

C. Prevention of Oil Spills - If the Contractor maintains storage facilities for oil or oil products on the Project Area, Contractor shall take appropriate preventive measures to ensure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States.

If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, Contractor shall prepare a Spill Prevention Control and

Countermeasure (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR

112) including certification by a registered professional engineer.

H.11 Use of Premises:

A. The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform this contract in such a manner as not to interrupt or interfere with the conduct of Government business.

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 16 of 40 Page 16 of 40

B. Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on Forest Service land or lands administered by the Forest

Service, the Contractor shall obtain written permission from the appropriate Ranger District.

A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor. If permission is granted, a work order will specify all conditions and requirements. Sanitation facilities shall be provided for all employees of the

Contractor and members of the campsite.

C. It is further stipulated that in addition to clean-up of any campsites, the Contractor shall remove his equipment from National Forest Service land before final acceptance and payment of the contract.

D. The Contractor shall provide and maintain sanitary facilities. There shall be a minimum of one toilet for each ten employees. Solid waste shall be dispose of in accordance with applicable Federal, State and local regulations.

H.12 Use of Roads By Contractor: The Contractor is authorized to use all roads under the jurisdiction of the Forest Service that are open and necessary for direct route access to the contract work sites for all activities necessary to complete this contract. This authorization is subject to the limitations described below, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Keep all non-project roads open to all traffic during contract work, and maintain them in a condition that will adequately accommodate traffic. Contractor shall prevent access to motorized traffic on roads while contract work is in progress. The Contractor shall provide any necessary warning signs and/or other devices complying with National Standards as contained in Part VI of the Manual of Uniform Traffic Control Devices (MUTCD).

The roads authorized for use will be subject to the following provisions:

(a) The current National Forest Road Use Rules Document is applicable to all commercial road users. This document is available for inspection at the office of the Forest Supervisor and shall be applicable except when modified by provisions of this contract.

(b) Federal Regulations contained in 36 CFR 261.54 as applied to the area by an order issued under 36 CFR 261.50. These regulations authorized the Forest Service, as a sovereign act, to issue additional restrictions to those shown in the current Road Use Rules Document and will be posted on the road.

H.13 Washing of Equipment: Pollutants such as fuels, lubricants, bitumen, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 17 of 40 Page 17 of 40

The Contractor shall wash all equipment except for hauling vehicles prior to entering National

Forest Land. Remove all soil which could contain noxious weed seed. Remove grease and oil from drive mechanisms which would be discharged into the stream when equipment is operating.

Prior to transporting equipment to the site, assure that the equipment's hydraulic, lubrication and fuel systems are free from leaks.

H.14 Product Substitution, Shop Drawings and Material Certification: Product

Substitution. Any modification of other items, designs, materials, products or equipment

(including Government-Furnished Property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The

Contracting Officer’s approval of any substitute will not affect the Contractor’s responsibility for such modification. All substitutions shall be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

H.15 Payments for Incidental Items: The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered incidental to and included in the payment for items shown.

H.16 Costing of Claims or Modifications: The cost principles and procedures in Subpart

31.2 of the Federal Acquisition Regulations shall be used in the pricing of contract claims and modifications, and for determining costs under terminated contracts, except, where actual costs can be determined from the Contractor's accounting records. Allowable ownership and operating costs for owned or rented equipment shall be determined from “The Construction Equipment

Ownership and Operating Expense Schedule”, U.S. Army Corps of Engineers Publication EP

1110-1-8, published by the U.S. Government Printing Office, to the extent that this publication contains a listing of the equipment being priced, or of similar equipment. During periods of suspension of work pursuant to a contract clause, the allowance for equipment ownership shall not exceed the amount for standby cost as determined by this schedule.

H.17 Hazardous Materials: Contractor shall notify the Government of any hazardous materials and or waste (as defined in 29 CFR 1910.1200) to be used on the job and will have

Material Safety Data Sheets (MSDS's) for those materials available on the job. All such materials shall be labeled in accordance with Federal and State regulations.

If Contractor maintains storage facilities for oil or oil products in the contract area, Contractor shall take appropriate preventive measures to insure that any releases of such oil or oil products does not enter any stream or other waters, or ground of the United States, or any of the individual

States and shall conform to Federal, State, and Local regulations.

If the total oil or oil products storage exceeds 1,320 gallons, or if any single container exceeds a capacity of 660 gallons, Contractor shall prepare and implement a Spill Prevention Control and

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 18 of 40 Page 18 of 40

Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR

112) including certification by a registered professional engineer.

Contractor shall immediately take action to notify appropriate agencies including Contracting

Officer, or designated representative, contain, and cleanup without expense to the Government, all petroleum products or other hazardous substance (as defined in 29 CFR 1910.120) releases on/or in the vicinity of the project of construction operations. Contractor shall be held liable for all damages and costs of additional labor, subsistence, equipment, supplies and transportation deemed necessary by the Government for the containment and cleanup of petroleum products releases caused by Contractor’s employees or resulting from construction operations.

All petroleum products or other hazardous substances shall not be released on or into land or into rivers, streams, and impoundments, or into natural or manmade channels leading thereto.

Servicing of all equipment shall be done only in the areas approved by Contracting Officer or designated representative. Contractor shall properly dispose of vehicle oil filters (drained of free-flowing oil), oily rags, and waste oil in accordance with Local, State, and Federal regulations off of Government property and shall transport such material in accordance with

State and Federal regulations.

H.18 Construction Stakes, Lines and Grades:

A. Unless a Pay Item for Construction Staking is included in the Schedule of Items, the

Government will set initial construction stakes establishing control points, centerlines and/or shoulders for road and parking lot and will furnish the Contractor with all necessary information relating to lines, slopes, and grades.

B. These stakes and control points shall constitute the field control from which the Contractor shall establish other necessary controls and execute the work. If any construction control points have been destroyed or displaced or are erroneous, the Contractor shall promptly notify the Contracting Officer.

C. The Contractor is responsible for the preservation of all stakes and control points. The cost of replacing them will be charged to the Contractor when destroyed due to Contractor's negligence or operation.

In the case of alterations which involve any changes in construction staking, the Contractor shall cooperate with the Contracting Officer and facilitate the prompt re-establishment of the field control for the altered or adjusted work.

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 19 of 40 Page 19 of 40

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.usda.gov/procurement/policy/agar.html

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

(FEB 2012)

52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (DEC 2010)

52.211-18 Variation in Estimated Quantity (APR 1984)

52.219-6 Notice of Total Small Business Set-Aside (NOV 2011)

52.219-28 Post-Award Small Business Program Representation (APR 2012) 52.222-3 Convict Labor (JUN 2003)

52.222-6 Davis-Bacon Act (JUL 2005)

52.222-7 Withholding of Funds (FEB 1988)

52.222-8 Payrolls and Basic Records (JUN 2010)

52.222-9 Apprentices and Trainees (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements (FEB 1988)

52.222-11 Subcontracts (Labor Standards) (JUL 2005)

52.222-12 Contract Termination - Debarment (FEB 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)

52.222-14 Disputes Concerning Labor Standards (FEB 1988)

52.222-15 Certification of Eligibility (FEB 1988)

52.222-20 Walsh-Healy Public Contracts Act (OCT 2010)

52.222-21 Prohibition of Segregated Facilities (FEB 2009)

52.222-26 Equal Opportunity (MAR 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)

52.222-35 Equal Opportunity for Veterans (SEP 2010)

52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010)

52.222-37 Employment Reports Veterans (SEP 2010)

52.222-50 Combating Trafficking in Persons (FEB 2009)

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction

Contracts (DEC 2007)

52.223-6 Drug-Free Workplace (MAY 2001)

52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving http://www.usda.gov/procurement/policy/agar.html

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 20 of 40 Page 20 of 40

(AUG 2011)

52.224-1 Privacy Act Notification (APR 1984)

52.224-2 Privacy Act (APR 1984)

52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)

52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)

52.228-2 Additional Bond Security (OCT 1997)

52.228-11 Pledges of Assets (JAN 2012)

52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995)

52.228-14 Irrevocable Letter of Credit (DEC 1999)

52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002)

52.232-7 Payments under Time-and-Material and Labor-Hour Contracts (FEB 2007)

52.232-23 Assignment of Claims (JAN 1986)

52.232-27 Prompt Payment for Construction Contracts (OCT 2008)

52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT

2003)

52.233-1 Disputes (JUL 2002)

52.233-3 Protest After Award (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)

52.236-5 Material and Workmanship (APR 1984)

52.236-6 Superintendence by the Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991)

52.236-8 Other Contracts (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (APR 1984)

52.236-10 Operations and Storage Areas (APR 1984)

52.236-11 Use and Possession Prior to Completion (APR 1984)

52.236-12 Cleaning Up (APR 1984)

52.236-13 Accident Prevention (NOV 1991)

Alternate I (NOV 1991)

52.236-15 Schedules for Construction Contracts (APR 1984)

52.243-5 Changes and Changed Conditions (APR 1984)

52.244-6 Subcontracts for Commercial Items (DEC 2010)

52.246-21 Warranty of Construction (MAR 1994)

Alternate I (APR 1984)

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From)

(APR 1984)

52.249-10 Default (Fixed-Price Construction) (APR 1984)

52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts

(NOV 1996)

452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 21 of 40 Page 21 of 40

452.236-72 Use of Premises (NOV 1996)

452.236-73 Archeological or Historic Sites (FEB 1988)

452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)

452.236-76 Samples and Certificates (FEB 1988)

452.236-77 Emergency Response (NOV 1996)

I-2 52.204-7 CENTRAL CONTRACTOR REGISTRATION (FEB 2012)

(a) Definitions. As used in this clause—

“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by

Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System +4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative

Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the

Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the

Government as a part of the CCR registration process.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS +4” followed by the DUNS or DUNS +4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United

States; or https://www.acquisition.gov/far/current/html/Subpart%2032_11.html#wp1043964 http://fedgov.dnb.com/webform

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 22 of 40 Page 22 of 40

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.

The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company Physical Street Address, City, State, and ZIP Code.

(iv) Company Mailing Address, City, State and ZIP Code (if separate from physical).

(v) Company Telephone Number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the

CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the

Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)

(1)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible

Contracting Officer a minimum of one business day’s written notification of its intention to

(A) change the name in the CCR database; (B) comply with the requirements of Subpart 42.12 of the FAR; and (C) agree in writing to the timeline and procedures specified by the responsible

Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

https://www.acquisition.gov/far/current/html/Subpart%2042_12.html#wp1084217 https://www.acquisition.gov/far/current/html/Subpart%2042_12.html#wp1084217

AG-05GG-S-12-0053 Cle Elum Valley Dispersed Campground Rehab Page 23 of 40 Page 23 of 40

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .