Attachment_2_Trail_Bridge_Superstructure_Supply_Drawings.pdf
PDF 1 MB Posted
- Attached to
- DESCHUTES NATIONAL FOREST - DESIGN, FABRICATION & DELIVERY OF A PREFABRICATED STEEL TRAIL BRIDGE
- Solicitation number
- AG-04GG-S-15-0012
About this file
Attachment 2 - Drawings
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Whychus 1605 Trail Bridge Superstructure Supply 1Title Sheet (Signed)
| Whychus 1605 Trail Bridge Superstructure Supply 2 Area (1) |
| Whychus 1605 Trail Bridge Superstructure Supply 3 Location (1) |
| Whychus 1605 Trail Bridge Superstructure Supply 4 STEEL BRIDGE TYPICAL DRAWINGS (1) |
| Whychus 1605 Trail Bridge Superstructure Supply 5 STEEL BRIDGE TYPICAL DRAWINGS (1) |
| Whychus 1605 Trail Bridge Superstructure Supply 6 STEEL BRIDGE TYPICAL DRAWINGS (1) |
File details come from the government source that posted it. Updated .