Amendment one to solicitation this amendment DOES NOT extend time for submission of offers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3 Word Doc.docx | DOCX document | |
| Amendment 2 Princess Creek Launch.docx | DOCX document | |
| Pre Bid Meeting Notes.docx | DOCX document | |
| Final Drawings for Princess Creek Boat Launch Parking Areas.pdf | ||
| Solicitation_Princess_RFP.doc | DOC document | |
| DOL Wage Rate OR2_dvb.htm | HTM file | |
| SF 25.pdf | ||
| SF 25A.pdf | ||
| Specifications.doc | DOC document | |
| SF 24.pdf | ||
| Attachment 04 R6_Fire_Requirements.rtf | RTF text file | |
| Spec List.xls | XLS spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT CODE
J
PAGE OF
PAGES
2. AMENDMENT/MODIFICATION NO. 1
3. EFFECTIVE DATE
06/18/2010
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. Deschutes NF 1001 SW Emkay Drive
Bend, OR 97702
| 7. ADMINISTERED BY (If other than Item 6) Code |
Fremont Winema NF 1301 S G Street
Lakeview, OR 97630
Mark L LaCroix
8. NAME & ADDRESS OF CONTRACTOR (No., Street, county, State and ZIP Code)
| X |
| 9A. AMENDMENT OF SOLICIATION NO. |
AG-04GG-S-10-0012
9B. DATED (SEE ITEM 11)
06/15/2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
CODE
FACILITY CODE
10B. DATED:
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA: Not Applicable
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). |
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF
D. OTHER:
E. IMPORTANT: Contractor FORMCHECKBOX is not, () is required to sign this document and return copy to the issuing office with proposal.
SEE PAGE TWO
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
///SIGNED///
MARK LACROIX Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
06/18/2010
NSN 7540-01-152-8070
STANDARD FORM 30 (REV. 10-83)
Previous edition unusable
Prescribed by GSA FAR (48 CFR) 53.243
SF 30 Continuation Sheet Solicitation AG-04P5-S-10-0012 Amendment Attachment for Princess Creek Boat Launch & Parking Areas
The subject solicitation is amended to reflect the following:
1) Change specification: CSI Specification, DRIVEN STEEL PILES - VIBRATORY 02363, 3.1 GENERAL, C., page 67, from (Cutoff elevation of each pile shall be as shown on the drawings) to read (Cutoff elevation of each pile shall be 4793’ in reference to elevations shown on Sheet #13 on the drawings, a Detail drawing will be provided at Post Award Conference)
2) Change specification: CSI Specification, DRIVEN STEEL PILES - VIBRATORY 02363, 3.5 POSITION AND TOLERANCES, B., page 67, from (The cutoff elevation of the piles shall be as indicated on the drawings. All cutoffs of the pilings shall become property of the Contractor and shall be disposed of by the Contractor, in a legal manner satisfactory to the Owner.) to read (The cutoff elevation of the piles shall be 4793’ in reference to elevations shown on Sheet #13 on the drawings, a Detail drawing will be provided at Post Award Conference. All cutoffs of the pilings shall become property of the Contractor and shall be disposed of by the Contractor, in a legal manner satisfactory to the Owner.)
3) Change specification: CSI Specification, NORMAL WEIGHT STRUCTURAL CONCRETE 03311, 3.6 FINISHING CONCRETE, A. CAST-IN-PLACE and PLANKS:, page 79, from (Finish concrete with deep V-groove finish with tools furnished by the Oregon State Marine Board Facilities Engineer, phone # (503) 373-1405, in accordance with published "finish guidelines". Contractor shall demonstrate previous acceptable experience with this type of finish, or shall construct a test panel as specified and approved by the Engineer. The Contractor shall clean and return the finish tools, at the Contractors expense, to the Oregon State Marine Board, 435 Commercial St., Salem, Oregon 97301) to read (Finish concrete with deep V-groove finish with tools, it is the contractor's responsibility to obtain the V-Groove tools needed to groove the Cast-In-Place concrete section of the ramp, in accordance with published "finish guidelines". Contractor shall demonstrate previous acceptable experience with this type of finish, or shall construct a test panel as specified and approved by the Engineer.)
There are no further changes to the subject solicitation.
This amendment DOES NOT alter the date and time set for receipt of proposals.