Road_5300_Culvert_ReplacementPlans.pdf
PDF 2 MB Posted
- Attached to
- Multi-Agency Road Construction IDIQ
- Solicitation number
- AG-04T0-S-13-0022
About this file
Project A-Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Road5300MP112CulvertReplacementSpecs.pdf | ||
| VicinityMaps.pdf | ||
| INDIVIDUALPROJECTTASKORDER.pdf | ||
| CompleteSolicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3/8" R&C
3/8" R&C
CP #422 APPROX. 146 FT FROM EXISTING
PIPE CENTERLINE ON LEFT EDGE OF
ROAD BEGINNING OF PROJECT
FLOW
EC
KM
AN
C
R
EE
K
EXISTING THALWEG
PROPOSED THALWEG
990 99
EXISTING EDGE OF ASPHALT
EXISTING DITCH
SCALE IN FEET
ELEVATION IS ASSUMED 1000' AT CP #1
CONTOUR INTERVAL 1'
0 10 20
LEGEND
EXISTING BANKS
EXISTING TOE OF SLOPE
EXISTING THALWEG
EXISTING CENTERLINE
S
H E
E T
S H
E E
TS 9
E
X
IS
TI
N
G S
IT
E
P
LA
N S
H E
E T
N A
M E
P R
O
JE
C T
R O
A D
M
P
.1
C U
LV
E
R T
R E
P
LA
C E
M E
N T
3/8" R&C
3/8" R&C
1+00
1+20
1+40
1+60
1+80
2+00
0+
0+
0+
0+
0+
1+
1+
1+
FLOW
EC
KM
AN
C
R
EE
K
PROPOSED THALWEG
HMAC WIDTH 21'
HMAC WIDTH 19'
HMAC WIDTH 14'
HMAC WIDTH 24'
PROPOSED EDGE OF ASPHALT
SCALE IN FEET
ELEVATION IS ASSUMED 1000' AT CP #1
CONTOUR INTERVAL 1'
0 10 20
LEGEND
PROPOSED BANKS
PROPOSED THALWEG
EXISTING DITCH
EXISTING CENTERLINE
S
H E
E T
S H
E E
TS 9
P
R O
P O
S E
D S
IT
E
P
LA
N S
H E
E T
N A
M E
P R
O
JE
C T
R O
A D
M
P
.1
C U
LV
E
R T
R E
P
LA
C E
M E
E levation
0+25 0+40 0+80 1+20 1+30
EXISTING 5' DIA. CMP
PROPOSED STRUCTURAL PLATE ARCH
WITH FOOTINGS AND SIMULATED
STREAMBED
PROPOSED ROADWAY STRUCTURE.
SEE CROSS SECTION DETAIL SHEET EXISTING GROUND
PROPOSED THALWEG. SEE
STREAMBED DETAILS
NATIVE MATERIAL EMBANKMENT
PROPOSED FOOTING SEE CROSS SECTION DETAIL SHEET
EXTEND FOOTINGS 6" BEYOND
ARCH, TYPICAL BOTH ENDS
NOT TO SCALE
CMP = CORRUGATED METAL PIPE
BOP = BEGINNING OF PROJECT
EOP = END OF PROJECT
HMAC = HOTMIX ASPHALT CONCRETE
E levation
0+80 1+20 1+60 2+00 2+20
2.00%-1.00%
STA:1+35.00
ELEV:1000.83
STA:1+76.11
ELEV:1001.65
MATCH SURFACE OF EXISTING
ROADWAY WITH NEW SURFACING
AT BOP AND EOP SIDES OF
EXCAVATION. APPROXIMATE
STATIONS 0+80 AND 2+20
5.99%
EXISTING 5' DIA. CMP
PROPOSED STRUCTURAL PLATE ARCH WITH
FOOTINGS AND SIMULATED STREAMBED
TOP OF PROPOSED HMAC SURFACING
EXISTING GROUNDGRADE BREAKS
NOT TO SCALE
S
H E
E T
S H
E E
TS 9
P
R O
P O
S E
D P
R O
FI
LE
S S
H E
E T
N A
M E
P R
O
JE
C T
R O
A D
M
P
.1
C U
LV
E
R T
R E
P
LA
C E
M E
R
R
ARMOR FOOTINGS AND FILL SLOPE
WITH CLASS 3 RIPRAP
10' WIDE x 3' THICK X 9' HIGH
END OF CLASS 3 RIPRAP
TO BE STAKED BY C.O.
CONTINUOUS HARDENED
BANKS (BOTH SIDES)
B
A
A
PROPOSED STREAM PLAN VIEW
STREAMBED SIMULATION
MATERIAL BEDCLASS 10
EXISTING
GROUND
LEGEND
STRUCTURE ROCKS
BED CLASS 10
BANK ROCKS
FOOTER FOCKS
NOTES:
1) CONTINUOUS BANK ROCKS AND FOOTINGS NOT SHOWN IN PROFILE VIEW
2) DETAILS A-A, B-B, R-R AND S-S SEE CROSS SECTION DETAIL SHEET.
3) STRUCTURE ROCKS, FOOTER ROCKS, AND BANK ROCKS SHALL BE FISH REST STOP ROCKS CLASS 2 AND 3.
3) BACKFILL EXCAVATED AREAS, EXISTING CULVERT SCOUR HOLE AND SUMP HOLES AS STAKED BY C.O. USE
BEDCLASS 10 STREAM SIMULATION ROCK, OR MATERIAL APPROVED BY C.O.
4) CREATE FULL SPAN STRUCTURES WITH TABULAR BOULDERS 24" MINIMUM MEDIAN AXIS
5) FULL SPAN STRUCTURE AND RANDOM BOULDER LOCATIONS MAY BE ADJUSTED BY C.O.
6) RANDOM BOULDERS SHALL BE EMBEDDED AT LEAST 2 / 3 rds OF DIAMETER
B
EXISTING STREAM BANK
ARMORING DETAIL S-S.
RANDOMLY
PLACED
BOULDERS
MATCH EXISTING BANK WIDTHS OUTSIDE
OF RIPRAP EXTENTS, INLET AND OUTLET
FULL SPAN STRUCTURE DETAIL A-A BOULDER DETAIL B-B
10'10' 10' 15'
RIPRAP DETAIL R-R.
ALL FOUR CORNERS TYPICAL
26'
32' 71.0'
MATCH EXISTING STREAMBED
MATCH EXISTING STREAMBED
FOOTINGS
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
S
H E
E T
S H
E E
TS 9
S
TR
E
A M
B E
D S
IM
U
LA
TI
O N
S H
E E
T N
A M
E P
R O
JE
C
T R
O A
D
M P
.1
C
U
LV
E R
T R
E P
LA
C
E M
E
BANK FULL WIDTH
BANK
12"-24"
BANK
12"-24"
STREAMBED SIMULATION
MATERIAL BEDCLASS 10
EXTEND BANK AND STREAM
SIMULATION ROCKS TO
BOTTOM OF FOOTINGS
SECTION B-B
1) PLACE 3 TO 5 RANDOM BOULDERS BETWEEN STEP STRUCTURES. VARY EMBEDMENT
2) AT INLET AND OUTLET PLACE LARGEST ROCKS FROM FRS CLASS 2 AND 3. PLACE
LARGEST BOULDERS OUTSIDE AND TOWARDS ENDS OF ARCH
LOW FLOW CHANNEL
BANK FULL WIDTH
BANK
12"-24"
BANK
12"-24"
EXTEND BANK
ROCKS TO BOTTOM
OF FOOTINGS
SECTION A-A
ALL STRUCTURE ROCKS
SHALL BE BURIED AT
LEAST 12 DEPTH EXCEPT
RANDOM BOULDERS AS
STAKED BY C.O.
FOOTER ROCKS
SET TOP OF APEX ROCK
MAXIMUM 10" ABOVE
STREAMBED
STREAMBED SIMULATION
MATERIAL BEDCLASS 10
18"
48"
12"
36" NOTES:
1) ALL REINFORCING STEEL
SHALL BE 3" CLEAR IN FOOTING
AND STEM WALL
2) ALL OVERLAPS SHALL BE 18"
#6 STRAIGHT BARS
16" ON CENTER
#6 BENT BARS
16" ON CENTER
12" MIN. HOOK
#5 LONGITUDINAL BARS
4" O.C.
3" X 8" SLOT
FILLED WITH
NON-SHRINK
GROUT
16" 20"
#5 LONGITUDINAL BARS
4" O.C. OR 6 EQUAL SPACES
FOOTING DETAIL
NOT TO SCALE
BACKFILL SIDE
60"
6" DEPTH GRADING D
3"
70.00
55.19
25% H
6"
1V:1.5H1V:1.5H
SINGLE RADIUS ARCH DIMENSIONS
NOT TO SCALE
LOWER
EXCAVATION
LIMIT
FOOTER ROCKS
FULL
SPAN
STRUCTURE
STREAMBED SIMULATION
MATERIAL BEDCLASS 10
CONSTRUCT STREAMBED AND STEPS STARTING AT OUTLET,
PLACE FOOTER ROCKS AT 1V:1H ON THE DOWNSTREAM SIDE
WITH STREAMBED MATERIAL SUPPORT ON UPSTREAM SIDE.
RANDOMLY
PLACED
BOULDER
SECTION A-A PROFILE DETAIL
NOT TO SCALE
LENGTH
HEIGHT
R-R TYPICAL RIPRAP
NOT TO SCALE
FOOTING
NOTES:
1) FILL RIPRAP VOIDS WITH WELL-GRADED ROCK CONTAINING
APPROXIMATELY 10% SOIL TO PREVENT STREAM FROM FLOWING
THROUGH RIPRAP, INDIRECT TO 251 PAY ITEM.
2) PLACE CLASS 3 RIPRAP 3' THICK WITH FACE OF RIPRAP SLOPE
FLUSH WITH ROADWAY FILLSLOPE.
3) SEE STREAMBED SIMULATION SHEET FOR DIMENSIONS
FINISHED RIPRAP
SLOPES 1V: 11
2H
S-S EXISTING STREAM BANK ARMORING
NOT TO SCALE
EXTEND BANK ROCKS TO TOP OF EXISTING
BANKS OUTSIDE OF RIPRAP EXTENTS
3" DEPTH HMAC
9" DEPTH
SUBGRADE AND 12"
DEPTH GRADING D
SHOULDERS
SHOULDERS AND FILL SLOPES
1V : 1.5 H. AGGREGATE SLOPE 1:V TO 2:H
VARIES
1' SHOULDERS AND FILL WIDENING EACH SIDE OF
EMBANKMENT
ROADWAY CROSS SECTION
S
H E
E T
S H
E E
TS 9
C
R O
S S
S E
C
TI
O N
D E
TA
IL
S S
H E
E T
N A
M E
P R
O
JE
C T
R O
A D
M
P
.1
C U
LV
E
R T
R E
P
LA
C E
M E
GEOTEXTILE-WRAPPED STRAW BALE SEDIMENT CONTROL WEIR
BANKFULL
PLAN VIEW
ELEVATION VIEW
PROFIILE VIEW
(NOT TO SCALE)
TYPICAL SECTION D-D
BYPASS TYPICAL PLAN VIEW
STREAMBED
GEOTEXTILE
MIRAFI 140N
OR EQUAL
STRAW BALES
SECTION VIEW
STREAM FLOW
GRANULAR BACKFILL
SECTION 703.03(a)
STREAM FLOW GRANULAR BACKFILL
SECTION 703.03(a)
GEOTEXTILE
MIRAFI 140N
OR EQUAL
STRAW BALES
SANDBAG BYPASS DAM DETAILS
(NOT TO SCALE)
BYPASS PIPE
6 MIL. PLASTIC
SHEETING
ANTI-SEEP COLLAR.
ROLL ANTI-SEEP COLLAR OVER
MEMBRANE & PIPE, THEN CUT
AND REMOVE MEMBRANE
FROM END OF PIPE.
IMPERVIOUS MEMBRANE KEY TRENCH,
FILL WITH CLEAN GRAVEL AS NEEDED
TO CONTROL SEEPAGE UNDER
IMPERVIOUS MEMBRANE
ANCHOR IMPERVIOUS MEMBRANE
(SANDBAGS, STONES, ETC.)
18" MIN.
IMPERVIOUS MEMBRANE
ANTI-SEEP COLLAR
SANDBAGS
BYPASS PIPE 24"
DIAMETER MIN.
OVERFLOW LESS THAN "BANKFULL"
18" MIN.
SANDBAGS
STREAMBED
VARIES AS NEEDED
EXCAVATION
SLOPE
1.5
VARIES AS NEEDED
STABLE BENCH
BYPASS PIPE
STREAM FLOW
CLEAR WATER
SUMPS ELBOW JOINTS
AS NEEDED
BYPASS PIPE
24" DIAMETER
MINIMUM
OUTLET LOCATION
APPROVED BY C.O.
(NOT TO SCALE)
FLOW
"BROWN WATER SUMP
REMOVE SEDIMENT / TURBIDITY
BEFORE ALLOWING WATER TO
RE-ENTER STREAM
GEOTEXTILE-WRAPPED STRAW
BALE SEDIMENT CONTROL WEIR
BANKFULL
ARCH
D D
BYPASS DAM
(SEE DETAILS)
IMPERVIOUS MEMBRANE KEY TRENCH.
KEY MEMBRANE INTO TRENCH BEFORE
DRAPING OVER SANDBAG DAM.
NOTES:
1) THE DEWATERING & SEDIMENT CONTROL TYPICALS &
DETAILS SHOWN BY THE GOVERNMENT DEPICT SEVERAL
MINIMALLY ACCEPTABLE FEATURES TO BE PART OF A
CONTRACTORS' PLAN. REGARDLESS OF ANY PLAN
APPROVED BY THE C.O., MAINTAINING WATER QUALITY
REMAINS THE RESPONSIBILITY OF THE CONTRACTOR
THROUGHOUT THE DURATION OF THE PROJECT.
2) PUMP STREAM WATER AROUND SITE DURING
INSTALLATION OF PRIMARY DEWATERING SYSTEM.
MAINTAIN PUMPING SYSTEM AS A CONTINGENCY TO FLOW
EVENTS, PRIMARY SYSTEM FAILURE, PRIMARY SYSTEM
DISASSEMBLY AND STREAM REINTRODUCTION TO THE SITE
3) MATERIAL HANDLING BAGS MAY BE SUBSTITUTED FOR
SANDBAGS UPON APPROVAL BY C.O. HOWEVER, MINIMUM
DIMENSIONS STILL APPLY.
4) SHOULD BROWN WATER DISCHARGE LINES BE PLACED
UPSLOPE IN VEGETATION AS STAKED AND APPROVED BY
C.O., SEDIMENT AND TURBIDITY SHALL BE REMOVED
BEFORE ALLOWING WATER TO RE-ENTER ANY STREAM.
S
H E
E T
S H
E E
TS 9
D
E W
A
TE
R
IN
G D
E
TA
IL
S
S H
E E
T N
A M
E P
R O
JE
C
T R
O A
D
M P
.1
C
U
LV
E R
T R
E P
LA
C
E M
E
8"
O
2"
5' M
IN
IM
U M
4' MINIMUM
ROAD
CLOSED
MINIMUM SIGN PLAN
PRIOR TO WORK COMMENCING,
PLACE ONE "TRUCKS" SIGN ON ROAD 5300 AT:
JUNCTION ROAD 5300 AND ROAD 5360
JUNCTION ROAD 5300 AND 5381.
SIGNS - MINIMUM 2' X 2'
DURING EXCAVATION:
A) PLACE TYPE 3 BARRICADES ON ROAD 5300 3.
3' 5.
2'
TYPE III BARICADE FURNISHED WITH A
BM - R36, A BM -L36,
AND A R11 - 2
W20-3 24" X 24"
B
A
1 EA. - ON ROAD 5300,
MP 0.01 AND MP 4.70, AS STAKED BY CO
B
1 EA. - ON ROAD 5300, 500' PRIOR TO CLOSURES,
BOTH SIDES OF PROJECT AS STAKED BY CO.
FS ROAD 5300 CLOSURE
(INSERT DATES HERE)
MP 0.00 TO MP 3.25
A
FOR ADDITIONAL INFORMATION
CALL CENTRAL COAST
RANGER DISTRICT
541-563-8400
A1
A1 1 EA. - ON ROAD 5300,
MP 0.02 AND 4.69, AS STAKED BY CO.
SIGN PLAN NOTES:
1. INSTALL TEMPORARY TRAFFIC CONTROL ZONE SIGNS IN
RELATION TO THE ROAD ACCORDING TO PART VI OF THE MANUAL
ON UNIFORM TRAFFIC CONTROL DEVICES. (MUTCD)
2. SUPPLEMENTAL PANELS ARE TO BE SUPPLIED AS INDICATED,
INDIRECT PAYMENT IS INCIDENTAL TO PAY ITEM 15101.
3. MOUNT SIGNS ON 4" X 4" PRESSURE TREATED POSTS.
4. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN ALL
TRAFFIC CONTROL SIGNS. ANY SIGNS MISSING OR DEFACED
SHALL BE REPLACED IMMEDIATELY. AT END OF CLOSURE PERIOD,
CONTRACTOR SHALL REMOVE SIGNS.
5. ROAD CLOSURE DEVICES SHALL BE TYPE III BARRICADE WITH A
BM - R36, A BM - L36, AND A R11 - 2 INSTALLED IN ACCORDANCE
WITH MUTCD.
6. CONTRACTOR SHALL NOTIFY CO IN WRITING OF THE PROPOSED
ROAD CLOSURE AT LEAST 10 DAYS IN ADVANCE.
7. ONE WEEK PRIOR TO CLOSING, POST TRAFFIC WARNING SIGNS
A & A1.
8. JUST PRIOR TO CLOSING, POST TRAFFIC WARNING SIGN B, AND
TYPE 3 BARRICADES
REFLECTIVE GUIDE SIGN WITH ORANGE
BACKGROUND AND BLACK 2.5" LETTERING.
24" X 48"
REFLECTIVE GUIDE SIGN WITH ORANGE
BACKGROUND AND BLACK 2.5" LETTERING.
24" X 48"
1V:1.5H
5%-10%
DISPOSAL AREA DETAIL
NOT TO SCALE
Max.
Height
12'1V:1.5H
NOTES:
1) CO WILL FLAG DISPOSAL AREA LIMITS
2) LAYER PLACE EXCAVATED MATERIAL, COMPACTION METHOD C
3) WINDROW CLEARING DEBRIS ALONG DISPOSAL AREA LIMITS
MINIMUM 3'
FROM LIMITS
EXISTING GROUND
4"x4" POST
S
H E
E T
S H
E E
TS 9
S
IG
N
P
LA
N A
N D
D
IS
P O
S A
L A
R E
A D
E
TA
IL
S
S H
E E
T N
A M
E P
R O
JE
C
T R
O A
D
M P
.1
C
U
LV
E R
T R
E P
LA
C
E M
E
File details come from the government source that posted it. Updated .