Amendment No. 2

Text of this file

Amendment No. 1, AG-04R3-S-09-8113 Page 2 of 3

1.AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTRACT ID CODE

PAGE 1 OF 2 PAGES

2 AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

7/1/2009

4. REQUISITION/PUCHASE REQ. NO.

5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

Blue Mountain Acquisition Management Area Umatilla National Forest 2517 SW Hailey Ave.

Pendleton, OR 97801 Umatilla National Forest 2517 SW Hailey Ave Pendleton, OR 97801 8.NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) X 9A.Amend Solicitation No. AG-04R3-S-09-8113

X 9B.Dated 6/02/2009

10A.Modification of Contract/Order #

10B.Dated (see Item 13) code facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [X ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning ONE copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specify authority):

The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return Original to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) Collaborative Restoration Stewardship

Delete Attachment E-2 (treatment unit data sheet for the NFJD Ranger District) and replace with new attached E-2 dated 7/1/2009.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

Gary Dillavou, Contracting Officer

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED

16B.UNITED STATES OF AMERICA

By /s/ Gary Dillavou_________ (Signature of Contracting Officer)

16C.DATE SIGNED

7/1/2009 Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243

HAZARDOUS FUELS REDUCTION STEWARDSHIP CONTRACT DATA SHEET

UMATILLA NATIONAL FOREST

NORTH FORK JOHN DAY RANGER DISTRICT

Data covering areas to be treated under this contract are contained in the tabulation below, and are representative samples of units to be treated:

TREATMENT UNITS

ITEM & SUB-ITEM NO.

UNIT NAME & NO.

ELEVATION (FEET)

EST. ACRES

PRESCRIPTION

TONS/AC

TO BE LEFT

EXHIBIT

PHOTO NO.

SNAGS/AC

WILDLIFE LOGS PIECES X DIA. X LENGTH = FEET/AC

OPERATING SEASON

MISCELLANEOUS

1.1 Kenny 32 A 1-4 15x12”x6’=>100’ Jan1-Dec31 Class 4 streamcourses within unit (100’ buffer)

1.2 Three Prairie 41 A 1-4 15x12”x6’=>100’ Class 4 streamcourses within unit (100’ buffer)

1.3 Lower Fivemile 6 A 1-4 15x12”x6’=>100’

1.4 Lower Fivemile 7 A 1-4 15x12”x6’=>100’

1.5 Lower Fivemile 9 A 1-4 15x12”x6’=>100’

2.1 Three Prairie 39 B 1-4 15x12”x6’=>100’ Class 4 streamcourses within unit (100’ buffer)

Attachment E-2 Dated: July 1, 2009

Other files

File Type Posted
Amendment5.rtf RTF text file
Amendment4.doc DOC document
Amendment3.rtf RTF text file
K Sage 20.pdf PDF
A Amendment1.rtf RTF text file
P Park 31.pdf PDF
B West 3 4.pdf PDF
R Park 33.pdf PDF
I Sage 13.pdf PDF
F Sage 8.pdf PDF
G Sage 11.pdf PDF
L Sage 21.pdf PDF
D Sage 6.pdf PDF
N Park 11.pdf PDF
M Sage 22.pdf PDF
Q Park 32.pdf PDF
H Sage 12.pdf PDF
O Park 12.pdf PDF
E Sage 7.pdf PDF
J Sage 14.pdf PDF
A West 1.pdf PDF
C West 5.pdf PDF
d.1 chick'nbone_52909_stew.pdf PDF
d. Appendix_AandB_UMA_North.doc DOC document
e.2 UMA South Detailed Data Sheet.doc DOC document
c.2 Mal_fuels photo.pdf PDF
a. Solicitation.doc DOC document
c.3 MAL Map West_1.pdf PDF
e.1 WR Treatment Units UMA South.pdf PDF
c.1 MAL-Vicinity MAP.pdf PDF
c. Appendix A and B_Malheur NF.doc DOC document
f. Oregon_Wage_Determination77-0079_sca.htm HTM file
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .