Road_5300_Culvert_ReplacementPlans.pdf

PDF 2 MB Posted

Attached to
Multi-Agency Road Construction IDIQ
Solicitation number
AG-04T0-S-13-0022
Issued by

About this file

Project A-Plans

View the file

Other files

File Type Posted
Road5300MP112CulvertReplacementSpecs.pdf PDF
VicinityMaps.pdf PDF
INDIVIDUALPROJECTTASKORDER.pdf PDF
CompleteSolicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3/8" R&C

3/8" R&C

CP #422 APPROX. 146 FT FROM EXISTING

PIPE CENTERLINE ON LEFT EDGE OF

ROAD BEGINNING OF PROJECT

FLOW

EC

KM

AN

C

R

EE

K

EXISTING THALWEG

PROPOSED THALWEG

990 99

EXISTING EDGE OF ASPHALT

EXISTING DITCH

SCALE IN FEET

ELEVATION IS ASSUMED 1000' AT CP #1

CONTOUR INTERVAL 1'

0 10 20

LEGEND

EXISTING BANKS

EXISTING TOE OF SLOPE

EXISTING THALWEG

EXISTING CENTERLINE

S

H E

E T

S H

E E

TS 9

E

X

IS

TI

N

G S

IT

E

P

LA

N S

H E

E T

N A

M E

P R

O

JE

C T

R O

A D

M

P

.1

C U

LV

E

R T

R E

P

LA

C E

M E

N T

3/8" R&C

3/8" R&C

1+00

1+20

1+40

1+60

1+80

2+00

0+

0+

0+

0+

0+

1+

1+

1+

FLOW

EC

KM

AN

C

R

EE

K

PROPOSED THALWEG

HMAC WIDTH 21'

HMAC WIDTH 19'

HMAC WIDTH 14'

HMAC WIDTH 24'

PROPOSED EDGE OF ASPHALT

SCALE IN FEET

ELEVATION IS ASSUMED 1000' AT CP #1

CONTOUR INTERVAL 1'

0 10 20

LEGEND

PROPOSED BANKS

PROPOSED THALWEG

EXISTING DITCH

EXISTING CENTERLINE

S

H E

E T

S H

E E

TS 9

P

R O

P O

S E

D S

IT

E

P

LA

N S

H E

E T

N A

M E

P R

O

JE

C T

R O

A D

M

P

.1

C U

LV

E

R T

R E

P

LA

C E

M E

E levation

0+25 0+40 0+80 1+20 1+30

EXISTING 5' DIA. CMP

PROPOSED STRUCTURAL PLATE ARCH

WITH FOOTINGS AND SIMULATED

STREAMBED

PROPOSED ROADWAY STRUCTURE.

SEE CROSS SECTION DETAIL SHEET EXISTING GROUND

PROPOSED THALWEG. SEE

STREAMBED DETAILS

NATIVE MATERIAL EMBANKMENT

PROPOSED FOOTING SEE CROSS SECTION DETAIL SHEET

EXTEND FOOTINGS 6" BEYOND

ARCH, TYPICAL BOTH ENDS

NOT TO SCALE

CMP = CORRUGATED METAL PIPE

BOP = BEGINNING OF PROJECT

EOP = END OF PROJECT

HMAC = HOTMIX ASPHALT CONCRETE

E levation

0+80 1+20 1+60 2+00 2+20

2.00%-1.00%

STA:1+35.00

ELEV:1000.83

STA:1+76.11

ELEV:1001.65

MATCH SURFACE OF EXISTING

ROADWAY WITH NEW SURFACING

AT BOP AND EOP SIDES OF

EXCAVATION. APPROXIMATE

STATIONS 0+80 AND 2+20

5.99%

EXISTING 5' DIA. CMP

PROPOSED STRUCTURAL PLATE ARCH WITH

FOOTINGS AND SIMULATED STREAMBED

TOP OF PROPOSED HMAC SURFACING

EXISTING GROUNDGRADE BREAKS

NOT TO SCALE

S

H E

E T

S H

E E

TS 9

P

R O

P O

S E

D P

R O

FI

LE

S S

H E

E T

N A

M E

P R

O

JE

C T

R O

A D

M

P

.1

C U

LV

E

R T

R E

P

LA

C E

M E

R

R

ARMOR FOOTINGS AND FILL SLOPE

WITH CLASS 3 RIPRAP

10' WIDE x 3' THICK X 9' HIGH

END OF CLASS 3 RIPRAP

TO BE STAKED BY C.O.

CONTINUOUS HARDENED

BANKS (BOTH SIDES)

B

A

A

PROPOSED STREAM PLAN VIEW

STREAMBED SIMULATION

MATERIAL BEDCLASS 10

EXISTING

GROUND

LEGEND

STRUCTURE ROCKS

BED CLASS 10

BANK ROCKS

FOOTER FOCKS

NOTES:

1) CONTINUOUS BANK ROCKS AND FOOTINGS NOT SHOWN IN PROFILE VIEW

2) DETAILS A-A, B-B, R-R AND S-S SEE CROSS SECTION DETAIL SHEET.

3) STRUCTURE ROCKS, FOOTER ROCKS, AND BANK ROCKS SHALL BE FISH REST STOP ROCKS CLASS 2 AND 3.

3) BACKFILL EXCAVATED AREAS, EXISTING CULVERT SCOUR HOLE AND SUMP HOLES AS STAKED BY C.O. USE

BEDCLASS 10 STREAM SIMULATION ROCK, OR MATERIAL APPROVED BY C.O.

4) CREATE FULL SPAN STRUCTURES WITH TABULAR BOULDERS 24" MINIMUM MEDIAN AXIS

5) FULL SPAN STRUCTURE AND RANDOM BOULDER LOCATIONS MAY BE ADJUSTED BY C.O.

6) RANDOM BOULDERS SHALL BE EMBEDDED AT LEAST 2 / 3 rds OF DIAMETER

B

EXISTING STREAM BANK

ARMORING DETAIL S-S.

RANDOMLY

PLACED

BOULDERS

MATCH EXISTING BANK WIDTHS OUTSIDE

OF RIPRAP EXTENTS, INLET AND OUTLET

FULL SPAN STRUCTURE DETAIL A-A BOULDER DETAIL B-B

10'10' 10' 15'

RIPRAP DETAIL R-R.

ALL FOUR CORNERS TYPICAL

26'

32' 71.0'

MATCH EXISTING STREAMBED

MATCH EXISTING STREAMBED

FOOTINGS

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

S

H E

E T

S H

E E

TS 9

S

TR

E

A M

B E

D S

IM

U

LA

TI

O N

S H

E E

T N

A M

E P

R O

JE

C

T R

O A

D

M P

.1

C

U

LV

E R

T R

E P

LA

C

E M

E

BANK FULL WIDTH

BANK

12"-24"

BANK

12"-24"

STREAMBED SIMULATION

MATERIAL BEDCLASS 10

EXTEND BANK AND STREAM

SIMULATION ROCKS TO

BOTTOM OF FOOTINGS

SECTION B-B

1) PLACE 3 TO 5 RANDOM BOULDERS BETWEEN STEP STRUCTURES. VARY EMBEDMENT

2) AT INLET AND OUTLET PLACE LARGEST ROCKS FROM FRS CLASS 2 AND 3. PLACE

LARGEST BOULDERS OUTSIDE AND TOWARDS ENDS OF ARCH

LOW FLOW CHANNEL

BANK FULL WIDTH

BANK

12"-24"

BANK

12"-24"

EXTEND BANK

ROCKS TO BOTTOM

OF FOOTINGS

SECTION A-A

ALL STRUCTURE ROCKS

SHALL BE BURIED AT

LEAST 12 DEPTH EXCEPT

RANDOM BOULDERS AS

STAKED BY C.O.

FOOTER ROCKS

SET TOP OF APEX ROCK

MAXIMUM 10" ABOVE

STREAMBED

STREAMBED SIMULATION

MATERIAL BEDCLASS 10

18"

48"

12"

36" NOTES:

1) ALL REINFORCING STEEL

SHALL BE 3" CLEAR IN FOOTING

AND STEM WALL

2) ALL OVERLAPS SHALL BE 18"

#6 STRAIGHT BARS

16" ON CENTER

#6 BENT BARS

16" ON CENTER

12" MIN. HOOK

#5 LONGITUDINAL BARS

4" O.C.

3" X 8" SLOT

FILLED WITH

NON-SHRINK

GROUT

16" 20"

#5 LONGITUDINAL BARS

4" O.C. OR 6 EQUAL SPACES

FOOTING DETAIL

NOT TO SCALE

BACKFILL SIDE

60"

6" DEPTH GRADING D

3"

70.00

55.19

25% H

6"

1V:1.5H1V:1.5H

SINGLE RADIUS ARCH DIMENSIONS

NOT TO SCALE

LOWER

EXCAVATION

LIMIT

FOOTER ROCKS

FULL

SPAN

STRUCTURE

STREAMBED SIMULATION

MATERIAL BEDCLASS 10

CONSTRUCT STREAMBED AND STEPS STARTING AT OUTLET,

PLACE FOOTER ROCKS AT 1V:1H ON THE DOWNSTREAM SIDE

WITH STREAMBED MATERIAL SUPPORT ON UPSTREAM SIDE.

RANDOMLY

PLACED

BOULDER

SECTION A-A PROFILE DETAIL

NOT TO SCALE

LENGTH

HEIGHT

R-R TYPICAL RIPRAP

NOT TO SCALE

FOOTING

NOTES:

1) FILL RIPRAP VOIDS WITH WELL-GRADED ROCK CONTAINING

APPROXIMATELY 10% SOIL TO PREVENT STREAM FROM FLOWING

THROUGH RIPRAP, INDIRECT TO 251 PAY ITEM.

2) PLACE CLASS 3 RIPRAP 3' THICK WITH FACE OF RIPRAP SLOPE

FLUSH WITH ROADWAY FILLSLOPE.

3) SEE STREAMBED SIMULATION SHEET FOR DIMENSIONS

FINISHED RIPRAP

SLOPES 1V: 11

2H

S-S EXISTING STREAM BANK ARMORING

NOT TO SCALE

EXTEND BANK ROCKS TO TOP OF EXISTING

BANKS OUTSIDE OF RIPRAP EXTENTS

3" DEPTH HMAC

9" DEPTH

SUBGRADE AND 12"

DEPTH GRADING D

SHOULDERS

SHOULDERS AND FILL SLOPES

1V : 1.5 H. AGGREGATE SLOPE 1:V TO 2:H

VARIES

1' SHOULDERS AND FILL WIDENING EACH SIDE OF

EMBANKMENT

ROADWAY CROSS SECTION

S

H E

E T

S H

E E

TS 9

C

R O

S S

S E

C

TI

O N

D E

TA

IL

S S

H E

E T

N A

M E

P R

O

JE

C T

R O

A D

M

P

.1

C U

LV

E

R T

R E

P

LA

C E

M E

GEOTEXTILE-WRAPPED STRAW BALE SEDIMENT CONTROL WEIR

BANKFULL

PLAN VIEW

ELEVATION VIEW

PROFIILE VIEW

(NOT TO SCALE)

TYPICAL SECTION D-D

BYPASS TYPICAL PLAN VIEW

STREAMBED

GEOTEXTILE

MIRAFI 140N

OR EQUAL

STRAW BALES

SECTION VIEW

STREAM FLOW

GRANULAR BACKFILL

SECTION 703.03(a)

STREAM FLOW GRANULAR BACKFILL

SECTION 703.03(a)

GEOTEXTILE

MIRAFI 140N

OR EQUAL

STRAW BALES

SANDBAG BYPASS DAM DETAILS

(NOT TO SCALE)

BYPASS PIPE

6 MIL. PLASTIC

SHEETING

ANTI-SEEP COLLAR.

ROLL ANTI-SEEP COLLAR OVER

MEMBRANE & PIPE, THEN CUT

AND REMOVE MEMBRANE

FROM END OF PIPE.

IMPERVIOUS MEMBRANE KEY TRENCH,

FILL WITH CLEAN GRAVEL AS NEEDED

TO CONTROL SEEPAGE UNDER

IMPERVIOUS MEMBRANE

ANCHOR IMPERVIOUS MEMBRANE

(SANDBAGS, STONES, ETC.)

18" MIN.

IMPERVIOUS MEMBRANE

ANTI-SEEP COLLAR

SANDBAGS

BYPASS PIPE 24"

DIAMETER MIN.

OVERFLOW LESS THAN "BANKFULL"

18" MIN.

SANDBAGS

STREAMBED

VARIES AS NEEDED

EXCAVATION

SLOPE

1.5

VARIES AS NEEDED

STABLE BENCH

BYPASS PIPE

STREAM FLOW

CLEAR WATER

SUMPS ELBOW JOINTS

AS NEEDED

BYPASS PIPE

24" DIAMETER

MINIMUM

OUTLET LOCATION

APPROVED BY C.O.

(NOT TO SCALE)

FLOW

"BROWN WATER SUMP

REMOVE SEDIMENT / TURBIDITY

BEFORE ALLOWING WATER TO

RE-ENTER STREAM

GEOTEXTILE-WRAPPED STRAW

BALE SEDIMENT CONTROL WEIR

BANKFULL

ARCH

D D

BYPASS DAM

(SEE DETAILS)

IMPERVIOUS MEMBRANE KEY TRENCH.

KEY MEMBRANE INTO TRENCH BEFORE

DRAPING OVER SANDBAG DAM.

NOTES:

1) THE DEWATERING & SEDIMENT CONTROL TYPICALS &

DETAILS SHOWN BY THE GOVERNMENT DEPICT SEVERAL

MINIMALLY ACCEPTABLE FEATURES TO BE PART OF A

CONTRACTORS' PLAN. REGARDLESS OF ANY PLAN

APPROVED BY THE C.O., MAINTAINING WATER QUALITY

REMAINS THE RESPONSIBILITY OF THE CONTRACTOR

THROUGHOUT THE DURATION OF THE PROJECT.

2) PUMP STREAM WATER AROUND SITE DURING

INSTALLATION OF PRIMARY DEWATERING SYSTEM.

MAINTAIN PUMPING SYSTEM AS A CONTINGENCY TO FLOW

EVENTS, PRIMARY SYSTEM FAILURE, PRIMARY SYSTEM

DISASSEMBLY AND STREAM REINTRODUCTION TO THE SITE

3) MATERIAL HANDLING BAGS MAY BE SUBSTITUTED FOR

SANDBAGS UPON APPROVAL BY C.O. HOWEVER, MINIMUM

DIMENSIONS STILL APPLY.

4) SHOULD BROWN WATER DISCHARGE LINES BE PLACED

UPSLOPE IN VEGETATION AS STAKED AND APPROVED BY

C.O., SEDIMENT AND TURBIDITY SHALL BE REMOVED

BEFORE ALLOWING WATER TO RE-ENTER ANY STREAM.

S

H E

E T

S H

E E

TS 9

D

E W

A

TE

R

IN

G D

E

TA

IL

S

S H

E E

T N

A M

E P

R O

JE

C

T R

O A

D

M P

.1

C

U

LV

E R

T R

E P

LA

C

E M

E

8"

O

2"

5' M

IN

IM

U M

4' MINIMUM

ROAD

CLOSED

MINIMUM SIGN PLAN

PRIOR TO WORK COMMENCING,

PLACE ONE "TRUCKS" SIGN ON ROAD 5300 AT:

JUNCTION ROAD 5300 AND ROAD 5360

JUNCTION ROAD 5300 AND 5381.

SIGNS - MINIMUM 2' X 2'

DURING EXCAVATION:

A) PLACE TYPE 3 BARRICADES ON ROAD 5300 3.

3' 5.

2'

TYPE III BARICADE FURNISHED WITH A

BM - R36, A BM -L36,

AND A R11 - 2

W20-3 24" X 24"

B

A

1 EA. - ON ROAD 5300,

MP 0.01 AND MP 4.70, AS STAKED BY CO

B

1 EA. - ON ROAD 5300, 500' PRIOR TO CLOSURES,

BOTH SIDES OF PROJECT AS STAKED BY CO.

FS ROAD 5300 CLOSURE

(INSERT DATES HERE)

MP 0.00 TO MP 3.25

A

FOR ADDITIONAL INFORMATION

CALL CENTRAL COAST

RANGER DISTRICT

541-563-8400

A1

A1 1 EA. - ON ROAD 5300,

MP 0.02 AND 4.69, AS STAKED BY CO.

SIGN PLAN NOTES:

1. INSTALL TEMPORARY TRAFFIC CONTROL ZONE SIGNS IN

RELATION TO THE ROAD ACCORDING TO PART VI OF THE MANUAL

ON UNIFORM TRAFFIC CONTROL DEVICES. (MUTCD)

2. SUPPLEMENTAL PANELS ARE TO BE SUPPLIED AS INDICATED,

INDIRECT PAYMENT IS INCIDENTAL TO PAY ITEM 15101.

3. MOUNT SIGNS ON 4" X 4" PRESSURE TREATED POSTS.

4. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN ALL

TRAFFIC CONTROL SIGNS. ANY SIGNS MISSING OR DEFACED

SHALL BE REPLACED IMMEDIATELY. AT END OF CLOSURE PERIOD,

CONTRACTOR SHALL REMOVE SIGNS.

5. ROAD CLOSURE DEVICES SHALL BE TYPE III BARRICADE WITH A

BM - R36, A BM - L36, AND A R11 - 2 INSTALLED IN ACCORDANCE

WITH MUTCD.

6. CONTRACTOR SHALL NOTIFY CO IN WRITING OF THE PROPOSED

ROAD CLOSURE AT LEAST 10 DAYS IN ADVANCE.

7. ONE WEEK PRIOR TO CLOSING, POST TRAFFIC WARNING SIGNS

A & A1.

8. JUST PRIOR TO CLOSING, POST TRAFFIC WARNING SIGN B, AND

TYPE 3 BARRICADES

REFLECTIVE GUIDE SIGN WITH ORANGE

BACKGROUND AND BLACK 2.5" LETTERING.

24" X 48"

REFLECTIVE GUIDE SIGN WITH ORANGE

BACKGROUND AND BLACK 2.5" LETTERING.

24" X 48"

1V:1.5H

5%-10%

DISPOSAL AREA DETAIL

NOT TO SCALE

Max.

Height

12'1V:1.5H

NOTES:

1) CO WILL FLAG DISPOSAL AREA LIMITS

2) LAYER PLACE EXCAVATED MATERIAL, COMPACTION METHOD C

3) WINDROW CLEARING DEBRIS ALONG DISPOSAL AREA LIMITS

MINIMUM 3'

FROM LIMITS

EXISTING GROUND

4"x4" POST

S

H E

E T

S H

E E

TS 9

S

IG

N

P

LA

N A

N D

D

IS

P O

S A

L A

R E

A D

E

TA

IL

S

S H

E E

T N

A M

E P

R O

JE

C

T R

O A

D

M P

.1

C

U

LV

E R

T R

E P

LA

C

E M

E

File details come from the government source that posted it. Updated .