d.Spec850.pdf
PDF 15 KB Posted
- Attached to
- South Zone rock Crushing
- Solicitation number
- AG-04M3-S-15-0047
About this file
D. Spec 850
View the file
Other files
| File | Type | Posted |
|---|---|---|
| f.Pit_Plan.pdf | ||
| g.05-2569.txt | TXT text file | |
| h.FirePlanr6fs6300521.rtf | RTF text file | |
| i.Return_This_Copy.rtf | RTF text file | |
| c.Spec820.pdf | ||
| b.Vicinity_Map.pdf | ||
| a.AG-04M3-S-15-0047.rtf | RTF text file | |
| e.Spec870.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 850 – Mobilization
Services Required
Contractor shall provide all necessary equipment, personnel, materials, and supplies to:
• prepare the designated materials source for production
• produce and stockpile the quantity ordered, and
• reclaim the materials source when production has been completed.
Performance Standards
Prior to entering National Forest lands, all equipment is cleaned to minimize the potential spread of non-native invasive plant species.
Prudent actions, such as washing or using compressed air, are taken to clean equipment, prior to moving from one project area to another within the National Forest, to ensure that these species are not spread.
Equipment is made available for inspection before it is used on National Forest System lands.
Acceptable Quality Levels
Equipment that is not cleaned prior to entering National Forest lands is unacceptable, as is equipment that is in poor working condition, leaking fluids, or unsafe for operation.
Payment
The accepted quantity will be paid at the contract price for the Section 850 pay item shown in the Schedule of Items. Payment will be full compensation for the work prescribed in this section.
Partial payments for mobilization lump sum will be paid as follows:
(a) When 10 percent of the Section 820 quantity has been accepted, 50 percent of the mobilization item is available for payment.
(b) When 50 percent of the Section 820 quantity has been accepted, 100 percent of the mobilization item is available for payment.
Section 850 – Mobilization
File details come from the government source that posted it. Updated .