AMENDMENT 1

View the file

Other files

File Type Posted
Amd2.doc DOC document
e.DOLGeneralDecision.htm HTM file
d.ProjectDrawings.pdf PDF
c.Specifications.doc DOC document
g.ContractorExperienceForm.rtf RTF text file
b.SolicitationAG-04M3-S-08-0068.rtf RTF text file
a.QuotersPacket.rtf RTF text file
f.FireProtectionAndSuppression.rtf RTF text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTRACT ID CODE

PAGE OF PAGES

1 1

2 AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

09/04/2008

4. REQUISITION/PUCHASE REQ. NO.

20995

5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

Wallowa-Whitman National Forest PO Box 907, 1550 Dewey Avenue Baker City, OR 97814

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code)

9A.Amend Solicitation. AG-04M3-S-08-0068

9B.Dated August 13, 2008

10A.Mod Contract/Order #

10B.Dated (see Item 13) code facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [X] is extended [ ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) ECRD Sewer Lift Station Repair and Replacement Quotes are due September 15, 2008 at 4:30 PDT.

Pricing and Relevant Past Performance information may be faxed to (541)523-1215.

3. In accordance with FAR 52.228-13, Alternative Payment Protections are required in contracts for construction, when the actual value exceeds $30,000 but does not exceed $100,000. The contractor shall submit one of the following payment protections: (1) payment bond; (2) irrevocable letter of credit (ILC); (3) certified or cashier’s check, bank draft, postovvice; (4) money order or currency. The amount of the payment protection shall be 100 percent of the contract price.

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

Contracting Officer

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED

16B.UNITED STATES OF AMERICA

By______________________________ (Signature of Contracting Officer)