09-0002_Rager H20 Specs.pdf

PDF 1 MB Posted

Attached to
Rager Ranger Station Water System Improvements
Solicitation number
AG-04GG-S-09-0002
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
09-0002_Amended 01570.pdf PDF
sf24_Bid Bond.pdf PDF
09-0002_Rager H20_RFP.doc DOC document
Sf25_Performance Bond.pdf PDF
09-0002_Rager H20 Drawings.pdf PDF
Sf25a_Payment Bond.pdf PDF
09-0002_Rager H20_DBA.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DOCUMENTS

FOR

UNITED STATES FOREST SERVICE

OCHOCO NATIONAL FOREST, USFS REGION 6

RAGER RANGER STATION

WATER SYSTEM IMPROVEMENTS, PHASE 1

USFS Contract No.: AG-05K3-D-07-0021

June 2008

Prepared by

Thomas/Wright, Inc.

7190 SW Fir Loop

Tigard, Oregon 97223

(503) 624-1468

CONTRACT DOCUMENTS

FOR

UNITED STATES FOREST SERVICE

OCHOCO NATIONAL FOREST, USFS REGION 6

RAGER RANGER STATION

WATER SYSTEM IMPROVEMENTS, PHASE 1

USFS Contract No.:

AG-05K3-D-07-0021

June 2008

Prepared by

Thomas/Wright, Inc.

7190 SW Fir Loop

Tigard, Oregon 97223

(503) 624-1468

TABLE OF CONTENTS

US FOREST SERVICE

OCHOCO NATIONAL FOREST, REGION 6

RAGER RANGER STATION WATER SYSTEM IMPROVEMENTS

PHASE 1

TECHNICAL SPECIFICATIONS

SECTION TITLE

DIVISION 1 – GENERAL REQUIREMENTS

00300 BID FORMS

00301 DEFINITION OF BID ITEMS

01010 SUMMARY OF WORK

01330 SUBMITTALS

01420 REFERENCE STANDARDS

01430 CONTRACTOR QUALITY CONTROL

01570 TEMPORARY CONTROLS

01770 PROJECT CLOSEOUT

DIVISION 2 - SITEWORK

02220 ABANDON/REMOVE UTILITIES

02318 EXCAVATION AND BACKFILL FOR UTILITIES

02370 SEDIMENT AND EROSION CONTROL

02500 SURFACE RESTORATION

02660 WATER DISTRIBUTION

02661 POLYVINYL CHLORIDE PIPE

02662 HIGH DENSITY POLYETHYLENE PIPE

DIVISION 3 - CONCRETE

03300 CAST-IN-PLACE CONCRETE

DIVISION 16 – ELECTRICAL

16119 FIBERGLASS TRANSCLOSURE

16200 CONDUIT AND PULL BOXES

Rager RS Water System Improvements Ph. 1 TOC

NO. ITEM UNIT UNIT PRICE ESTIMATED

QUANTITY TOTAL PRICE

1 Mobilization/Demobilization LS All Req'd 00301

2 4-inch Water Line LF 870 02660

3 6-inch Water Line LF 1,470 02660

4 8-inch Water Line LF 1,682 02660

5 4-inch Gate Valve EA 1 02660

6 6-inch Gate Valve EA 8 02660

7 8-inch Gate Valve EA 4 02660

8 1-inch Service Connection EA 12 02660

9 1.5-inch Service Connection EA 2 02660

10 1-inch Water Service Line LF 580 02660

11 1.5-inch Water Service Line LF 115 02660

12 2-Inch Future Irrigation Connection LS All Req'd 02660

13 Frost-Free Sanitary Yard Hydrant EA 3 02660

WATER SYSTEM IMPROVEMENTS, PHASE 1

A. Bidders shall submit a Bid for each item of Work listed in the Bid Form. Items 2, 3, 4, 10, and 11 shall be PVC pipe.

B. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

C. Bid items calling for unit prices show estimated quantities of Work to be performed. These quantities are approximate only and are for bidding purposes only. Payment to the Contractor shall be made on the Work actually performed by the Contractor.

SECTION 00300 - BID FORM

U.S. FOREST SERVICE

RAGER RANGER STATION

Bid Form - PVC Pipe

Rager RS Water System Improvements Ph. 1 00300-1

BID FORM

14 Fire Hydrant EA 7 02660

15 Truck Fill LS All Req'd 02660

16 Water Tank Connection LS All Req'd 02660

17 4-Inch Conduit LF 870 16200

18 Handhole Pull Boxes EA 4 16200

19 Gravel Surface Restoration SY 120 02500

20 Asphalt Surface Restoration SY 80 02500

21 Silt Fence LF 900 02370

TOTAL BID

22 Service Water Meter EA 14 02660

23 Rock Excavation CY 140 02660

TOTAL BID WITH ADJUSTMENT

Rager RS Water System Improvements Ph. 1 00300-2

NO. ITEM UNIT UNIT PRICE ESTIMATED

QUANTITY TOTAL PRICE

1 Mobilization/Demobilization LS All Req'd 00301

2 4-inch Water Line LF 870 02660

3 6-inch Water Line LF 1,470 02660

4 8-inch Water Line LF 1,682 02660

5 4-inch Gate Valve EA 1 02660

6 6-inch Gate Valve EA 8 02660

7 8-inch Gate Valve EA 4 02660

8 1-inch Service Connection EA 12 02660

9 1.5-inch Service Connection EA 2 02660

10 1-inch Water Service Line LF 580 02660

11 1.5-inch Water Service Line LF 115 02660

12 2-Inch Future Irrigation Connection LS All Req'd 02660

13 Frost-Free Sanitary Yard Hydrant EA 3 02660

WATER SYSTEM IMPROVEMENTS, PHASE 1

A. Bidders shall submit a Bid for each item of Work listed in the Bid Form. Items 2, 3, 4, 10, and 11 shall be HDPE pipe.

B. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

C. Bid items calling for unit prices show estimated quantities of Work to be performed. These quantities are approximate only and are for bidding purposes only. Payment to the Contractor shall be made on the Work actually performed by the Contractor.

SECTION 00300 - BID FORM

U.S. FOREST SERVICE

RAGER RANGER STATION

Bid Form - HDPE Pipe

Rager RS Water System Improvements Ph. 1 00300-3

14 Fire Hydrant EA 7 02660

15 Truck Fill LS All Req'd 02660

16 Water Tank Connection LS All Req'd 02660

17 4-Inch Conduit LF 870 16200

18 Handhole Pull Boxes EA 4 16200

19 Gravel Surface Restoration SY 120 02500

20 Asphalt Surface Restoration SY 80 02500

21 Silt Fence LF 900 02370

TOTAL BID

22 Service Water Meter EA 14 02660

23 Rock Excavation CY 140 02660

TOTAL BID WITH ADJUSTMENT

Rager RS Water System Improvements Ph. 1 00300-4

SECTION 00301

DEFINITION OF BID ITEMS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The basis for measurement and payment for all work performed under this contract shall be as listed in the "Bid Form." Unless the work to be performed is specifically called out to be measured and paid for in the Bid Form, payment for such work shall be included in other applicable items of the Bid Form. There shall be no separate measurement and payment for any such work not specifically listed in the Bid Form.

B. Items listed in the Bid Form as lump sum shall be on a lump sum all required basis.

No direct measurement will be made for lump sum bid items. Bid items calling for unit prices show estimated quantities of work to be performed. These quantities, although shown with as much accuracy as possible, are approximate only and are for bidding purposes only. Payment to the Contractor shall be made on the quantity of work actually performed by the Contractor.

C. The summation of all bid items under the Bid Form shall equal all work required by the Drawings and Specifications regardless of whether individual items of work are described under bid item descriptions or not. Payment shall be made at the contract unit bid or lump sum prices listed in the Bid. The prices listed therein shall be payment in full for all labor, tools, equipment, materials, etc., which are required to construct respective bid items according to the Contract Documents, including all work and materials incidental thereto.

D. Payment for unit bid items and lump sum bid items only partially completed at the end of monthly pay periods shall be based on a percentage of work completed as determined by the Government. An example is the construction of pipelines where the unit bid price includes the excavation and backfill of the trenches, installation of pipe, trench compaction, flushing and testing, although the Contractor may have installed a certain footage of pipeline, yet has not completed the testing and/or restoration work.

The actual payment for that bid item will be reduced to reflect the actual amount of work completed.

E. Capping and abandoning of existing water lines and demolition of water fixtures not specifically called out in a pay item but shown on the drawings is incidental to the work and no separate pay item will be included for this work.

F. Providing valve keys shall be incidental to the work. Provide, at a minimum, two valve keys for each type/size of valve nut.

Rager RS Water System Improvements Ph. 1 00301 - 1

G. For pipelines the following method will be used to determine partial payment for work not complete unless determined otherwise by the Government:

Percentage of Description of Work Lineal Feet Installed

Excavation, Backfill and Compaction of Trench, and Installation of Pipe 75%

Flushing, Pressure and Leakage Testing and Disinfection of Pipeline when Required 15%

Surface Restoration other than that Covered by other Bid Items 10%

Total 100%

For valves, meters, and other similar work items, the following method will be used to determine partial payment for work not complete:

Percentage of Description of Work Each Installed

Installation of Work Item 75%

Installation of Work Item to Finished Grade and Final Restoration 25%

Total 100%

1.2 BID ITEM 1 - MOBILIZATION/DEMOBILIZATION

Measurement for payment for mobilization/ demobilization shall be on a lump sum all required basis. This item shall include all bonds required for the project. Payment shall be made at the lump sum price stated in the Bid Form for "Mobilization/ Demobilization." Eighty percent of the bid amount for mobilization/ demobilization will be after 10% of the job is complete as determined by the CO and the remaining twenty percent of the bid amount will be paid on when final clean up and all punch list items are substantially complete.

1.3 BID ITEMS 2, 3, 4, 10, 11 - WATER LINE

Measurement for payment for water lines shall be measured on a lineal foot basis, for the various sizes and types listed in the Bid Form. Lengths of pipe shall be determined by measuring along the centerline of the pipe as installed from one end to the other. This item shall include all excavation, bedding, backfill, thrust blocks, fittings, concrete encasement, water line markers, blind flanges, water bars, location

Rager RS Water System Improvements Ph. 1 00301 - 2 wire, abandoning existing water lines, disposal and haul of excess excavated material, flexible couplings and other items, except valves, installed in the line as detailed on the Drawings. There is no specified pay depth for water lines. The depth shall be as shown on the Drawings and as required in the field for proper installation. No field measurements will be made for depth. Payment shall be made at the unit price stated in the Bid Form for "___-inch Water Line" and "___-inch Water Service Line" for the various sizes and types as listed in the Bid. Temporary removal and re-installation or relocation of signs, mailboxes, etc., shall be considered incidental to the work.

1.4 BID ITEMS 5, 6, 7 - VALVES

Measurement for payment for valves shall be made on a per each basis for each valve installed of the various sizes and shall include the valve and valve box as specified herein, including excavation, bedding, backfill, fittings within three (3) feet of the valve, demolition and disposal of existing valves, valve keys, etc. Payment shall be made at the unit price stated in the Bid Form for "___-inch Valve."

1.5 BID ITEM 8, 9 – SERVICE CONNECTION

Measurement for payment shall be made on a per each basis when listed in the Bid Form and called for on the Drawings and shall include all fittings, couplings, valve box, double check valve assembly and other items required except the water meter.

Payment shall be made at the unit price stated in the Bid Form for "__-inch Service Connection."

1.6 BID ITEMS 12 – 2-INCH FUTURE IRRIGATION CONNECTION

Measurement for payment for the 2-inch future irrigation connection shall be measured on a lump sum all required basis. This item shall include all excavation, bedding, backfill, thrust blocks, fittings, pipe, valves, valve boxes, blind flanges, location wire, flexible couplings and other items, installed in the line as detailed on the Drawings. This item includes the connection to the water main at Station 15+40 of Main “A”, and all piping and materials to the termination of the irrigation stubout.

There is no specified pay depth for 2-Inch Future Irrigation Connection. The depth shall be as shown on the Drawings and as required in the field for proper installation.

No field measurements will be made for depth. Payment shall be made at the lump sum price stated in the Bid Form for "2-Inch Future Irrigation Connection".

Temporary removal and re-installation or relocation of signs, mailboxes, etc., shall be considered incidental to the work.

1.7 BID ITEM 13 - FROST-FREE SANITARY YARD HYDRANT

Measurement for payment for yard hydrants shall be made on a per each basis and shall include the yard hydrant, piping and fittings from the water main to the yard hydrant, backflow preventer, concrete pier, gravel fill, demolition and disposal of all existing yard hydrants in this phase, and all other associated fittings as shown on the Drawings. Payment shall be made at the unit price stated in the Bid Form for "Frost- Free Sanitary Yard Hydrant".

Rager RS Water System Improvements Ph. 1 00301 - 3

1.8 BID ITEM 14 – FIRE HYDRANT

Measurement and payment for fire hydrants shall be made on a per each basis as called for on the Drawings and shall include the fire hydrant, valve, valve box, excavation, bedding, thrust blocks, backfill, fittings, saddles, concrete pad, demolition and disposal of all existing fire hydrants in this phase, salvage of bronze components as specified, etc. Payment shall be made at the unit price stated in the Bid Form for "Fire Hydrant".

1.9 BID ITEM 15 – TRUCK FILL

Measurement and payment for the truck fill shall be made on a lump sum basis as called for on the Drawings and shall include all piping, valves, pressure gauges, reduced pressure backflow assembly, the fiberglass enclosure, concrete pads, bollards, welding, fire hose with quick connect assembly, signs, fittings, pipe supports and hangers, valve box, couplings, pipe wrap, corrosion protection, installation and fabrication, bracing, demolition and disposal of the existing truck fill, etc.

Measurement for this item begins at/with the connection to Main “A”. Payment shall be made at the lump sum price stated in the Bid Form for "Truck Fill".

1.10 BID ITEM 16 – WATER TANK CONNECTION

Measurement and payment for the water tank connection shall be made on a lump sum basis as called for on the Drawings and shall include all piping, valve boxes, fittings, potholing, shop drawing submittals, couplings, demolition and disposal of the existing water tank connection, etc. Measurement of this item begins at the connection to valve “V-2” and ends at the connection to the water tank outlet pipe. Payment shall be made at the lump sum price stated in the Bid Form for "Water Tank Connection".

1.11 BID ITEM 17 – 4-INCH CONDUIT

Measurement for payment for 4-inch conduit shall be measured on a lineal foot basis.

Lengths of conduit shall be determined by measuring along the centerline of the pipe as installed from one end to the other. This item shall include all excavation, bedding, backfill, fittings, conduit markers, end caps, water bars, location wire, disposal and haul of excess excavated material, couplings and other items, except handhole pull boxes, installed in the line as detailed on the Drawings. There is no specified pay depth for conduits. The depth shall be as shown on the Drawings and as required in the field for proper installation. No field measurements will be made for depth.

Payment shall be made at the unit price stated in the Bid Form for "4-inch Conduit".

Temporary removal and re-installation or relocation of signs, mailboxes, etc., shall be considered incidental to the work.

Rager RS Water System Improvements Ph. 1 00301 - 4

1.12 BID ITEM 18 – HANDHOLE PULL BOXES

Measurement and payment for handhole pull boxes shall be made on a per each basis as called for on the Drawings and shall include the water tight pull box and lid, excavation, backfill, disposal of any excess excavation, etc. Payment shall be made at the unit price stated in the Bid Form for "Handhole Pull Box".

1.13 BID ITEMS 19, 20 - GRAVEL SURFACE RESTORATION AND ASPHALT

SURFACE RESTORATION

Measurement for payment shall be made on a square yard basis for these two bid items. Area in square yards shall be computed as the length along centerline of pipe times the allowable pay width of surface restoration. Areas which may overlap, either lengthwise or widthwise, will be included only once. Double payment for overlap areas will not be made. The pay width of each type of restoration will be limited to the actual width restored or the pay limit listed in the following table, whichever is less, unless otherwise specifically shown on the Drawings or approved in writing by the Government.

Pay Width Each Side Trench Depth* Feet of Centerline (feet)

0-4 2 4-6 3 1/2 6-8 5 1/2 8-10 7 1/2 10-12 9 1/2

* Trench depth is the depth from the ground surface to the invert of the pipe.

Any gravel and asphalt restoration necessary due to the Contractor's operation, but outside the specified pay widths, shall be done at the Contractor's own expense and at no cost to the Government. The pay widths listed above shall in no way limit the width of the trench as required for safety. The above widths only define pay limits.

Payment will be made at the unit bid prices as stated in the Bid Form, for "Gravel Surface Restoration" and "Asphalt Surface Restoration." There will be no separate payment for asphalt concrete joint sealing, topsoil replacement, seeding, mulching, etc. These items shall be considered incidental to the work.

1.14 BID ITEM 21 – SILT FENCE

Measurement for payment for silt fence shall be measured on a lineal foot basis.

Lengths of silt fence shall be determined by measuring along the face of the silt fence as installed from one end to the other. This item shall include all excavation, backfill, replacement of the silt fence as necessary, inspection of the silt fence, removal of the silt fence at the completion of the project, restoration of the area of the silt fence, and other items. All other erosion control items will be considered incidental to the

Rager RS Water System Improvements Ph. 1 00301 - 5 project. Payment shall be made at the unit price stated in the Bid Form for "Silt Fence".

1.15 BID ITEM 22 – ADDITIVE ALTERNATE – SERVICE WATER METER

Measurement and payment for Service Water Meter shall be made on a per each basis as called for on the Drawings, each being one water meter, and shall include the couplings, meter box, connections, excavations and all other items to make the service water meter complete. Payment shall be made at the unit price stated in the Bid Form for "Service Water Meter".

1.16 BID ITEM 23 – OPTIONAL BID – ROCK EXCAVATION

Measurement for payment shall be made on a cubic yard basis for rock excavation.

Area in cubic yards shall be computed as the actual depth of rock from the top of the rock encountered to the depth of the bottom of the pipe to the width as measured the inside pipe diameter plus 18 inches. Over excavation or excavating wider trenches shall not be paid for as additional excavation. When rock is encountered the contractor shall notify the CO immediately. The CO will note the depth of rock, the beginning and ending station that rock is encountered, and the size of the pipe. The measurement by the CO will be the pay amount. Payment shall be made at the unit price stated in the Bid Form for “Rock Excavation”.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (NOT USED)

PART 4 - MEASUREMENT AND PAYMENT (NOT USED)

END OF SECTION

Rager RS Water System Improvements Ph. 1 00301 - 6

SECTION 01010

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY

A. Work for this project consists of installing approximately 1,682 lineal feet of 8-inch waterline, 1,470 lineal feet of 6-inch water line, 870 lineal feet of 4-inch water line and 4-inch conduit each, service lines, water meters, yard hydrants, fire hydrants, valves, and a truck fill at the Rager Ranger Station. Rock excavation may be required. Improvements for this project are Phase 1 of three phases to replace the existing water system at Rager Ranger Station.

1.2 LOCATION

A. This project is located at the Rager Ranger Station. The Ranger Station is located approximately 75 miles east of the City of Prineville in Crook County, Oregon.

1.3 GENERAL SITE CONDITIONS AND WEATHER

A. The elevation of the project area ranges from approximately 3,900 feet to 4,200 feet above mean sea level. The construction site can experience snowfall and cold temperatures, with snow possible on the ground typically from November through March. Heavy rains in the spring saturate the ground.

B. In-depth soil surveys have not been performed; however, materials in the project are excavatable, bearing primary alluvial materials. Subsurface materials could include sands, gravels, silts/clays, boulders, rock, etc. Bedrock is prevalent in the area but the Contractor is to field verify whether it will impact construction prior to bidding.

C. In-depth water table surveys have not been performed; however, if water is encountered during excavation, the Contractor shall perform adequate dewatering to keep the excavation free from water and dispose of the water without damage to property.

D. During fire season, additional restrictions may apply to the Work. Additional information regarding this restrictions can be found in Division 0 of this Contract.

1.4 USE OF PREMISES

A. General: Contractor shall have limited use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited by the Government's right to perform work or to retain other contractors on portions of Project and by the use of the residents and workers at the site.

Rager RS Water System Improvements Ph. 1 01010 - 1

B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. Road closures will not be permitted.

C. Confine storage of materials to areas as approved by the Contracting Officer.

D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all areas.

E. Preservation of Natural Features: Confine all operations to work limits of the project.

Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

1. Provide temporary barriers to protect existing trees and plants and root zones.

2. Do not remove, injure, or destroy trees or other plants without prior approval.

Consult with the Contracting Officer and remove agreed-on roots and branches that interfere with construction.

3. Do not fasten ropes, cables, or guys to existing trees.

4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

F. Existing Utilities: Notify the Contracting Officer and utility companies of proposed locations and times for excavation.

1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

2. Interruption of Existing Utility Service: Notify the Contracting Officer, 48 hours in advance of any interruption of existing utilities.

1.5 MEALS AND LODGING

A. Meals or lodging will not be available at Forest Service facilities.

1.6 CAMPING

A. With approval by the CO, two trailer sites and one small building may be used by the Contractor.

1.7 CONSTRUCTION SEQUENCE

A. There is no specified construction sequence or season for this project. The Forest Service reserves the right to establish a completion date for construction as a part of the project construction contract.

B. Depending on conditions, normal fire restrictions may apply to activities associated with this project.

Rager RS Water System Improvements Ph. 1 01010 - 2

1.8 FIELD VERIFICATION

A. Field verify all new and existing dimensions and new and existing utility locations/elevations affecting the work of this contract before ordering products.

PART 2 PRODUCTS NOT USED

PART 3 EXECUTION NOT USED

END OF SECTION

Rager RS Water System Improvements Ph. 1 01010 - 3

Rager RS Water System Improvements Ph. 1 01330-1

SUBMITTALS

SECTION 01330

1 .1 DESCRIPTION

A. The work of this section consists of submittal requirements before and during construction.

B. This section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.

1 .2 RELATED REQUIREMENTS

A. Closeout submittals - Section 01770.

1 .3 SUBMITTAL AND APPROVAL PROCEDURES

A. All submittals shall be transmitted using United States Forest Service form DSC-1(CS), dated 11/95. (A copy of the form is included at the end of this section.) No action will be taken on a submittal item unless accompanied by the transmittal form.

B. As specified in the individual sections, forward submittals to Contracting Officer at least 15 days before need for approval. Unless a different number is specified, submit one reproducible original and two copies of each shop drawing, three copies of manufacturer's catalog sheets (cut sheets), three specimens of each sample, and three copies of all other submittals requested.

1. Shop Drawings: Include the following information with each copy of shop drawings:

a. Firm or entity that prepared each submittal clearly at the top of each submittal.

Name and address of the prime Contractor

b. Project name.

c. Date.

d. Date of revisions (when applicable).

e. Professional Engineer’s Stamp and Signature where required.

f. Contractor's certification that shop drawing has been checked for compliance with contract documents.

g. Number and title of appropriate Specification Section and drawing number and detail reference as appropriate.

Rager RS Water System Improvements Ph. 1 01330-2

h. Details of fabrication, assembly and erection including connections and engagement to contiguous work.

i. Materials used and manufacturer’s information.

j. All required dimensions.

k. The term "by others" shall not be used. All work to be performed by others shall be identified by Contractor or subcontractor name, discipline, or trade.

2. Samples: Samples shall be large enough to illustrate clearly the functional characteristics.

3. Manufacturers' Catalog Sheets: Submit only pertinent pages; mark each copy of standard printed data to identify specific products proposed for use.

4. Manufacturer's Installation Instructions: When contract documents require compliance with manufacturer's printed instructions, provide one complete set of instructions for Contracting Officer and keep another complete set of instructions at the project site until substantial completion.

C. Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.

D. Approved Equals:

1. For each item proposed as an "approved equal," submit supporting data, including:

a. Drawings and samples as appropriate.

b. Comparison of the characteristics of the proposed item with that specified.

c. Changes required in other elements of the work because of the substitution.

d. Name, address, and telephone number of vendor.

e. Manufacturer's literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.

2. A request for approval constitutes a representation that Contractor:

a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

b. Will provide the same warranties for the proposed item as for the item specified.

c. Has determined that the proposed item is compatible with interfacing items.

Rager RS Water System Improvements Ph. 1 01330-3

d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

e. Waives all claims for additional expenses that may be incurred as a result of the substitution.

3. Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material.

E. Coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward submittals that are related to or affect one another as a package to facilitate coordinated review. Each transmittal shall contain only data specific to that individual submittal.

F. Submittal Identification:

1. All sets of shop drawings, manufacturer's catalog sheets, samples, and other documents submitted to the Contracting Officer must have the identification information stamped on the submittal.

2. Identification information shall be applied to the bottom right margin on each page.

Identification information on samples shall be applied to the most readily visible area on the sample or on tags attached to sample.

G. Submittal Numbering:

1. Number each submittal consecutively.

2. For re-submittals use the original submittal number, plus a letter suffix beginning with A.

3. Additional re-submittals of the same item shall contain the original number with the next consecutive letter.

H. Contracting Officer's Review:

1. Submittals will be returned disapproved without technical review if identification information is missing, not filled in, or if placed on the back of the submittal; an incorrect number or format of submittals is provided; the transmittal form is incorrectly filled out; submittals are not coordinated.

2. Any work done or orders for materials or services placed before approval shall be at the Contractor's own risk.

3. After reviewing submittals, the Contracting Officer will return one copy of form DSC-1(CS) and one copy of applicable (marked up) submittal sheets to the Contractor. Shop drawing review notations will be returned on the reproducible original shop drawing. All other submitted items will be retained. The Contractor is responsible for producing additional copies for his/her own use.

Rager RS Water System Improvements Ph. 1 01330-4

4. The returned submittal will be marked in one of three ways as defined below:

a. APPROVED: Acceptable with no corrections.

b. APPROVED WITH NOTATIONS: Minor corrections or clarifications required. All comments are clear and no further review is required. The Contractor shall address all review comments when proceeding with the work.

c. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The Contracting Officer will identify the reasons for disapproval. The Contractor shall revise and resubmit with changes clearly identified.

PART 2 PRODUCTS NOT USED.

PART 3 EXECUTION NOT USED.

END OF SECTION

TRANSMITTAL – US FOREST SERVICE

Transmittal No.:

Sheet: 1 of:

Rager Ranger Station Ph. 1

Project:

Contract No.:

Pkg. No.:

Date:

Contractor:

Subcontractor/Supplier:

USFS ACTION

Specification Section No.

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

Contractor Signature

Recommended by

Title, Date

Title

Date

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Review Comments

Action By

Date

Contracting Officer’s Representative

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.

SUBMITTAL LOG DATES: From contractor [__________], To reviewer [__________], From reviewer [__________], To Contractor [__________] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim DSC-1(CS) Rev. 11/95

TRANSMITTAL CONTINUATION – US FOREST SERVICE Transmittal No.:

Sheet: 1 of:

Rager Ranger Station Ph. 1

Project:

Contract No.:

Pkg. No.:

Date:

Contractor:

Subcontractor/Supplier:

USFS ACTION

Specification Section No.

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

Review Comments

DSC-1(CS)b Rev. 11/95

Rager RS Water System Improvements Ph. 1 01420-1

REFERENCE STANDARDS

SECTION 01420

1 .1 The following abbreviations, which may be used in the construction specifications, refer to the organizations and specifications of the organizations listed below:

AASHTO American Association of State Highway and Transportation Officials 444 North Capitol Street, NW, Suite 249 Washington, D.C. 20001

ACI American Concrete Institute P.O. Box 9094 Farmington Hills, Michigan 48333-9094

ANSI American National Standards Institute 11 West 42nd Street, 13th Floor New York, New York 10036

APWA American Public Works Association 106 West 11th Street, Suite 1800 Kansas City, Missouri 64105-1806

ASLA American Society of Landscape Architects 4401 Connecticut Avenue, NW Fifth Floor Washington, D.C. 20008-2369

ASTM American Society for Testing and Materials 100 Barr Harbor Drive West Conshohocken, Pennsylvania 19428-2959

AWWA American Water Works Association 6666 W. Quincy Avenue Denver, Colorado 80235

EPA Environmental Protection Agency 401 M Street, SW Washington, D.C. 20460

NACE National Association of Corrosion Engineers 1440 South Creek Drive P.O. Box 218340 Houston, Texas 77218-8340

NAPCA National Association of Pipe Coating Applicators 8th Floor, Commercial National Bank Building 333 Texas Street, Suite 800 Shreveport, Louisiana 71101-3673

Rager RS Water System Improvements Ph. 1 01420-2

NIOSH National Institute for Occupational Safety and Health NIOSH Building 1, Room 3007 1600 Clifton Road, NE Atlanta, Georgia 30333

NIST National Institute of Standards and Technology (US Department of Commerce) Building 101, #A1134 Route I-270 and Quince Orchard Road Gaithersburg, Maryland 20899

Send requests for publications to:

Superintendent of Documents Government Printing Office Washington, D.C. 20402

ODOT Oregon Department of Transportation 355 Capital Street NE Salem, Oregon 97301

OSHA Occupational Safety and Health Administration U.S. Department of Labor 200 Constitution Avenue, NW Washington, D.C. 20210

PCA Portland Cement Association 5420 Old Orchard Road Skokie, Illinois 60077-1083

UL Underwriters Laboratories, Inc.

333 Pfingsten Road Northbrook, Illinois 60062

USDA U.S. Department of Agriculture 14th Street and Independence Avenue, SW Washington, D.C. 20250

USFS U.S. Forest Service Ochoco National Forest 3160 NE 3rd Street Prineville, Oregon 97754

PART 2 PRODUCTS

2.1 Required Documents

A. The Contractor shall have at the work site, at all times, entire copies or related sections as referenced in individual specification sections the following documents. These documents shall be such that they can be reviewed by the Contracting Officer or his/her representatives during construction to ensure compliance with the Contract:

1. 2002 Oregon Standard Specifications for Construction, published by ODOT.

Rager RS Water System Improvements Ph. 1 01420-3

2. American Society for Testing Materials Standards, published by ASTM

3. American Water Works Association Standards, published by AWWA.

PART 3 EXECUTION NOT USED.

Rager RS Water System Improvements Ph. 1 01430-1

CONTRACTOR QUALITY CONTROL

SECTION 01430

1 .1 DESCRIPTION

A. The work of this section consists of preparing and executing a quality control program.

B. Testing for this project shall include disinfection testing and all pipe leakage testing.

1 .2 SUBMITTALS

A. As specified in section 01330.

B. Quality Control Plan:

1. At the time of the preconstruction conference, submit for approval a written Contractor Quality Control (CQC) plan.

2. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.

3. The Government reserves the right to require changes in the plan during the contract period as necessary to obtain the quality specified.

4. No change in the approved plan may be made without written concurrence by the Contracting Officer.

5. The plan shall include:

a. A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.

b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.

c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

d. Methods of performing, documenting, and enforcing quality control of all work.

e. Methods of monitoring and controlling environmental pollution and contamination as required by regulations and laws.

C. Contractor's Quality Control Daily Reports: Submit showing all inspections and tests on the first workday following the date covered by the report.

D. Test Reports:

Rager RS Water System Improvements Ph. 1 01430-2

1. Submit Test Information Sheets with Quality Control Daily Reports when Testing has been done.

2. Submit failing test results and proposed remedial actions within two days of noted deficiency.

3. Submit three copies of complete test results not later than three calendar days after the test was performed.

E. Off-Site Inspection Reports: Submit prior to shipment.

F. If the CQC plan and Quality Control Daily Reports are not submitted as specified, the Contracting Officer may retain all payments until such time a plan is approved and implemented.

1 .3 QUALITY ASSURANCE

A. General:

1. The quality of all work shall be the responsibility of the Contractor. Testing shall be the responsibility of an independent testing laboratory

2. Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.

3. Quality Control Daily Reports shall be completed by the Quality Control Supervisor.

4. Test reports shall be completed by person performing the test.

5. The Contracting Officer may designate locations of tests.

B. Quality Control Staff:

1. The Contractor's Quality Control Supervisor may also perform the duties of Project Superintendent.

C. Testing Laboratory and Equipment:

1. Employ certified independent laboratories to perform sampling and testing. The testing laboratory organization shall be certified for the type of testing work to be done.

2. All measuring devices, laboratory equipment, and instruments shall be calibrated at established intervals against certified standards in accordance with National Bureau of Standards requirements. Upon request, measuring and testing devices shall be made available for use by the Government for verification tests.

Rager RS Water System Improvements Ph. 1 01430-3

PART 3 EXECUTION

3 .1 OFF-SITE CONTROL

A. Items that are fabricated or assembled off-site shall be inspected for quality control at the place of fabrication.

3 .2 ON-SITE CONTROL

A. Notification:

1. Notify the Contracting Officer at least 48 hours in advance of the preparatory phase meeting.

2. Notify the Contracting Officer at least 24 hours in advance of the initial and follow-up phases.

B. Preparatory Phase: Perform before beginning each feature of work.

1. Review control submittal requirements with personnel directly responsible for the quality control work. As a minimum, the Contractor's Quality Control Supervisor and the foreman responsible for the feature of work shall be in attendance.

2. Review all applicable specifications sections and drawings related to the feature of work.

3. Ensure that copies of all referenced standards related to sampling, testing, and execution for the feature of work are available on site.

4. Ensure that provisions have been made for field control testing.

5. Examine the work area to ensure that all preliminary work has been completed.

6. Verify all field dimensions and advise the Contracting Officer of discrepancies with contract documents.

7. Ensure that necessary equipment and materials are at the project site and that they comply with approved shop drawings and submittals.

8. Prepare a report on all preparatory phase activities and discussions. Attach report to Contractor's Quality Control Daily Report.

C. Initial Phase:

1. As soon as work begins, inspect and test a representative portion of a particular feature of work for quality of workmanship.

2. Review control testing procedures to ensure compliance with contract requirements.

Rager RS Water System Improvements Ph. 1 01430-4

3. Prepare a report on all initial phase activities and discussions. Attach report to Contractor's Quality Control Daily Report. Exact location of initial phase shall be indicated for future reference and comparison with follow-up phases.

D. Follow-Up Phase: Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.

E. Additional Preparatory and Initial Phases: Additional preparatory and initial phases may be required on the same feature of work for the following reasons:

1. Quality of on-going work is unacceptable.

2. Changes occur in the applicable quality control staff, on-site production supervision, or work crew.

3. Work on a particular feature of work is resumed after a substantial period of inactivity.

3 .3 DOCUMENTATION

A. Maintain Quality Control Daily Reports and Daily Test Report Information Sheets (samples attached) of quality control activities and tests.

B. Quality Control Daily Reports may not be substituted for other written reports required under clauses of the contract, such as Disputes, Differing Site Conditions, or Changes.

3 .4 ENFORCEMENT

A. The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the Contracting Officer.

CONTRACTOR'S QUALITY CONTROL DAILY REPORT

REPORT NO. _________ SHEET 1 OF _________

PROJECT

CONTRACT NO.

DATE

PARK

CONTRACTOR'S REPRESENTATIVE ON THE JOB

WEATHER (Rain, Snow, Cloudy, Windy, etc.)

RAINFALL

Inches

TEMPERATURE GROUND CONDITIONS (Dry, Damp, Wet, Frozen, etc.)

MAX.

MIN.

1. PRIME CONTRACTOR

NO. EMPLOYEES BY JOB CATEGORIES Hours HEAVY EQUIPMENT ON

JOB

NO.

UNITS

HRS. WORKING

YES NO Comments

WORK PERFORMED BY PRIME CONTRACTOR:

MATERIALS DELIVERED OFFICIAL VISITORS TO SITE

2A. SUBCONTRACTOR, _____________________________________________: (If more than one subcontractor use copies of following page.)

NO. EMPLOYEES BY JOB CATEGORIES Hours HEAVY EQUIPMENT ON

JOB

NO.

UNITS

WORK PERFORMED BY SUBCONTRACTOR:

3. SPECIFIC INSPECTIONS: (Inspections performed, results, and corrective actions)

4. TESTING: 1 Check if any testing was performed today. (Complete and attach Test Report Information Sheets.)

Type and Location of Testing: ____________________________________________________________________________________

5. VERBAL INSTRUCTION RECEIVED FROM GOVERNMENT ON CONSTRUCTION DEFICIENCIES OR RE-TESTING

REQUIRED:

6. REMARKS:

7. CERTIFICATION:

I certify that the above report is complete and correct and that I, or my authorized representative, have inspected all work performed this day by the prime contractor and each subcontractor and determined that all materials, equipment, and workmanship are in strict compliance with the plans and specifications except as may be noted above. ____________________________________________________________ Contractor's Quality Control Representative

Rager RS Water System Improvements Ph. 1 01430-5

Rager RS Water System Improvements Ph. 1 01430-6

SUBCONTRACTOR WORK CONTINUED:

CONTRACT NO. REPORT NO. _______

SHEET ____ OF ____

2 SUBCONTRACTOR,

NO. EMPLOYEES BY JOB CATEGORIES Hours HEAVY EQUIPMENT ON

JOB

NO.

UNITS

2 SUBCONTRACTOR,

JOB

NO.

UNITS

JOB

NO.

UNITS

JOB

NO.

UNITS

YES NO COMMENTS

Rager RS Water System Improvements Ph. 1 01430-7

DAILY TEST REPORT INFORMATION SHEET

CONTRACT NO. REPORT NO. _____________

SHEET _____ OF _________

1. Individual Making Inspection or Test:

2. Testing Laboratory; Name: Phone #:

Address:

3. Description of Work and Test Method:

4. Location of Samples and Tests or Inspections:

5. Specification Section:

6. Inspection or Test Data:

7. Test Results and Interpretations of Test Results:

8. Comments or Professional Opinion About Compliance of Inspected Work or Tested Work with contract Document Requirements:

9. Recommendations:

10. Corrective Actions Taken:

CERTIFICATION:

I certify that the above testing report is complete and correct and that all testing performed this day for this contract is in strict compliance with the plans and specifications except as noted above.

Signature of Inspector

Rager RS Water System Improvements Ph. 1 01570-1

TEMPORARY CONTROLS

SECTION 01570

A. The work of this section consists of providing temporary controls.

B. The Contractor shall coordinate all work with the requirements in the National Environmental Policy Act (NEPA) documents for this site in addition to the requirements listed in these specifications and shown on the drawings. Refer to Division 0 of this contract for additional information.

1 .2 SUBMITTALS

A. As specified in Section 01330.

PART 3 EXECUTION

3 .1 HOUSEKEEPING

A. Keep project neat, orderly, and in a safe condition at all times.

B. Wet down or cover stockpiles and dry materials with tarps to prevent blowing dust.

Covers shall be adequately anchored for all wind conditions.

C. Do not store rubbish or volatile waste on-site. Dispose of all waste materials as specified or according to State requirements.

D. Utilize excavated material as soon as possible.

3 .2 DISPOSAL

A. Stockpile excess excavated material (including rocks and boulders) that cannot be used in construction at staging area shown on the drawings.

B. The disposal area for excess excavated material will be at the Powell Pit. This is also a material source for the project for crushed rock. The Powell Pit is located 2.5 miles from Rager Ranger Station on FS Road 5820.

C. Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of off Government property. The Contractor shall dispose of all vegetative waste approved by the Contracting Officer at the site designated on the drawings.

Rager RS Water System Improvements Ph. 1 01570-2

D. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the Forest Service property. Do not burn or bury refuse.

3 .3 AIR AND WATER POLLUTION CONTROL

A. Provide and install all erosion control fencing and other measures as shown on the drawings.

B. All chlorinated water shall be dechlorinated and other contaminants removed prior to discharging to any storm drainage or natural waterways. All discharges of water from this project shall be approved by the Contracting Officer.

C. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.

D. Do not dispose of volatile wastes or oils in storm or sanitary drains.

E. Do not allow waste materials to be washed into streams or bodies of water.

Rager RS Water System Improvements Ph. 1 01770-1

PROJECT CLOSEOUT

SECTION 01770

A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.

2 .1 CLEANING MATERIALS

A. As recommended by the manufacturer of surface to be cleaned.

3 .1 CLEANING

A. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Pick up all construction debris from the site.

B. All rented trailer sites shall be restored to the condition found at the beginning of the project.

3 .2 PROJECT RECORD DRAWINGS

A. Maintain one complete full-size set of contract drawings and one full-size set of vendor-supplied drawings. Clearly mark changes, deletions, and additions, to show actual construction conditions. Show additions in red, deletions in green, and special instructions in blue. Final locations of all water lines shall be identified by dimensions from permanent structures (building corners, signs, etc.).

B. Keep record drawings current. Make record drawings available to the Contracting Officer for inspection at any time and at invoices. If project record drawings are not current, the Contracting Officer may retain an appropriate amount of the progress payment.

C. On completion of the total project, submit record drawings in AutoCAD format and marked up record drawings. Electronic AutoCAD drawings shall be submitted on a CD.

Include all shop drawings, sketches, and additional drawings that are to be included in the final set, with clear instructions showing the location of these drawings.

Rager RS Water System Improvements Ph. 1 01770-2

3 .3 CLOSEOUT SUBMITTALS

A. Submit before final inspection request.

1. Project Record Drawings: As specified above.

2. Guarantees and Bonds: As specified in individual sections.

3. Spare Parts and Materials: As specified in individual sections.

3 .4 SUBSTANTIAL COMPLETION AND FINAL INSPECTION

A. Submit written certification that project, or designated portion of project, is substantially complete, and request in writing a final inspection. Contracting Officer will make an inspection within 10 days of receipt of request. Certification shall include a listing of significant items that are not complete in accordance with the contract and shall indicate the schedule date for the completion of these items. Upon receipt of written certification project is substantially complete, the Contracting Officer will proceed with inspection within 10 days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.

B. If, following final inspection, the work is determined to be substantially complete, Contracting Officer will prepare a list of deficiencies to be corrected before final acceptance and issue a Letter of Substantial Completion. Contractor shall complete the work described on the list of deficiencies within 30 calendar days, as weather permits. If the Contractor fails to complete the work within this time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for reinspection costs.

C. If, following final inspection, the work is not determined to be substantially complete, Contracting Officer will notify Contractor in writing. After completing work, Contractor shall resubmit certification and request a new final inspection. All reinspection costs may be charged in accordance with the Inspection of Construction clause of the contract.

3 .5 ACCEPTANCE OF THE WORK

A. After all deficiencies have been corrected, a Letter of Acceptance will be issued.

Rager RS Water System Improvements Ph. 1 02220-1

ABANDON/REMOVE UTILITY

SECTION 02220

1 .1 DESCRIPTION

A. The…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .