e.Spec870.pdf
PDF 9 KB Posted
- Attached to
- South Zone rock Crushing
- Solicitation number
- AG-04M3-S-15-0047
About this file
E. Spec 870
View the file
Other files
| File | Type | Posted |
|---|---|---|
| f.Pit_Plan.pdf | ||
| g.05-2569.txt | TXT text file | |
| h.FirePlanr6fs6300521.rtf | RTF text file | |
| d.Spec850.pdf | ||
| i.Return_This_Copy.rtf | RTF text file | |
| c.Spec820.pdf | ||
| b.Vicinity_Map.pdf | ||
| a.AG-04M3-S-15-0047.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 870 – Materials Source Reclamation
Services Required
Contractor shall reclaim the materials source after production of the ordered quantity is complete.
Performance Standards
Reclaim the materials source as shown on the Pit Plan. All work shall be performed in accordance with MSHA 30 CFR, part 56.
Acceptable Quality Levels
Suitable and unsuitable residual materials are uniformly smoothed over floor, except oversized materials are consolidated in the location shown on the Pit Plan. Excavated slopes are uniformly shaped, and no steeper than 1:1. Pit floor is sloped toward the center, to retain water.
Payment
The accepted quantity will be paid at the contract price for the Section 870 pay item shown in the Schedule of Items. Payment will be full compensation for the work prescribed in this section.
Section 870 – Materials Source Reclamation