J-3b_Worklist_2360200_RS_041014.xls

XLS spreadsheet 196 KB Posted

Attached to
Road Decommissioning (2014-2019), Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
AG-05G2-S-14-0007
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

J-3b Worklist FSR 2360200

View the file

Other files for this federal contract opportunity

Other files attached to Road Decommissioning (2014-2019), Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Amendment_No_001.pdf PDF
J-7a_Bid_Bond_SF_24.pdf PDF
J-2_Experience_Questionnaire.pdf PDF
Solicitation_AG-05G2-S-14-0007.pdf PDF
J-7b_Payment_Bond_SF_25a.pdf PDF
J-2_Specifications.pdf PDF
J-6_Fire_Plan.pdf PDF
J-3a_Vicinity_Map_ _Traffic_Control_Plan.pdf PDF
J-1_Task_Order_No_001_Road_2360200_Decommissioning.pdf PDF
J-4_Contract_Drawings.pdf PDF
J-3cd_Stream_Crossing_Worksheets.pdf PDF
J-7c_Performance_Bond_SF_25.pdf PDF
J-5_Davis_Bacon_Wage_Determination.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2360200

STATIONWAYPOINTPHOTOSFILLSLOPE PULLBACKSTREAM CROSSING REMOVAL AND RESTORE NATURAL DRAINAGECROSS DITCH
D1 (ft)D2 (ft)VOLUME (yds³)BOTTOM WIDTH (ft)VOLUME (yds³)RIPRAP VOLUME (yds³)BOTTOM WIDTH (ft)SKEW (degrees)RIPRAP VOLUME (yds³)
FSR 2360200 MP 0.0 to 2.0.
0+00200_12360200_01Junction 2360200 at 2360000 (MP 1.35). BOP. Road Decommission.
0+50Remove existing double berm and trench.
3+50200_3Junction with Unclassified Spur C.
5+00Begin Road Treatment. Begin 18 inch deep Scarification . Construct Type 1 Barrier.
6+25200_4Remove 18" Ditch Relief Culvert.
8+50End Scarification. Begin Fillslope Pullback.
200_5610280
12+00End Fillslope Pullback.
12+35200_6Large Stream Crossing Removal - 24" Culvert.
8870
13+00 to 14+00Landing. Potential Disposal Site.
14+75Restore Natural Drainage.
8280
15+00Begin Fillslope Pullback.
612210
17+10End Fillslope Pullback.
17+42200_7Remove 18" Ditch Relief Culvert.
17+75Begin Fillslope Pullback.
610190
20+00End Fillslope Pullback.
21+50Begin Fillslope Pullback.
68240
25+00End Fillslope Pullback.
25+30200_8Restore Natural Drainage.
6390
27+00 to 29+00200_9Landing. Potential Disposal Site.
34+00Begin Fillslope Pullback.
6650
35+00End Fillslope Pullback.
35+50Begin Fillslope Pullback.
4680
38+00Change Fillslope Pullback.
88160
40+00End Fillslope Pullback.
44+00Begin Fillslope Pullback.
610110
45+25End Fillslope Pullback.
45+502360200_02 - 2360200_04Restore Natural Drainage. Outside portion of road gone for 75 feet.
6110
46+25Begin Outslope.
48+50200_112360200_05 - 2360200_09End Outslope. Road gone for 50 feet and will require construction of temporary access.
49+00Begin Outlsope.
49+75 to 51+00Inside 4 feet of road and ditch covered with shale from cutslope ravel.
53+25200_122360200_10, 2360200_11Reference Tree located on outside edge of road - marked with orange and silver metal tags. Retain.
56+75End Outslope.
57+00200_13Restore Natural Drainage.
8150
58+50Begin Outslope.
59+70End Outlsope.
59+92200_142360200_12Small Stream Crossing Removal - 18" Culvert.
8250
61+00Begin Outlsope.
63+00End Outslope. Outside edge of road gone.
63+50Restore Natural Drainage.
12220
68+00Begin Outslope.
69+25200_152360200_13 - 2360200_19End Outslope. Next 75 feet of road gone and will require construction of temporary access.
71+35200_162360200_20 - 2360200_23Small Stream Crossing Removal - 18" Culvert. Inlet buried with debris.
10260
72+91200_172360200_24 - 2360200_32Small Stream Crossing Removal - 18" Culvert.
10220
74+502360200_33Outside 4 foot edge of road gone.
75+25 to 77+00200_18Landing. Potential Disposal Site.
78+00Begin Outslope.
80+00End Outlsope.
80+00 to 81+00Landing. Potential Disposal Site.
81+44200_19Large Stream Crossing Removal - 36" Culvert.
152090
88+40200_202360200_34 - 2360200_36Begin Outslope. Outer 1/3 edge of road gone.
90+00End Outslope.
91+74200_212360200_37 - 2360200_43Large Stream Crossing Removal - 18" Culvert. Culvert inlet is plugged with debris. 1/2 road gone and will require construction of temporary access.
12650
92+00Begin Outslope.
96+40End Outslope.
96+60200_222360200_44 - 2360200_46Large Stream Crossing Removal - 24" Culvert.
10740
96+80Begin Outslope.
98+50End Outslope.
98+75200_232360200_47 - 2360200_49Small Stream Crossing Removal - 30" Culvert. Road fill gone over pipe and will require construction of temporary access.
10/14300
99+85200_242360200_50 - 2360200_52Large Stream Crossing Removal - 36" Culvert.
161530
100+00 to 102+002360200_53, 2360200_54Heavy ditch scour 4-6 feet wide by 3-4 feet deep. Construction of temporary access may be required to access road beyond this point.
103+27200_25Large Stream Crossing Removal - 18" Culvert. Inlet plugged with debris.
12/6270
104+50200_26Small Stream Crossing - No culvert.
10960
106+00
107+00200_27EOP. End of Road Treatment Method. Road beyond this point has been decommissioned.
This partial layout provides preliminary locations, dimensions and quantities. Contractor is responsible for final layout.