Campground_01_02_30_schedule.pdf

PDF 9 KB Posted

Attached to
Asphalt Surface Treatment and Crack Sealing Repair Project, Colville National Forest
Solicitation number
AG-05G1-S-14-0020
Issued by

About this file

01 02 30 Schedule of Items

View the file

Other files

File Type Posted
BioPreferred_Product_Categories_June_2013.pdf PDF
Campground_02_77_41-speed_bump.pdf PDF
WA1_08012014.pdf PDF
Campground_02_77_40-wheel_stop.pdf PDF
Campground_Maps_and_Drawings.pdf PDF
Campground_FP-03_Specs.pdf PDF
Campground_SPEC_LIST.pdf PDF
Campground_S-14-0020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POV Campground Road Rehabilitation AG-05G1-S-14-0020 Section 01 02 30, Schedule of Items Page 1 of 1

SECTION 01 02 30

SCHEDULE OF ITEMS

PART 1 GENERAL

1.01 RELATED REQUIREMENTS SPECIFIED IN OTHER SECTIONS

A. Payment Procedures.

B. Change Order Procedures

1.02 SCHEDULE HEADINGS

A. As a basis for computing progress payment values, separately list installed value of each of the following:

1. Each major work item.

2. Each subcontracted work item. For each subcontract, list products and operations of that subcontract as separate line items.

3. Any products to be stored, for which separate payments will be requested with copy of invoice for materials.

B. Include directly proportional amount of Contractor’s overhead and profit in each component listing.

C. Round off values to nearest dollar.

END OF SECTION 01 02 30