ConstructionDrawingsMyersRATStewREV2Plan Set.pdf
PDF 6 MB Posted
- Attached to
- RECOVERY MEYERS RAT STEWARDSHIP, ROGUE RIVER-SISKIYOU NATIONAL FOREST, JOSEPHINE COUNTY, OREGON
- Solicitation number
- AG-0489-S-10-9001
About this file
Specified Road Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment No 01SF30.doc | DOC document | |
| Myers_Rat_Vicinity Map.pdf | ||
| Myers_Rat_Contract Map_02_03_10.pdf | ||
| RoadReconstructionScheduleofItems.doc | DOC document | |
| SiteVisitforProspectiveContractors.doc | DOC document | |
| Amendment01.doc | DOC document | |
| RestrictedRoadListRev2.doc | DOC document | |
| AG0489S109001MyersRatStewardship.docx | DOCX document | |
| AppdendixBsol0489s109001.doc | DOC document | |
| DavisBaconWageRatesOR080002sol0480s109001.doc | DOC document | |
| AppendixCsol0489s109001.doc | DOC document | |
| WD77solAG0489S109001.doc | DOC document | |
| Revised04_16_10 Maps.zip | ZIP file | |
| Appendix Dsol0489s109001.doc | DOC document | |
| AppendixAsol0489s109001.doc | DOC document | |
| ContractAreaMap.jpg | JPG image |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F S
R
M
P
.3
F S
R
M
P
0.
F S
R
M
P
0.
F S
R
M
P
1.
F S
R
M
P
2.
F S
R
M
P
2.
F S
R
M
P
3.
Pay Item Number Pay Item Description
Pay Item Unit
Bid Total
15101 Mobilization, All Sites LPSM ALL
15713 Soil erosion and pollution control LPSM ALL
20351 Removal of culvert Each 1 1
20352 Removal of culvert, disposal method (a) Each 1 1
10ft to be removed, remaining pipe to use 2 sack slurry
Site Quantities Notes Includes washing equipment, fire equipment, and service truck.
To be removed from USFS lands legally.
20303 Removal of AC, disposal method (a) CUYD, CQ 47 27 17 25 11 30 27 184
26201 Geogrid, Category 3 SQYD, CQ 1254 757 552 894 347 440 950 5194
26202 Select granular backfill CUYD, CQ 491 293 191 408 122 403 361 2269
26203 Unsuitable Excavation CUYD, CQ 699 433 302 539 180 581 521 3255
32401 Agg Base, grading C, compaction method C CUYD, CQ 225 153 111 136 58 178 168 1029
40401 Minor hot asphalt concrete Ton, CQ 93 55 39 44 23 61 57 372
60263 24" aluminized steel, type 2,corrugated steel pipe, 12 gage Foot 50 50 100
60601 Spillway assembly, 24" Each 1 1 2
60603 Pipe anchor assembly, 24" Each 4 4 8
To be removed from USFS lands legally.
Shall be biaxial geogrid material
Rock source shall be weed and POC inspected and approved prior to material entering USFS lands.
Conversion Estimated at 2.05 tons/cuyd
Rock source shall be weed and POC inspected and approved prior to material entering USFS lands.
Waste area located at MP 10.13, Jct with 087 Rd.
63501 Temporary Traffic Control, All Sites LPSM ALL
CQ= Contract Quantity
Project Drawing Sheet
Drawn: Scott Blower
Date
Checked: Mike Cody
ROGUE RIVER-SISKIYOU
NATIONAL FOREST
Wild Rivers Ranger District
Design: Scott Blower
12/3/2009
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R6
PACIFIC NORTHWEST REGION
SUMMARY OF QUANTITIES
MYERS RAT STEWARDSHIP
Date 12/3/2009 PACIFIC NORTHWEST REGION
File details come from the government source that posted it. Updated .