Cle Elum CG Rehab Specifications.docx

DOCX document 95 KB Posted

Attached to
Cle Elum Valley Dispersed Campground Rehab
Solicitation number
AG-05GG-S-12-0053
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
Amendment 1 Cle Elum Dispersed CG Rehab.docx DOCX document
WA1_dvb.txt TXT text file
Cle Elum Dispersed CG Rehab RFQ Construction.pdf PDF
fire_clauses_r6-fs-6300-52.doc DOC document
7 Spec List.docx DOCX document
r6-fs-6300-54.rtf RTF text file
CleValleyDispCmp.pdf PDF
experience_questionaire.doc DOC document
r6-fs-6300-53.rtf RTF text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M Table of Contents

Table of Contents1
Preface3
101 - Terms, Format, and Definitions3
101.01 Meaning of Terms3
101.03 Abbreviations.3
101.04 Definitions.4
102 - Bid, Award, and Execution of Contract7
102 Bid, Award, and Execution of Contract7
103 - Scope of Work7
Deletions7
104 - Control of Work7
Deletions7
104.06 Use of Roads by Contractor7
105 - Control of Material8
105.02 Material Sources.8
105.02(a) Government-provided sources.8
105.05 Use of Material Found in the Work.8
106 - Acceptance of Work8
106.01 Conformity with Contract Requirements.8
106.07 Delete10
107 - Legal Relations and Responsibility to the Public11
107.05 Responsibility for Damage Claims.11
107.06 Contractor’s Responsibility for Work.11
107.09 Legal Relationship of the Parties.11
107.10 Environmental Protection.11
108 - Prosecution and Progress12
108 Delete.12
109 - Measurement and Payment12
109 Deletions12
109.02 Measurement Terms and Definitions.12
153 - Contractor Quality Control13
153.04 Records.13
155 - Schedules for Construction Contracts13
155 Delete.13
157 - Soil Erosion Control13
157.03 General13
171 - Weed and Disease Prevention14
201 - Clearing and Grubbing16
201.02 Material:16
210 – Soil Scarification16
211 - Roadway Obliteration17
211.01. Description.17
211.02 Construction Requirements.18
322 – Aggregate Base18
622 - Rental Equipment25
622.02Rental Equipment25
626 – Log Delivery and Log Structures25
630 – Barriers – Rock Boulders27
718 - Traffic Signing and Marking Material28
718.05 Aluminum Panels28

Preface Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp
Milepost
ppm
Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005 102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat_us_02_16_2005 Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat_us_06_16_2006 Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005 Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work 106.01_nat_us_07_31_2007

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

· Exact time and location of spill including a description of the area involved.

· Containment procedures.

· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_nat_us_02_16_2005 108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment 109.00_nat_us_02_17_2005 109 Deletions Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

153 - Contractor Quality Control 153.04_nat_us_10_24_2007

153.04 Records.

Delete all but the first sentence

155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004 155 Delete.

Delete Section 155 in its entirety.

157 - Soil Erosion Control 157.03_nat_us_02_24_2005

157.03 General

Delete the entire subsection and replace with the following:

Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted 30 days before intended use.

Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.

When erosion control measures are not functioning as intended, immediately take corrective action.

171 - Weed and Disease Prevention 171.00_nat_us_03_30_2005 Description

171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands.

Material

171.02 Conform to the following Subsection:

Water 725.01

Construction Requirements

171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.

Perform all work at a location designated on the plans or other locations approved in writing. Provide the CO with an opportunity to monitor the washing and inspection.

171.04 Equipment. Use a high pressure washing system.

For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner. Do not mix soaps, detergents, or other chemicals with the wash water.

For work at a commercial washing facility, use an approved facility.

171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.

171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed.

171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.

Measurement

171.08 Do not measure weed prevention for payment.

Payment

171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for Section 151-Mobilization.

201 - Clearing and Grubbing 201.00_nat_us_08_05_2009

201.02 Material:

Delete Tree wound dressing material reference.

201.03 General.

Delete the last sentence.

201.04 Clearing.

Delete the last sentence of (d).

201.04_nat_us_02_22_2005

201.04 Clearing.

Delete subsection (d) and replace with the following:

(d) Do not cut vegetation less than 3 feet tall and less than 3 inches in diameter, that is within the clearing limits but beyond the roadway and not in a decking area, and that does not interfere with sight distance along the road.

Add the following:

(e) Trim branches of remaining trees or shrubs to give a clear height of 14 feet above the roadbed unless otherwise indicated. Trim tree limbs as near flush with the trunk as practicable.

(f) Remove brush from log decks. Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage, and will not roll. Keep logs in log decks free of brush and soil.

210 – Soil Scarification 210.00_R6_Ok-Wen_08_16_2012

Description

210.01 This work consists of scraping, or shallow excavation of surface ground areas to loosen soil materials prior to planting. Work includes scraping down to a specified depth AS SHOWN ON THE DRAWINGS.

Construction Requirements

210.02 General Lightly excavate the ground surface to approximate the original ground contours. Keep excavated material within the original construction or staked limits. Finish slopes to provide gradual transitions in slope adjustments without noticeable breaks. Protect vegetation as mush as practical and avoid marking or scarring timber with operating equipment.

Measurement

210.03 Measure the Section 210 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

210.04 The accepted quantities will be paid at the contract price per unit of measurement for the Section 210 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

211 - Roadway Obliteration 211.01_nat_us_08_05_2009

211.01. Description.

Add the following to the first sentence:

and revegetate all disturbed areas.

Delete the definition for (b) Method 2 and replace with the following:

Obliterate the first 150 feet of the roadway by restoring to approximate original ground contours. Keep excavated material within the original construction limits. Loosen the roadbed by ripping to a minimum of 18 inches. Remove all existing culverts and drainage structures. Remove and slope embankment material at localized drainages to restore natural drainage patterns. Construct driveable waterbars at designated locations. Scatter any available slash on obliterated roadway.

Add the following roadway obliteration methods:

(c) Method 3. Loosen the roadbed by scarifying to a maximum depth of 3 inches. Construct driveable waterbars at designated locations. Scatter any available slash on obliterated roadway. Eliminate all ruts and low spots that could hold water. Effectively close the road by installing or maintaining a gate, constructing a rock barrier or obliterating the first 150 feet of roadway to approximate ground contour.

(d) Method 4. Grade the roadbed to eliminate all ruts and low spots that could hold water. Close the road by installing or maintaining a gate.

211.02_nat_us_02_25_2005

211.02 Construction Requirements.

Add the following:

Limit disturbance to soils and vegetation. Slope all areas to drain and return water to natural watercourses. After removing pipes and bridges, obtain approval from CO before continuing work. Remove all fill material to the natural channel. Treat slash and clearing debris according to Subsection 203.05.

211.02 (a) Rigid material.

Add the following:

(3) Pipes and Bridges. Remove structures such as pipes and bridge components according to Subsection 203.05(a), or as approved.

322 – Aggregate Base 324.00_nat_us_10_14_2011 Description

322.01 This work consists of constructing one or more courses of aggregate on a prepared surface. Work includes producing aggregate by grid rolling, screening, or crushing methods, or placing pit-run or Government-furnished aggregate.

Surface aggregate grading is designated as shown in Table 703-3.

Subbase and base aggregate grading is designated as shown in Table 703-2.

Screened aggregate grading is designated as shown in Table 703-16.

Material

322.02 Conform to the following Subsections:

Aggregate703.05
Water725.01

322.03 General. Prepare the surface on which the aggregate course is placed according to Section 204 or 303 as applicable.

Request approval of the roadbed in writing before placing aggregate.

Develop, haul, and apply water in accordance to Section 170.

Submit target values within the gradation ranges shown in Table 703-2 or 703-3 for the required grading. After reviewing the proposed target values the CO will determine the final values for the gradation and notify the Contractor in writing.

No quality requirements or gradation other than maximum size will be required for pit run and grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size.

After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.

If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320. Establish stockpile sites at approved locations.

322.04 Mixing and Spreading. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for the specified compaction method. Spread and shape the mixture on the prepared surface in a uniform layer with no segregation of size, and to a loose depth that will provide the required compacted thickness.

Do not place in layers exceeding 6 inches in compacted thickness for aggregate base and surface courses or twice the maximum particle size for screened aggregate. When more than one layer is necessary, compact each layer according to Subsection 322.05 before placing the next layer. Route hauling and leveling equipment uniformly over the full width.

When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.

322.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

Compaction A. Operating spreading and hauling equipment over the full width of the travelway.

Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

Compaction E. Removed.

Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

Compaction G. Removed.

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

322.06 Construction Tolerance. If grade finishing stakes are required, finish the surface to within ±0.10 feet from staked line and grade elevation.

If grade finishing stakes are not required, shape the surface to the required template and check the surface with a 10-foot straightedge. Defective areas are surface deviations in excess of 1/2 inch in 10 feet between any two contacts of the straightedge with the surface.

Correct all defective areas by loosening the material, adding or removing material, reshaping, and compacting.

Ensure that the compacted thickness is not consistently above or below the specified thickness. The maximum variation from the compacted specified thickness is ½ inch.

Ensure that the compacted width is not consistently above the specified width. The maximum variation from the specified width will not exceed +12 inches at any point.

322.07 Maintenance. Maintain the aggregate course to the correct line, grade, and crosssection by blading, watering, rolling, or any combination thereof until placement of the next course. Correct all defects according to Subsection 322.06.

322.08 Acceptance. See Table 322-1 or Table 322-2 as applicable, for sampling and testing requirements.

Aggregate gradation and surface course plasticity index will be evaluated under Subsection 106.04. If the aggregate is obtained from a Government stockpile then the above characteristics will be evaluated under Subsection 106.02. Other aggregate quality properties will be evaluated under Subsections 106.02 and 106.04. Placement of aggregate courses will be evaluated under Subsections 106.02 and 106.04.

The allowable upper and lower aggregate gradation limits are the Target Value plus or minus the allowable deviations shown in Tables 703-2 and 703-3.

The allowable upper and lower Plasticity index limits for surface courses are stated in 703.05(b).

Preparation of the surface on which the aggregate course is placed will be evaluated under Section 204 or 303 as applicable.

Measurement

322.09 Measure the Section 322 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

Measure square yard width horizontally to include the top of aggregate width including designed widening. Measure the square yard length horizontally along the centerline of the roadway.

If the measurement for aggregate is by cubic yard using contract quantities then measure aggregate by the cubic yard in-place once compacted, otherwise measurement for aggregate by the cubic yard is measured by the cubic yard in the hauling vehicle.

Measure thickness perpendicular to the grade of the travelway.

Measure width perpendicular to the centerline.

322.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 322 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Table 322-1 Sampling and Testing Requirements

Reporting Time
Before using

in work

“
“
“
48 hours

Split Sample

Yes, when requested
“
“
“
Yes
Point of Sampling
Source of

material

“
“
“
From windrow or roadbed after processing or from approved crusher sampling device

Sampling Frequency 1 per type & source of material

“
“
“
2 per day
Test Methods Specifications
AASHTO T 96
AASHTO T 104
AASHTO T 210
ASTM D 5821
AASHTO T 2
Category
—
—
—
—
—
Characteristic
LA abrasion (coarse)
Sodium sulfate soundness loss (coarse & fine)
Durability index (coarse & fine)
Fractured faces
Sample
Type of Acceptance (Subsection)
Measured and tested

for conformance (106.04 & 105) Measured and tested for conformance (106.04)

Material or Product
Aggregate source quality

703.05 Subbase, Base, and Surface courses

Table 322-1 (continued)

Reporting Time

Before using in work
“
“
“
Before placing next layer
(1) Minimum of 5 points per proctor.

Split

Yes, when requested
“
“
“
—
Point of Sampling
Source of material
“
“
“
In-place

Sampling

1 per type and source of material
“
“
“
3 per day
Test Methods Specifications
AASHTO T 99 (1)

AASHTO T 180(1)

AASHTO T 310 or other approved procedures

Category
—
—
—
—
—
Characteristic
Moisture-density Method D

Moisture-density Method F

In-place density & moisture content

Type of Acceptance (Subsection)
Measured and tested

for conformance (106.04)

Material or Product
Subbase, Base, and Surface

Table 322-2

Reporting Time
48 hours

Split

Yes

Point of Sampling
From windrow or roadbed after processing or from approved crusher sampling device

Sampling

2 per day

Test Methods Specifications
AASHTO T 2
Category
—
Characteristic
Sample
Type of Acceptance (Subsection)
Measured and tested

for conformance (106.04 )

Material or Product
Screened Aggregate

622 - Rental Equipment 622.02_06_us_08_20_2009

622.02 Rental Equipment

Add the following:

Provide a track mounted hydraulic excavator. Equipment must be reasonably free of leaks and other mechanical deficiencies and not older than 15 years.

Bucket must be equipped with a hydraulic “thumb”. An excavator capable of performing the excavation and boulder placement needs for this project will be of an adequate size to be acceptable for any work that the Contractor may be directed to perform under this section.

626 – Log Delivery and Log Structures 626.00_R6_Ok-Wen_08_16_2012

Delete Section 626 in its entirety and replace with the following:

Description

626.01 This work consists of supplying logs to the project sites AS SHOWN ON THE DRAWINGS. The work includes loading logs from National Forest lands at specified locations and hauling to project locations under Log Delivery-USFS Source Item 62601A and loading logs from commercial sources and hauling to project locations under Log Delivery-Commercial Sources Item 62601B.

Work for Log Structures-Cluster Item 62601C consists of constructing a random pattern of logs to produce a 3 – 4 log structure and includes moving logs from log decks at the road shoulder and yarding to specific project sites AS SHOWN ON THE DRAWINGS and as marked in the field by the Engineer.

Work for Log Structures-Flow Path Item 62602 consists of constructing a random pattern of logs to produce a 3 – 4 log structure and includes moving logs from log decks at the road shoulder and yarding to specific project sites AS SHOWN ON THE DRAWINGS and as marked in the field by the Engineer.

Material

626.02 Logs for USFS Sources are trees are felled on the ground and are located at various locations on National Forest lands as listed on the Log Source map sheet. Felled trees are typically 12 – 30 inches in diameter and 35 – 70 ft. lengths. Logs shall be cut to lengths of 8-15 ft. as specified for the log structures.

Logs from Commercial Sources shall be sound wood with no rot and free of limbs. Log size shall be typically 12 – 30 inches in diameter and 8 – 30 ft. lengths. Logs shall be cut to lengths of 8-15 ft. as specified for the log structures.

626.03 Log Delivery-USFS Sources. Work includes moving trees to hauling equipment for loading onto vehicles and/or trailers for transport to project sites. Downed trees require removal of limbs and cutting to specified 8 – 15 foot lengths as required for the Log Structure-Cluster Item 62601C and Log Structure–Flow Path Item 62602 pay items. Alternatively longer trailer length logs may be hauled to project sites and cut to contract specified lengths after decked.

626.04 Log Delivery-Commercial Source. Logs of 8 – 15 foot lengths as required for Log Structure-Cluster Item 62601C and Log Structure–Flow Path Item 62602 pay items shall be delivered to project sites as specified. Alternatively longer trailer length logs may be hauled to project sites and cut to specified lengths after decked.

Decking of logs at project sites shall be at locations as marked by the Engineer. Protect existing trees from damage when unloading and decking logs.

626.05 Log Structure-Cluster. Logs placement shall follow the guidelines from plan sheets AS SHOWN ON THE DRAWINGS. Logs shall be placed on the ground surface to a generic pattern with portions of logs partially buried. Initial arrangement of logs shall be as directed by the Engineer.

Estimated time for complete placement is 1-2 hours for each log structure

626.06 Log Structures-Flow Path. Log placement shall follow the guidelines from plan sheets AS SHOWN ON THE DRAWING. Logs shall be placed on the ground surface to an angular pattern with portions of logs partially buried. Arrangement and completion of the Log Structure – Flow Path shall be as directed by the Engineer.

Protect existing trees and vegetation from damage when constructing log structures.

Measurement

626.07 Measure the Section 626 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

626.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 626 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

630 – Barriers – Rock Boulders 630_Oka-Wen_08_17_2012

Description

630.01 This work consists of furnishing and placing boulders to create rock barriers.

Material

630.02 Furnish sound, durable rock that is native to the vicinity of the work or is similar in texture and color to the native rock and has been proven satisfactory for the intended use.

Construction Requirements

630.03 General This work shall consist of loading, hauling and placing rock traffic barriers to project site locations as marked on the ground by the Engineer.

Rock acceptable for this work is available from the specified rock pit source.

Select rocks to provide height AS SHOWN ON THE DRAWINGS. Rocks shall be loaded, transported and placed in a manner that will protect the rocks from breaking. The placement location shall be excavated to a depth which will result in the rock being set 1/3 to 1/2 its volume below ground elevation AS SHOWN ON THE DRAWINGS. Backfill around rocks after placement to restore the excavation to natural ground contours.

Excavator bucket shall be equipped with a hydraulic “thumb” attachment to allow optimal positioning of the rock barriers.

Measurement

630.04 Measure the Section 630 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

630.05 The accepted quantities will be paid at the contract price per unit of measurement for the Section 630 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

718 - Traffic Signing and Marking Material 718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.