09-0002_Amended 01570.pdf
PDF 52 KB Posted
- Attached to
- Rager Ranger Station Water System Improvements
- Solicitation number
- AG-04GG-S-09-0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 09-0002_Rager H20 Specs.pdf | ||
| sf24_Bid Bond.pdf | ||
| 09-0002_Rager H20_RFP.doc | DOC document | |
| Sf25_Performance Bond.pdf | ||
| 09-0002_Rager H20 Drawings.pdf | ||
| Sf25a_Payment Bond.pdf | ||
| 09-0002_Rager H20_DBA.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rager RS Water System Improvements Ph. 1 01570-1
TEMPORARY CONTROLS
SECTION 01570
PART 1 GENERAL
1 .1 DESCRIPTION
A. The work of this section consists of providing temporary controls.
B. The Contractor shall coordinate all work with the requirements in the National Environmental Policy Act (NEPA) documents for this site in addition to the requirements listed in these specifications and shown on the drawings. Refer to Division 0 of this contract for additional information.
1 .2 SUBMITTALS
A. As specified in Section 01330.
PART 2 PRODUCTS NOT USED.
PART 3 EXECUTION
3 .1 HOUSEKEEPING
A. Keep project neat, orderly, and in a safe condition at all times.
B. Wet down or cover stockpiles and dry materials with tarps to prevent blowing dust.
Covers shall be adequately anchored for all wind conditions.
C. Do not store rubbish or volatile waste on-site. Dispose of all waste materials as specified or according to State requirements.
D. Utilize excavated material as soon as possible.
3 .2 DISPOSAL
A. The disposal area for excess excavated material will be at Powell Pit. Haul excess excavated material (including rocks and boulders) that can not be used in construction to the disposal area. Place and shape disposal material as outlined in the Material Source Development Plan that will be provided upon contract award. The Powell Pit is located
2.5 miles from Rager Ranger Station on FS Road 5820.
B. Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of off Government property. The Contractor shall dispose of all vegetative waste approved by the Contracting Officer at the site designated on the drawings.
Rager RS Water System Improvements Ph. 1 01570-2
C. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers provided by the Contractor at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the Forest Service property. Do not burn or bury refuse.
3 .3 AIR AND WATER POLLUTION CONTROL
A. Provide and install all erosion control fencing and other measures as shown on the drawings.
B. All chlorinated water shall be dechlorinated prior to discharging to any natural waterways. Chlorinated water may be discharged to prior approved locations without dechlorination upon COR approval. All discharges of water from this project shall be approved by the COR.
C. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.
D. Do not dispose of volatile wastes or oils in storm or sanitary drains.
E. Do not allow waste materials to be washed into streams or bodies of water.
END OF SECTION