SF-30 pg 2-5.doc
DOC document 92 KB Posted
- Attached to
- Sustained Yield Restoration Stewardship Project - 10 Year Indefinite Delivery, Indefinite Quantity
- Solicitation number
- AG-04P5-S-08-9001
About this file
SF-30 page 2-5
View the file
Other files
| File | Type | Posted |
|---|---|---|
| New_AppendixB_addendum.doc | DOC document | |
| New_Appendix_A_Mandatory_Items_Addendum.doc | DOC document | |
| Policy Statement - Lakeview Federal Sustained Yield Unit.pdf | ||
| SF-30.doc | DOC document | |
| New_Appendix_A_Elective_Items_Addendum.doc | DOC document | |
| 7.FS_6500_25RequestforVerification.doc | DOC document | |
| 2.Noticetoofferors.doc | DOC document | |
| 3.Appendix_A_Elective_Items.doc | DOC document | |
| 1.AG-04P5-S-08-9001_Solicitation.doc | DOC document | |
| 5.Service_Contract_Act_1977-0079_36.htm | HTM file | |
| 6.FS_6500_24FinancialStatement.doc | DOC document | |
| 3.Appendix_D_Road_Construction_Reconstruction.doc | DOC document | |
| 3.Appendix_C_Road_Maintenance_Specification.doc | DOC document | |
| 3.Appendix_B_Timber_Removal_Specifications.doc | DOC document | |
| 3.Appendix_A_Mandatory_Items.doc | DOC document | |
| 4.DavisBaconNumberOR080002.doc | DOC document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised Schedule B, parts B1 and B2, 3 pages
Section B.1 Schedule of Items, edited numbering and matched titles to Appendices.
Section B.2 Timber Removal Price Schedule, New format and updated to provide for Total Bid Value for timber and escalation procedures.
B.1
SCHEDULE OF ITEMS:
NOTE: Price Proposals MUST be provided on ALL Items in Schedules B.1, Mandatory Work Activities.
SUMMARY SCHEDULE OF ITEMS – Complete item pricing on following Schedule B pages.
| ITEM NO. |
| MANDATORY WORK ACTIVITY DESCRIPTION |
| 1.0 |
| Felling, yarding, and decking of non-saw timber material in conjunction with commercial saw timber harvest. |
| 2.0 |
| Felling, yarding, and decking of non-saw timber material not in conjunction with commercial saw timber harvest. |
| 3.2 |
| Small Tree Thinning and Slash Treatment, Moderate Level of Effort |
| 4.2 |
| Road Closure - Barricade and Water Bar, Moderate Level of Effort. |
| ITEM NO. |
| ELECTIVE WORK ACTIVITY DESCRIPTION |
| 3.1 |
| Small Tree Thinning and Slash Treatment, Low Level of Effort |
| 3.3 |
| Small Tree Thinning and Slash Treatment, High Level of Effort |
| 4.1 |
| Road Closure - Barricade and Water Bar, Low Level of Effort |
| 4.3 |
| Road Closure - Barricade and Water Bar, High Level of Effort |
| 5.0 |
| Road Maintenance |
| 6.0* |
| Road Reconstruction |
| 7.0 |
| Road Decommissioning |
| 8.0 |
| Erosion Control Seeding |
| 9.0 |
| Aspen Enhancement |
| 10.0 |
| Juniper Cutting |
| 11.0 |
| Tree Marking |
| 12.0 |
| Tree Planting |
| 13.0 |
| Hand Fireline Construction |
| 14.0 |
| Machine Fireline Construction |
| 15.0 |
| Hand Manipulation of Fuel and Slash |
| 16.0 |
| Machine Manipulation of Fuel and Slash |
| 17.0 |
| Soil Productivity Enhancement Projects, Including De-compaction |
| 18.0 |
| Seeding, Planting and Culturing Native Species. |
| 19.0 |
| Meadow Enhancement |
| 20.0 |
| Timber Removal |
B.1 SCHEDULE OF ITEMS:
| ITEM NO. |
| DESCRIPTION |
| UNIT |
| Estimated Quantity |
| UNIT PRICE |
| TOTAL |
| 1.0 |
| Felling, yarding, and decking of non-saw material in conjunction with commercial harvest. Includes piling of landing slash. |
| Acre |
| 6,000 |
| $ |
| 2.0 |
| Small Tree Thinning. Felling, yarding, and decking of non-saw material not in conjunction with commercial harvest. Including piling of landing slash. |
| Acre |
| 6,000 |
| $ |
| 3.2 |
| Small Tree Thinning and Slash Treatment, Moderate Level of Effort |
| Acre |
| 10,000 |
| $ |
| 4.2 |
| Road Closure and Waterbaring, ModerateLevel of Effort. |
| Mile |
| 250 |
| $ |
TOTAL ALL ITEMS
NOTE: This is an Indefinite Delivery Indefinite Quantities contract. The quantities in the Schedule of Items are estimates only. Task orders will be issued to the awarded contractor identifying specific units. Prices will be negotiated for each task order issued based upon the work required. Task Orders with completion/delivery dates of more then a 12 month period will allow the awarded contractor to request an annual economic price adjustment (within the pre-priced task order). With few exceptions, timing of the work is dependant upon completion of timber harvest and fuel treatment activities.
THESE SCHEDULES ARE FOR EVALUATION PURPOSES. SEE SECTION L FOR BUSINESS PROPOSAL REQUIREMENTS.
* Items marked with an asterisk are considered Construction work for which construction clauses apply.
To be included in multiple-year Task Orders only:
Annual Economic Price Adjustment – Schedule B Only: The contractor shall state in the spaces below the economic price adjustment percentage to be used by the Government to compute future year prices. For instance, a 3% economic price adjustment factor is shown as 3% (rather than 103% or 1.03). Note that the economic price adjustment percentage can be either negative or positive. The factors stated will be compounded annually. If no percentage is entered, future year prices will be the same as base prices negotiated within the Task Order.
Year 2 _____ Year 3_____ Year 4_____ Year 5_____ Year 6____
Year 7 _____ Year 8_____ Year 9_____ Year 10_____
B.2
TIMBER REMOVAL PRICE SCHEDULE:
Values of timber products removed to be applied at escalated rates (see Appendix B, A.4.1, A.5, for sawtimber and fixed rate for all other products).
Example below shows volumes, values and products that will change with each actual Task order.
Rates Per Unit of Measure
Species
Product
Unit of Measure
Estimated Quantity
Base
Rate
Minimum
Acceptable Rate
Additional Deposits for Slash Disposal Additional Deposits for Road Maintenance Base Indices
Ponderosa Pine, Sugar Pine and Western White Pine
| Sawtimber |
| CCF |
| 2,864 |
| $1.00 |
| 1.52 |
| 0.24 |
| 2.12 |
| 218.36 |
White Fir and Other Coniferous
Species
| Sawtimber |
| CCF |
| 19,820 |
| $1.00 |
| 47.32 |
| .024 |
| 2.12 |
| 138.78 |
| Minimum Acceptable Total Bid |
| $ 942,235.68 |
| Bidder's Total Bid. (Total Value Bidding: Forest Service to determine proportionate rates for Species and Products.) 1/ |
| $ N/A |
| Optional Removal. Only the Fixed Rate Applies. |
| Fixed Rate |
| All Coniferous Species |
| Non- |
Sawtimber
| CCF |
| Unestimated |
| 0.25 |
| N/A |
| 2.12 |
| N/A |
1/ The Minimum Acceptable Total Bid will be determined with each task order issued using standard Forest Service appraisal methods. Costs to be included in the appraisal will be stump-to-truck, which includes piling of landings, haul, scale, building and closing of temporary roads, and any required deposits. Road maintenance, road construction and reconstruction, will be service items and not included in the appraisal. The Minimum Acceptable Total Bid will be reflective of current market conditions at the time the task order is issued, and will be applicable to products required to be removed under each task order. Nonsawtimber and biomass products can be removed by the Contractor with agreement by the Contracting Officer. Contractor agrees to pay $0.25/CCF for the nonsawtimber and biomass removed, plus deposits required road maintenance.
No entry is required for timber products in the contractor’s price proposal in response to this solicitation. However, in all future individual task orders, the Contractor will enter the Bidder’s Total Bid for products required to be removed. Forest Service will determine proportionate rates for species groups included in the above table. These rates will become the Current Contract Rates established for stumpage payments in Appendix B.
Timber Removal Specifications in Appendix B will be for the products removed to meet the goals and objective assigned to each stand in each task order issued, and will be updated with each issued task order.
C.3 Specifications
Revise the last sentence to read “Specifications for timber removal can be found in Appendix B, and associated road plans and specifications in Appendix C and D”.
H.5 AGAR 452.237-74 KEY PERSONNEL (FEB 1988)
Delete paragraph 2 “Provide the resume of the person to be designated as the Project Manager. Include a list of projects managed by this individual within the last three years, including reference names and phone numbers for these projects.”
Add the following paragraph 2: Provide the resume of each key person to be designated under this contract referenced in Section H.5, Key Personnel. Include a list of projects managed by this individual within the last three years, including reference names and phone numbers for these projects.
Incorporate the following attached documents by removal of the original documents and full replacement with the attached:
Revised Appendix A, Elective Work Items, 16 pages
Revised Appendix A, Mandatory Work Items, 9 pages
Revised Appendix B, Timber Removal Specification, 24 page
Appendix A Mandatory Work Activity Description edited numbering and titles. In 1.0, 2.0 and 3.2 under technical specification c) removed treatment around aspen clones. Minor edits for typos, numbering and format.
Appendix A Elective Work Activity Description edited numbering and titles. Added descriptions for 3.1 Small Tree Thinning and Slash Treatment, Low Level of Effort; 3.3 Small Tree Thinning and Slash Treatment, High Level of Effort; 11.0 Tree Marking; and 15.0 Hand Manipulation of Fuel and Slash. Minor edits for typos, numbering and format.
Appendix B Timber Removal Specifications, Added D.2 Escalation Proceedure, D.2.1 Unavailable Index, A.4.1 Escalated Rates, A.4.2 Fixed Rates, A.5 Indices Used in Quarterly Adjustment. Edited D.1 Current Contract Rates. Other minor edits for format, clarification and typos.
Any reference to maps or drawings within the solicitation will be provided at the time of task order negotiation within the specific scope of work being identified by unit.
Incorporate the attached Sustained Yield Policy
File details come from the government source that posted it. Updated .