02 77 40 Wheel Stop

View the file

Other files

File Type Posted
BioPreferred_Product_Categories_June_2013.pdf PDF
Campground_02_77_41-speed_bump.pdf PDF
WA1_08012014.pdf PDF
Campground_Maps_and_Drawings.pdf PDF
Campground_FP-03_Specs.pdf PDF
Campground_01_02_30_schedule.pdf PDF
Campground_SPEC_LIST.pdf PDF
Campground_S-14-0020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POV Campground Road Rehabilitation AG-05G1-S-14-0020 Section 02 77 40, Wheel Stop Specification Page 1 of 1

SECTION 02 77 40

WHEEL STOP

PART 1 GENERAL

1.1 DESCRIPTION

A. The work of this section consists of furnishing and installing concrete wheel stops.

1.2 QUALITY ASSURANCE

A. Wheel stops shall be constructed using minimum 3000 psi concrete.

1.3 SUBMITTALS

A. Submit manufacturer’s data including dimensions.

1.4 MEASUREMENT AND PAYMENT (NOT USED)

PART 2 PRODUCTS

2.1 WHEEL STOPS

A. Construct wheel stops minimum Height – 6”; Width – 8”; Length – 7’-0”; 1” chamfer.

B. Elevated center areas to promote storm drainage.

2.2 MOUNTING HARDWARE

A. Rebar or as recommended by manufacturer.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install wheel stops per manufacturer’s recommendations where staked on the ground by Government.

END OF SECTION 02 77 40

WHEEL STOP 02 77 40-1

1.1 DESCRIPTION
A. The work of this section consists of furnishing and installing concrete wheel stops.
1.2 QUALITY ASSURANCE
A. Wheel stops shall be constructed using minimum 3000 psi concrete.
1.3 submittals
A. Submit manufacturer’s data including dimensions.
1.4 measurement and payment (NOT USED)
2.
2.1 wheel stops
A. Construct wheel stops minimum Height – 6”; Width – 8”; Length – 7’-0”; 1” chamfer.
B. Elevated center areas to promote storm drainage.
2.2 MOUNTING HARDWARE
A. Rebar or as recommended by manufacturer.
3.
3.1 INSTALLATION
A. Install wheel stops per manufacturer’s recommendations where staked on the ground by Government.