b.SolicitationAG-04M3-S-08-0068.rtf
RTF text file 354 KB Posted
- Solicitation number
- AG-04M3-S-08-0068
About this file
B. Solicitation
Text of this file
REQUEST FOR QUOTATION
PAGE OF PAGES
(THIS IS NOT AN ORDER)
THIS RFQ
IS
IS NOT A SMALL BUSINESS SET- ASIDE
1. REQUEST NO.
2. DATE ISSUED
3. REQUISITION/PURCHASE REQUEST NO.
4. CERT. FOR NAT.DEF.
RATING
AG-04M3-S-08-0068
August 13, 2008 20995 UNDER BDSA REG. 2 ä
AND/OR DMS REG. 1
5a. ISSUED BY
6. DELIVER BY (Date) Wallowa-Whitman National Forest Box 907 1550 Dewey Ave.
Baker City, OR 97814 See clause entitled, “Commencement, Prosecution and Completion of Work.”
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY
FOB DESTINATION
NAME
TELEPHONE NUMBER
X OTHER (See Schedule)
AREA CODE
NUMBER
9. DESTINATION
Jane Stuessy, Contract Specialist 523-1240
a. NAME OF CONSIGNEE
8. TO:
Emigrant Creek Ranger Station
a. NAME
b. COMPANY
b. STREET ADDRESS
265 Hwy 20 South
c. STREET ADDRESS
c. CITY
Hines
d. CITY
e. STATE
f. ZIP CODE
d. STATE
e. ZIP CODE
OR
97738
10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the September 02, 2008 submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(a) (b) (c) (d) (e) (f)
ECRD Sewer Lift Station Repair and Replacement
Sewer lift station replacements
LS
This solicitation is 100% Hubzone Set-aside
DUNS NUMBER____________________
Simplified Acquisition Procedures limit award to $100,000.00. Quotations will be kept confidential.
a. 10 CALENDAR DAYS (%)
b. 20 CALENDAR DAYS
c. 30 CALENDAR DAYS
d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT ä
NUMBER
PERCENTAGE
NOTE: Additional provisions and representations X are are not attached.
13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
15. DATE OF
a. NAME OF QUOTER
SIGN QUOTATION
QUOTATION
b. STREET ADDRESS
16. SIGNER
a. NAME (Type or print)
b. TELEPHONE
c. COUNTY
AREA CODE
d. CITY
e. STATE
f. ZIP CODE
c. TITLE (Type or Print)
NUMBER
NSN 7540-01-152-8084
Previous edition not usable 18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
| HYPERLINK \l "_Toc206378036" C. Description/Specifications/Statement of Work | 4 |
| HYPERLINK \l "_Toc206378037" 1. 452.211-72 Statement of Work/Specifications. (FEB 1988) | 4 |
| HYPERLINK \l "_Toc206378038" 2. 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) | 4 |
| HYPERLINK \l "_Toc206378039" E. Inspection and Acceptance | 4 |
| HYPERLINK \l "_Toc206378040" 1. Inspection | 4 |
| HYPERLINK \l "_Toc206378041" 2. 52.246-1 Contractor Inspection Requirements. (APR 1984) | 4 |
| HYPERLINK \l "_Toc206378042" 3. 52.252-2 Clauses Incorporated by Reference. (FEB 1998) | 4 |
| HYPERLINK \l "_Toc206378043" F. Deliveries or Performance | 4 |
| HYPERLINK \l "_Toc206378044" 1. 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) | 4 |
| HYPERLINK \l "_Toc206378045" 2. 52.242-14 Suspension of Work. (APR 1984) | 4 |
| HYPERLINK \l "_Toc206378046" 3. 52.252-2 Clauses Incorporated by Reference. (FEB 1998) | 4 |
| HYPERLINK \l "_Toc206378047" G. Contract Administration Data | 4 |
| HYPERLINK \l "_Toc206378048" 1. 452.215-73 Postaward Conference. (NOV 1996) | 4 |
| HYPERLINK \l "_Toc206378049" H. Special Contract Requirements | 5 |
| HYPERLINK \l "_Toc206378050" 1. Safety | 5 |
| HYPERLINK \l "_Toc206378051" 2. Emergency Response (AGAR 452.236-77) (NOV 1996) | 5 |
| HYPERLINK \l "_Toc206378052" 3. Suspensions for Other Than Government’s Convenience | 5 |
| HYPERLINK \l "_Toc206378053" 4. Order of Precedence --Construction | 5 |
| HYPERLINK \l "_Toc206378054" I. Contract Clauses | 6 |
| HYPERLINK \l "_Toc206378055" 1. 52.204-7 Central Contractor Registration. (APR 2008) | 6 |
| HYPERLINK \l "_Toc206378056" 2. 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (SEP 2006) | 6 |
| HYPERLINK \l "_Toc206378057" 3. 52.219-3 Notice of Total HUBZone Set-Aside. (JAN 1999) | 6 |
| HYPERLINK \l "_Toc206378058" 4. 52.222-3 Convict Labor. (JUN 2003) | 6 |
| HYPERLINK \l "_Toc206378059" 5. 52.222-5 Davis-Bacon Act--Secondary Site of the Work. (JUL 2005) | 6 |
| HYPERLINK \l "_Toc206378060" 6. 52.222-6 Davis-Bacon Act. (JUL 2005) | 7 |
| HYPERLINK \l "_Toc206378061" 7. 52.222-7 Withholding of Funds. (FEB 1988) | 7 |
| HYPERLINK \l "_Toc206378062" 8. 52.222-8 Payrolls and Basic Records. (FEB 1988) | 7 |
| HYPERLINK \l "_Toc206378063" 9. 52.222-9 Apprentices and Trainees. (JUL 2005) | 7 |
| HYPERLINK \l "_Toc206378064" 10. 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) | 7 |
| HYPERLINK \l "_Toc206378065" 11. 52.222-11 Subcontracts (Labor Standards). (JUL 2005) | 7 |
| HYPERLINK \l "_Toc206378066" 12. 52.222-12 Contract Termination - Debarment. (FEB 1988) | 7 |
| HYPERLINK \l "_Toc206378067" 13. 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (FEB 1988) | 7 |
| HYPERLINK \l "_Toc206378068" 14. 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) | 7 |
| HYPERLINK \l "_Toc206378069" 15. 52.222-15 Certification of Eligibility. (FEB 1988) | 7 |
| HYPERLINK \l "_Toc206378070" 16. 52.222-21 Prohibition of Segregated Facilities. (FEB 1999) | 7 |
| HYPERLINK \l "_Toc206378071" 17. 52.222-26 Equal Opportunity. (MAR 2007) | 7 |
| HYPERLINK \l "_Toc206378072" 18. 52.222-27 Affirmative Action Compliance Requirements for Construction. (FEB 1999) | 7 |
| HYPERLINK \l "_Toc206378073" 19. 52.222-36 Affirmative Action for Workers with Disabilities. (JUN 1998) | 7 |
| HYPERLINK \l "_Toc206378074" 20. 52.223-5 Pollution Prevention and Right-to-Know Information, Alternate I. (AUG 2003) | 7 |
| HYPERLINK \l "_Toc206378075" 21. 52.225-9 Buy American Act - Construction Materials. (JAN 2005) | 8 |
| HYPERLINK \l "_Toc206378076" 22. 52.225-13 Restrictions on Certain Foreign Purchases. (FEB 2006) | 10 |
| HYPERLINK \l "_Toc206378077" 23. 52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007) | 10 |
| HYPERLINK \l "_Toc206378078" 24. 52.228-2 Additional Bond Security. (OCT 1997) | 10 |
| HYPERLINK \l "_Toc206378079" 25. 52.228-11 Pledges of Assets. (FEB 1992) | 10 |
| HYPERLINK \l "_Toc206378080" 26. 52.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995) | 10 |
| HYPERLINK \l "_Toc206378081" 27. 52.228-13 Alternative Payment Protections. (JUL 2000) | 10 |
| HYPERLINK \l "_Toc206378082" 28. 52.228-14 Irrevocable Letter of Credit. (DEC 1999) | 11 |
| HYPERLINK \l "_Toc206378083" 29. 52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002) | 11 |
| HYPERLINK \l "_Toc206378084" 30. 52.232-23 Assignment of Claims. (JAN 1986) | 11 |
| HYPERLINK \l "_Toc206378085" 31. 52.232-27 Prompt Payment For Construction Contracts. (SEP 2005) | 11 |
| HYPERLINK \l "_Toc206378086" 32. 52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (OCT 2003) | 11 |
| HYPERLINK \l "_Toc206378087" 33. 52.233-1 Disputes. (JUL 2002) | 11 |
| HYPERLINK \l "_Toc206378088" 34. 52.233-3 Protest after Award. (AUG 1996) | 11 |
| HYPERLINK \l "_Toc206378089" 35. 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) | 11 |
| HYPERLINK \l "_Toc206378090" 36. 52.236-5 Material and Workmanship. (APR 1984) | 11 |
| HYPERLINK \l "_Toc206378091" 37. 52.236-7 Permits and Responsibilities. (NOV 1991) | 11 |
| HYPERLINK \l "_Toc206378092" 38. 52.236-13 Accident Prevention. (NOV 1991) | 11 |
| HYPERLINK \l "_Toc206378093" 39. 52.236-14 Availability and Use of Utility Services. (APR 1984) | 12 |
| HYPERLINK \l "_Toc206378094" 40. 52.236-26 Preconstruction Conference. (FEB 1995) | 12 |
| HYPERLINK \l "_Toc206378095" 41. 52.243-5 Changes and Changed Conditions. (APR 1984) | 12 |
| HYPERLINK \l "_Toc206378096" 42. 52.244-6 Subcontracts for Commercial Items. (MAR 2007) | 12 |
| HYPERLINK \l "_Toc206378097" 44. 52.252-2 Clauses Incorporated by Reference. (FEB 1998) | 13 |
| HYPERLINK \l "_Toc206378098" 45. 452.228-70 Alternative Forms of Security. (NOV 1996) | 13 |
| HYPERLINK \l "_Toc206378099" 46. 452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996) | 13 |
| HYPERLINK \l "_Toc206378100" 47. 452.236-71 Prohibition Against the Use of Lead-Based Paint. (NOV 1996) | 13 |
| HYPERLINK \l "_Toc206378101" 48. 452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996) | 13 |
| HYPERLINK \l "_Toc206378102" 49. 452.236-77 Emergency Response. (NOV 1996) | 13 |
| HYPERLINK \l "_Toc206378103" J. List of Documents, Exhibits, and Other Attachments | 13 |
| HYPERLINK \l "_Toc206378104" 1. Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (FAR 52.211-3) (JUN 1988) | 13 |
| HYPERLINK \l "_Toc206378105" 2. List of Attachments | 13 |
| HYPERLINK \l "_Toc206378106" K. Representations, Certifications, and Other Statements of Offerors or Respondents | 14 |
| HYPERLINK \l "_Toc206378107" 1. 52.204-8 Annual Representations and Certifications. (JAN 2006) | 14 |
| HYPERLINK \l "_Toc206378108" 2. 52.219-28 Post-Award Small Business Program Rerepresentation. (JUN 2007) | 14 |
| HYPERLINK \l "_Toc206378109" 3. 452.219-70 Size Standard and NAICS Code Information. (SEP 2001) | 14 |
| HYPERLINK \l "_Toc206378110" 4. Government Employees, Former USDA Employees, and USDA Retirees | 15 |
| HYPERLINK \l "_Toc206378111" L. Instructions, Conditions, and Notices to Offerors or Respondents | 15 |
| HYPERLINK \l "_Toc206378112" 1. Technical Proposal Instructions | 15 |
| HYPERLINK \l "_Toc206378113" 2. 52.215-5 Facsimile Proposals. (OCT 1997) | 16 |
| HYPERLINK \l "_Toc206378114" 3. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment opportunity for Construction. (FEB 1999) | 16 |
| HYPERLINK \l "_Toc206378115" 4. 52.225-10 Notice of Buy American Act Requirement - Construction Materials. (MAY 2002) | 17 |
| HYPERLINK \l "_Toc206378116" 5. 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) | 18 |
| HYPERLINK \l "_Toc206378117" 6. 452.204-70 Inquiries. (FEB 1988) | 18 |
| HYPERLINK \l "_Toc206378118" M. Evaluation Factors for Award | 18 |
| HYPERLINK \l "_Toc206378119" 1. Evaluations of Quotes | 18 |
C. Description/Specifications/Statement of Work
1. 452.211-72 Statement of Work/Specifications. (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J. (End of Clause)
2. 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract. (End of Clause)
E. Inspection and Acceptance
1. Inspection Contractor is responsible for inspection of their own work and quality control. If the government feels like there is an error, they may request an inspection with the contractor to validate the concern.
2. 52.246-1 Contractor Inspection Requirements. (APR 1984)
3. 52.252-2 Clauses Incorporated by Reference. (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.acquisition.gov/comp/far/index.html (End of clause)
F. Deliveries or Performance
1. 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 calendar days after the effective date of the notice to proceed. The time stated for completion shall include final cleanup of the premises. Work is estimated to begin October 15, 2008. (End of clause)
2. 52.242-14 Suspension of Work. (APR 1984)
3. 52.252-2 Clauses Incorporated by Reference. (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.acquisition.gov/comp/far/index.html (End of clause)
G. Contract Administration Data
1. 452.215-73 Postaward Conference. (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled within ten days after the date of contract award. The conference will be held at the Emigrant Creek Ranger District Office, Hines, Oregon or otherwise mutually agreed upon location. (End of Clause)
H. Special Contract Requirements
1. Safety Prior to allowing any work to commence on the project, the Contractor must submit a job specific Safety Plan, to the Contracting Officer, that is in accordance with State of Oregon OSHA Regulations. Such safety plan must include all tasks and related activities anticipated to successfully complete the work.
Notwithstanding the submission of a Safety Plan, the Government may stop or suspend this contract in part or in total for any action or situation deemed hazardous or life threatening until such time as the situation is corrected.
Shoring is required for this project per Oregon OSHA requirements.
2. Emergency Response (AGAR 452.236-77) (NOV 1996)
(a) Contractor’s Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, Protection of existing vegetation, structures, equipment, utilities, and improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contactor or the Contractor’s agents or employees.
(b) Contractor’s Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor’s Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the Changes clause, FAR 52.243-4.
(NOTE: See Fire Plan Requirements referenced in the attachments.)
3. Suspensions for Other Than Government’s Convenience The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) Weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to become muddy or unsuitable; or (2) Failure of the Contractor to comply with Specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by his/her operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for equitable adjustment.
4. Order of Precedence --Construction Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
| (1) | The Schedule (excluding the specifications). | |
| (2) | Representations and other instructions. | |
| (3) | Contract clauses. | |
| (4) | Other documents, exhibits, and attachments. | |
| (5) | Special Project Specifications. | |
| (6) | Standard Specifications, (including FAR clauses). | |
| (7) | (a) | Drawings, figured dimensions over scaled dimensions. |
| (b) | Drawings, large scale contract drawings over small scale contract drawings. | |
| (c) | Schedules on contract drawings over any conflicting notations on contract drawings. | |
| (8) | Shop drawings. |
I. Contract Clauses
1. 52.204-7 Central Contractor Registration. (APR 2008)
2. 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (SEP 2006)
3. 52.219-3 Notice of Total HUBZone Set-Aside. (JAN 1999)
4. 52.222-3 Convict Labor. (JUN 2003)
5. 52.222-5 Davis-Bacon Act--Secondary Site of the Work. (JUL 2005) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Davis-Bacon Act, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work. (End of provision)
6. 52.222-6 Davis-Bacon Act. (JUL 2005)
7. 52.222-7 Withholding of Funds. (FEB 1988)
8. 52.222-8 Payrolls and Basic Records. (FEB 1988)
9. 52.222-9 Apprentices and Trainees. (JUL 2005)
10. 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)
11. 52.222-11 Subcontracts (Labor Standards). (JUL 2005)
12. 52.222-12 Contract Termination - Debarment. (FEB 1988)
13. 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (FEB 1988)
14. 52.222-14 Disputes Concerning Labor Standards. (FEB 1988)
15. 52.222-15 Certification of Eligibility. (FEB 1988)
16. 52.222-21 Prohibition of Segregated Facilities. (FEB 1999)
17. 52.222-26 Equal Opportunity. (MAR 2007)
18. 52.222-27 Affirmative Action Compliance Requirements for Construction. (FEB 1999)
19. 52.222-36 Affirmative Action for Workers with Disabilities. (JUN 1998)
20. 52.223-5 Pollution Prevention and Right-to-Know Information, Alternate I. (AUG 2003)
(a) Definitions. As used in this clause— “Priority chemical” means a chemical identified by the Interagency Environmental Leadership Workgroup or, alternatively, by an agency pursuant to Section 503 of Executive Order 13148 of April 21, 2000, Greening the Government through Leadership in Environmental Management.
“Toxic chemical” means a chemical or chemical category listed in 40 CFR 372.65.
(b) Executive Order 13148 requires Federal facilities to comply with the provisions of the Emergency Planning and Community Right-to-Know Act of 1986 (EPCRA) (42 U.S.C. 11001-11050) and the Pollution Prevention Act of 1990 (PPA) (42 U.S.C. 13101-13109).
(c) The Contractor shall provide all information needed by the Federal facility to comply with the following:
(1) The emergency planning reporting requirements of Section 302 of EPCRA.
(2) The emergency notice requirements of Section 304 of EPCRA.
(3) The list of Material Safety Data Sheets, required by Section 311 of EPCRA.
(4) The emergency and hazardous chemical inventory forms of Section 312 of EPCRA.
(5) The toxic chemical release inventory of Section 313 of EPCRA, which includes the reduction and recycling information required by Section 6607 of PPA.
(6) The toxic chemical, priority chemical, and hazardous substance release and use reduction goals of Sections 502 and 503 of Executive Order 13148.
(c)(7) The environmental management system as described in Section 401 of E.O. 13148.
(End of clause)
21. 52.225-9 Buy American Act - Construction Materials. (JAN 2005)
(a) Definitions. As used in this clause -
"Component" means an article, material, or supply incorporated directly into a construction material.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
"Cost of components" means -
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
"Domestic construction material" means -
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States, if the cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.
"Foreign construction material" means a construction material other than a domestic construction material.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b) (2) and (b) (3) of this clause.
(2) This requirement does not apply to the construction material or components listed by the Government as follows: None.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that -
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including -
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:
| Foreign construction material | _______ | _______ | _______ |
| Domestic construction material | _______ | _______ | _______ |
| Item 2: | _______ | _______ | _______ | |
| Foreign construction material | _______ | _______ | _______ |
Domestic construction material
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
22. 52.225-13 Restrictions on Certain Foreign Purchases. (FEB 2006)
23. 52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)
24. 52.228-2 Additional Bond Security. (OCT 1997)
25. 52.228-11 Pledges of Assets. (FEB 1992)
26. 52.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995)
27. 52.228-13 Alternative Payment Protections. (JUL 2000)
(a) The Contractor shall submit one of the following payment protections: (1) payment bond, (2) irrevocable letter of credit (ILC), (3) certified or cashier’s check, bank draft, post office, (4) money order or currency.
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 15 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement. (End of clause)
28. 52.228-14 Irrevocable Letter of Credit. (DEC 1999)
29. 52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002)
30. 52.232-23 Assignment of Claims. (JAN 1986)
31. 52.232-27 Prompt Payment For Construction Contracts. (SEP 2005)
32. 52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (OCT 2003)
33. 52.233-1 Disputes. (JUL 2002)
34. 52.233-3 Protest after Award. (AUG 1996)
35. 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)
36. 52.236-5 Material and Workmanship. (APR 1984)
37. 52.236-7 Permits and Responsibilities. (NOV 1991)
38. 52.236-13 Accident Prevention. (NOV 1991)
(a) The Contractor shall provide and maintain work environments and procedures which will -
(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;
(2) Avoid interruptions of Government operations and delays in project completion dates; and
(3) Control costs in the performance of this contract.
(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall -
(1) Provide appropriate safety barricades, signs, and signal lights;
(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910; and
(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.
(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.
(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor's representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts. (End of clause)
39. 52.236-14 Availability and Use of Utility Services. (APR 1984)
40. 52.236-26 Preconstruction Conference. (FEB 1995)
41. 52.243-5 Changes and Changed Conditions. (APR 1984)
42. 52.244-6 Subcontracts for Commercial Items. (MAR 2007)
(a) Definitions. As used in this clause--
"Commercial item" has the meaning contained in Federal Acquisition Regulation 2.101, Definitions.
"Subcontract" includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.
(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or non-developmental items as components of items to be supplied under this contract.
(c)(1) The Contractor shall insert the following clauses in subcontracts for commercial items:
(i) 52.219-8, Utilization of Small Business Concerns (MAY 2004) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $550,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(ii) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).
(iii) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (SEP 2006) (38 U.S.C. 4212(a)).
(iv) 52.222-36, Affirmative Action for Workers with Disabilities (JUN 1998) (29 U.S.C. 793).
(v) 52.222-39, Notification of Employee Rights Concerning Payment of Union Dues or Fees (DEC 2004) (E.O. 13201). Flow down as required in accordance with paragraph (g) of FAR clause 52.222-39).
(vi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241 and 10 U.S.C. 2631) (flow down required in accordance with paragraph (d) of FAR clause 52.247-64).
(2) While not required, the Contractor may flow down to subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.
43. 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). (APR 1984)
44. 52.252-2 Clauses Incorporated by Reference. (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.acquisition.gov/comp/far/index.html (End of clause)
45. 452.228-70 Alternative Forms of Security. (NOV 1996) If furnished as security, money orders, drafts, cashiers checks, or certified checks shall be drawn payable to: USDA Forest Service, Region 6 AQM. (End of Provision)
46. 452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996)
47. 452.236-71 Prohibition Against the Use of Lead-Based Paint. (NOV 1996)
48. 452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)
49. 452.236-77 Emergency Response. (NOV 1996) J. List of Documents, Exhibits, and Other Attachments
1. Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (FAR 52.211-3) (JUN 1988) Review the following to determine which are needed. The list includes the most commonly used specs.
The specifications cited in this solicitation may be obtained from:
Specification Address AASHTO Standards American Association of State Highway and Transportation Officials 341 National Press Building Washington, DC 20024 ASTM Standards American Society for Testing Materials 1916 Race Street Philadelphia, PA 19103 (215) 199-5462
MUTCD
Manual on Uniform Traffic Control Devices Superintendent of Documents, U.S. Government Printing Office Washington, DC 20402 The request should identify the solicitation number and the specification requested by date, title, and number, as cited in the solicitation.
2. List of Attachments The following attachments are made a part of this solicitation and any resultant contract.
Title Pages
1. Specifications
2. Project Drawings, Site Map
3. DOL General Decision No. OR080001, dated 07/25/2008, OR1
4. Fire Protection and Suppression (R6-FS-6300-52)
5. Contractor Experience Form
K. Representations, Certifications, and Other Statements of Offerors or Respondents
1. 52.204-8 Annual Representations and Certifications. (JAN 2006) (a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237110.
(2) The small business size standard is $31.0M.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (c) of this provision applies.
(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (c) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (c) applies.
[ ] (ii) Paragraph (c) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) The offeror has completed the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov. After reviewing the ORCA database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on ORCA. (End of Provision)
2. 52.219-28 Post-Award Small Business Program Rerepresentation. (JUN 2007)
3. 452.219-70 Size Standard and NAICS Code Information. (SEP 2001) The North American Industrial Classification System Code(s) and business size standard(s) describing the products and/or services to be acquired under this solicitation are listed below:
Contract line item(s): All
- NAICS Code 237110
- Size Standard $31.0M (End of provision)
4. Government Employees, Former USDA Employees, and USDA Retirees The offeror/quoter represents and certifies that--
| (a) | It is, is not a current Federal Government employee. |
| (b) | It is, is not a former USDA EMPLOYEE. |
| (c) | It is, is not a retired USDA employee. If retired, give date of retirement ________________. |
| (d) | It is, is not related to a current Forest Service employee on the Blue Mountain Acquisition Management Area. If so, list employee's name and location. ____________________________________ |
| (e) | The firm is, is not substantially owned or controlled by a former USDA employee or retiree. |
L. Instructions, Conditions, and Notices to Offerors or Respondents
1. Technical Proposal Instructions
(a) General Instructions. Proposals submitted in response to this solicitation shall be furnished in the following format with the numbers of copies as specified below:
(1) Proposals shall be submitted in two parts - a technical proposal and a price proposal. Each part shall be separate and complete in itself so that evaluation of one may be accomplished independently of the other. The price proposal shall be submitted with the solicitation forms, no breakdown of the unit price is required. The technical proposal must not contain reference to cost.
(2) Offerors are cautioned that sufficient and detailed information must be presented in their technical proposals to enable the Government to evaluate their proposals fully in accordance with the evaluation and award criteria contained herein. The Government is not obligated to ask for additional information and in the absence of appropriate information, the proposal will be rated deficient.
| (3) | Offerors shall submit their proposal(s) in the following format and the quantities specified: |
| (i) 1 copy of the completed, signed offer (The solicitation package) | |
| (ii) | 1 copy of the Technical Proposal // Documentation Resulting from the Government’s Specifications |
(b) Technical Proposal.
1. Relevant Past Performance – Offerors shall submit past performance information for their firm and any proposed major subcontractors performing more than 20% of the work. Performance information may be obtained from references provided.
The offeror shall submit a list of all relevant projects completed during the past three years and all contracts and subcontracts in progress. The list should include, but is not limited to, contracts and subcontracts similar in nature and complexity to that required by this solicitation. Include contracts with the Federal Government, agencies of state, and local governments, and commercial customers.
Include the following information for each contract/subcontract:
| A) | Project name |
| B) | Contract number |
| C) | Location |
| D) | Year of completion, or anticipated completion date if in progress |
| E) | Contract administrator's name, phone and facsimile numbers |
| F) | Your crew supervisors and any inspectors who worked on the project |
| G) | Project size |
| H) | Quality of work performed |
| I) | Whether the contract was completed timely |
The offeror may provide information on problems encountered on the contracts and subcontracts listed and the corrective actions taken to resolve those problems. The Government may obtain information from existing contract files. Because discussions may not be held, the offeror may refute any problems in the original offer.
Note: If the contractor does not provide past performance information, or indicate a lack of Past Performance with its offer, the Contracting Officer need not pursue further information if it is clear that the offeror’s price is not competitive.
The Office of Management and Budget (OMB) has authorized Federal agencies to collect past performance information under OMB clearance number 9000-0142.
(c) Price: A firm’s completion and submission of Standard Form 18 and Section B’s Schedule of Items constitutes the fulfillment of the Government’s price proposal requirements under this solicitation.
2. 52.215-5 Facsimile Proposals. (OCT 1997)
(a) Definition. "Facsimile proposal," as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via facsimile machine.
(b) Offerors may submit facsimile proposals as responses to this solicitation. Facsimile proposals are subject to the same rules as paper proposals.
(c) The telephone number of receiving facsimile equipment is: 5415231215.
(d) If any portion of a facsimile proposal received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document -
(1) The Contracting Officer immediately shall notify the offeror and permit the offeror to resubmit the proposal;
(2) The method and time for resubmission shall be prescribed by the Contracting Officer after consultation with the offeror; and
(3) The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness, provided the offeror complies with the time and format requirements for resubmission prescribed by the Contracting Officer.
(e) The Government reserves the right to make award solely on the facsimile proposal. However, if requested to do so by the Contracting Officer, the apparently successful offeror promptly shall submit the complete original signed proposal. (End of provision)
3. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment opportunity for Construction. (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for Minority Participation for Each Trade 3.8% Goals for Female Participation for Each Trade 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the -
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is central Oregon area. (End of provision)
4. 52.225-10 Notice of Buy American Act Requirement - Construction Materials. (MAY 2002)
(a) Definitions. Construction material, domestic construction material, and foreign construction material, as used in this provision, are defined in the clause of this solicitation entitled Buy American Act - Construction Materials (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b) (2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested -
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations. (End of provision)
5. 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Amd2.doc | DOC document | |
| Amd1.doc | DOC document | |
| e.DOLGeneralDecision.htm | HTM file | |
| d.ProjectDrawings.pdf | ||
| c.Specifications.doc | DOC document | |
| g.ContractorExperienceForm.rtf | RTF text file | |
| a.QuotersPacket.rtf | RTF text file | |
| f.FireProtectionAndSuppression.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .