a. amend1.doc

DOC document 74 KB Posted

Attached to
Sumpter Valley Interpretive Trail Construction - Malheur National Forest
Solicitation number
AG-04KK-S-10-0005
Issued by

About this file

Amendment 1 to Solicitation AG-04KK-S-10-0005. This amendment changes the first page of the solicitation to reflect the true date that offers are due. All offers are due by 4 30 pm on August 18 2010.

View the file

Other files

File Type Posted
a. amend2.doc DOC document
g. SF-24.pdf PDF
h. SF-25.pdf PDF
i. SF-25A.pdf PDF
f. 19_r6_fs_6300_52.doc DOC document
d. TRAIL DWGS.pdf PDF
c. SUMPTERVALLEYTRAIL_SPECS.docx DOCX document
b. bidders_packet0005.doc DOC document
j. SF-25B.pdf PDF
e. OR2_dvb.mht MHT file
a. AG04KKS100005.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-04KK-S-10-0005

Sumpter Valley Interpretive Trail Construction—Amendment 1

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
CONTRACT ID CODE
PAGE OF PAGES

2 AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

08/09/2010

4. REQUISITION/PUCHASE REQ. NO.
5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

Malheur National Forest PO Box 909, John Day, OR 97845

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code)
X
9A.Amend Solicitation. AG-04KK-S-10-0005

9B.Dated 07/16/2010

10A.Mod Contract/Order

10B.Dated (see Item 13)

code
facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [X] is extended to August 18, 2010 at 4:30pm PST [ ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) Sumpter Valley Interpretive Trail Construction—Malheur National Forest This amendment is to make the date of submission of offers August 18, 2010 at 4:30pm PST. The first page of the original solicitation stated that the date that the offers were due was incorrect. Please replace the existing page 1 of 25 of the solicitation with the attached.

This change is indicated by a vertical line in the left margin.

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED

16B.UNITED STATES OF AMERICA

By______________________________ (Signature of Contracting Officer)

16C.DATE SIGNED

Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243 This page has intentionally been left blank.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-04KK-S-10-0005

2. TYPE OF SOLICITATION

FORMCHECKBOX

SEALED BID (IFB)

FORMCHECKBOX

NEGOTIATED (RFP)

3. DATE ISSUED

07/16/2010

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

419518

6. PROJECT NO.

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

Malheur National Forest

431 Patterson Bridge Road

P.O. Box 909

John Day, OR 97845

9. FOR INFORMATION

CALL:

A. NAME

Sarah Ackerman—Contract Specialist Chris Wall—Technical Specialist B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 541-575-3155

541-575-3036

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

1. Price Range

AG-04KK-S-10-0005

Sumpter Valley Interpretive Trail Construction

Harney County, Oregon

Malheur National Forest

Supervisor’s Office

The Government's estimate is:

between $25,000 and $100,000.

11. The Contractor shall begin performance within 14 calendar days and complete it within 30 calendar days after receiving

FORMCHECKBOX

award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See F-1.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

FORMCHECKBOX

YES

FORMCHECKBOX

NO (IF OFFER IS GREATER THAN $100,000.)

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A.

Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 4:30 pm local time 08/18/2010. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B.

An offer guarantee

FORMCHECKBOX

is, FORMCHECKBOX is not required. (IF OFFER IS GREATER THAN $100,000.)

C.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D.

Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

1442-101

STANDARD FORM 1442 (REV. 4-85)

Computer Generated

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

File details come from the government source that posted it. Updated .