A_Ind Task Order Proj A.doc
DOC document 119 KB Posted
- Solicitation number
- AG-04T-S-08-0008
About this file
3. Project A Task Order Details
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 2.pdf | ||
| amendment 1.pdf | ||
| B_Project B Road 2553 ERFO Spec List FSSS attachment 2.pdf | ||
| B_Project B Road 2553 ERFO Plans attachment 3.pdf | ||
| B_Project B QUESTIONNAIRE attachment 1.doc | DOC document | |
| AG-04T1-S-08-0008 Rd Constr IDIQ solicitation.doc | DOC document | |
| B_Ind task order Proj B.doc | DOC document | |
| A_Project A drawings attachment 3.pdf | ||
| B_Wage Decision attachment 4project B.doc | DOC document | |
| A_Wage Decision attachment 4 proj A.doc | DOC document | |
| A_Project A Specs Attachment 2.doc | DOC document | |
| AG-04T1-S-08-0008 Rd Constr Return Packet.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project A: Road 4710-480 Culvert Replacement
Individual Project Task Order, Page 1 of 10
INDIVIDUAL PROJECT TASK ORDER
| Contract Number |
| Individual Project Task Order Number |
This Individual Project Task Order is issued under contract number:
AG-04T1-C-08-####
AG-04T1-D-08-####
| ISSUING OFFICE: (Forest Service Unit Name) |
| Task Order Date |
Umpqua National Forest
Acquisition Section, Room 201
2900 NW Stewart Parkway
Roseburg, OR 97470
Financial obligations and payments shall be processed via the Issuing Office.
PROJECT:
PROJECT NAME: PROJECT A: Road 4710-480 Culvert Replacement North Umpqua Ranger District, Umpqua National Forest
Itemized payment items, quantities, prices and detailed project requirements are attached
| Proposal Request Date: |
| Proposal Response Date/Time (close of business unless otherwise shown): |
A BID GUARANTEE is required for all offers exceeding $100,000.00.
OFFER:
| Offeror Name (same as on contract) |
| Offered by (Name, Title, Phone): |
| Offered Amounts attached in Section B. |
| Authorized Signature: |
Date:
This is a firm offer for 30 calendar days from the Response Date/Time. The offer agrees to furnish any required bonds and to perform the work at the prices offered.
AWARD:
ITEMS ACCEPTED:
TOTAL
AMOUNT: $
Task Order Number and Award Date shown at top.
| Ordered by (Name, Title, Phone): |
| Authorized Signature |
Task Order Contracting Officer
This project includes the terms and conditions of the basic contract as supplemented by the attached project-specific requirements.
TABLE OF CONTENTS
| CONTRACT SECTION BEING SUPPLEMENTED |
| TASK ORDER PAGE |
| Section B – Bid Schedule |
| 3 |
| Section C – Statement of Work |
| 4 |
| Section D – Packaging |
| not applicable |
| Section E – Inspection Requirements |
| No Additions |
| Section F – Performance Time |
| 5 |
| Section G – GFP & Administrative Information |
| 6 |
| Section H – Special Contract Requirements |
| 7-8 |
| Section I – Contract Clauses |
| No Additions |
| Section J – Attachments |
| 9 |
Questionnaire
List of Specifications and Supplemental Project Specifications
Drawings
Wage Decision
Fire Protection Requirements
Bid Bond
| Section L – Instructions for Offer Submission |
| 10 |
Existing contract clauses are supplemented and new contract clauses may be added.
SECTION B – BID SCHEDULE
(Detailed List of Payment Items, Quantities, Units, Unit Prices and Amounts)
B-1 BID SCHEDULE
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
151(01)
Mobilization
Lump Sum
ALL
152(01)
Construction survey and staking, method C, tolerance C
Lump Sum
ALL
203(01)
Removal of Culverts
Each
204(04) Unclassified borrow, compaction method E, finishing method B
Cubic Yard
| 251(01)A |
| Placed RipRap, Class 3 |
| Cubic Yard |
| * |
251(01)B
Placed RipRap, Class 5
Cubic Yard
251(01)C
Placed RipRap, Class 6
Cubic Yard
253(13)
Gabions, welded wire baskets
Square Yard
322(32) Haul and place stockpiled aggregate, compaction method B. (Road surface only)
Cubic Yard
602(42) 42 inch span, 29 inch rise, Aluminized steel, type 2 corrugated steel pipe, 0.109” thickness, method B
Foot
602(95) 95 inch span, 67 inch rise, Aluminized steel, type 2 corrugated steel pipe, 0.109” thickness, method B
Foot
TOTAL PRICE $_________________
B-2 Note:
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151(01) Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01. All units are measured as Actual Quantity unless denoted by an asterisk (*). If denoted by an asterisk, the quantity is measured as a Contract Quantity in accordance with FP-03.
SECTION C – STATEMENT OF WORK
C-1
PROJECT SCOPE
Road 4710-480 MP 1.15 Culvert Replacement ERFO SITE 06-08-06
This project consist of reconstructing the stream crossing with a 95”x67”x96’ pipe and reconstructing the 12 ft. wide road with additional 13 ft. curve widening.
C-2
PROJECT LOCATION
This project is located on the North Umpqua Ranger District on the Umpqua National Forest, Township 26 South, Range 1 West, Section 3, near Glide, OR. From Roseburg take exit 124 off of Interstate I-5 take Highway 138 East (North Umpqua Highway), continue for approx. 31 miles, turn left on to Forest Service road 4710 (Boundary Rd.); continue for approx. 6 miles, turn onto Forest Service Rd. 4710-480 and continue for 1.15 miles to the project site.
C-5
SPECIFICATIONS APPLICABLE TO THIS INDIVIDUAL PROJECT
[X] FHWA Standard Specification 2003 U.S. Customary applies
[_] FHWA Standard Specification 2003 Metric applies
The attached “List of Specifications” and “Supplemental Specifications” apply.
SECTION F – PERFORMANCE TIMES
F-5
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK / ALTERNATE I
The following performance time requirements shall apply to this project:
September 15, 2008
Completion Calendar Date and
July 15, 2008 Latest Assumed Notice To Proceed Date
SECTION G – GFP & ADMINISTRATIVE INFORMATION
G-9
GOVERNMENT-FURNISHED PROPERTY (AGAR 452.245-70) (FEB 1988)
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
| Property/Facilities/Services |
| Availability Location |
| Availability Time |
| Class 3, 5, and 6 Riprap needs sorting, 3/4 inch minus crushed aggregate for bedding and backfill, 1-1/2 inch minus for road surface, and unclassified borrow materials. |
| Bloody Point Quarry located on FS Road 3803-003, mile post 0.1, T 25 S, R1E, Sec 31. |
| At Notice to Proceed |
| Water source as needed for fire prevention, suppression, and for construction activities. |
| Raspberry Creek, Forest Road 4710-480, mile post 0.7, T26S, R1W, Sec. 9. |
| At Notice to Proceed |
| Industrial Site available for temporary staging during construction period. |
| MP 7 located on FS Road 38 at M.P. 7.0 (Dispersed camping area) |
| At Notice to Proceed |
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H-10
STORAGE AND STOCKPILING OF MATERIALS
Add the following:
Temporary stockpile material may be placed on existing road way and wide areas marked by COR at the project site road 4710-480 milepost 1.15.
H-12
LOCAL DISPOSAL SITES
Add the following:
Scatter construction slash along the slope within the clearing limits without damaging trees. Limb all logs. Place logs and stumps away from trees, positioned so they will not roll and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations.
H-13
INDUSTRIAL CAMPS
Add the following:
MP 7 located on Forest Service Road 38 at M.P. 7.0 for dispersed camping during contract period.
H-15
TRAFFIC CONTROL, BARRICADES, WARNING SIGNS, AND OTHER DEVICES
Add the following:
During construction road 4710-480 MP 0.00 shall be closed to the public and signed for contractors use. Contractor shall provide all necessary signage.
H-20
PROSECUTION OF WORK -- WORK HOUR LIMITS -- WORK ITEM LIMITS
Add the following:
Construction activity may be Monday thru Friday and shall be limited to the hours between 7:00 a.m. and 6:00 p.m., unless other hours are approved in writing by the COR.
All construction activity shall be performed during the period between July 15 through September 15, 2008 inclusive, unless otherwise approved in writing by the COR.
H-22
SUBMITTALS
Add the following:
| Title |
| Referenced by Contract clause or Specification No. |
| Time of Government Approval After Submittal |
| Disposal Agreement |
| 203.05(a) |
| N/A |
H-27
SPECIAL CONTRACT REQUIREMENTS FOR UMPQUA NATIONAL FOREST PROJECTS
Clauses H-27 A, B, C, D, G, H apply.
Add the following to H-27G
Under the ROAD LISTING add the following:
The Contractor is authorized to use roads shown in the Special Project Specifications and/or the following Road Listing for performance of work under this contract subject to the maintenance requirements and use limitations shown.
ROAD and TERMINI
USE LIMITS
Rd. 4710 MP 0.00 – MP 2.6 None – No maintenance required
Rd. 4710-480 MP 2.6 – MP 3.2 Water road as needed for dust abatement during use.
Rd. 4710-480 MP 3.2 – MP 6.0 None – No maintenance required
Rd. 38 MP 0.00 – MP 0.7 None – No maintenance required
Rd. 3803 MP 0.00 – MP 1.0 None – No maintenance required
Rd. 3803-003 MP 0.00 – MP 0.1 None – No maintenance required
SECTION J - ATTACHMENTS
Item Number of Pages
1. Individual Project Technical Capability Questionnaire 1 page
(Attached separately)
2. List of Specifications and Supplemental Project Specifications 54 pages
3. List of Applicable Drawings:
9 drawings
Sheet No.
Title
1 1 Title and Signature 2 2 Vicinity Map
3 3 Existing Site Plan 4 4 Proposed Site Plan 5 5 Proposed Profile View & Sections 6 6 Culvert Details
7 7 Gabion Basket Details
8 8 General Notes 9 9 Pit Plan (material source)
4. General Decision Number: OR080002 04/04/2008 OR2 16 pages
5. Fire Protection Requirements Forms from basic contract:
· R6-FS-6300-52 applies
· Measure 1 applies
· Measure 2 applies Bid Bond Form SF-24 applies if offer exceeds $100,000.00 and a Surety Bond is used for the Bid Guarantee.
SECTION L - INSTRUCTIONS
L-11
FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
ADD:
Site Visit contact:
Peggy Roberts Umpqua N.F.
Supervisor’s Office Roseburg, OR (541)957-3432