SPECIFICATION LISTING
IDITAROD NATIONAL HISTORIC TRAIL – PTARMIGAN CREEK ACCESS,
PTARMIGAN CREEK TOVAGT LAKE, VICTOR CREEK ACCESS, & SNOW RIVER
TO VICTOR CREEK ACCESS
CHUGACH NATIONAL FOREST
SPECIFICATION NUMBER SPECIFICATION TITLE
EM-7720-103 (September 1996) “STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MAINTENANCE OF TRAILS” is incorporated by reference. The requirements contained in these Standard Specifications are hereby made part of this solicitation and any resulting contract.
Note: This document is out of print from the Government Printing Office. It can be obtained electronically from: http://www.fs.fed.us/r1/helena/contracting/96_Trail_Specs_English.pdf
THE FOLLOWING SPECIAL PROJECT SPECIFICATIONS APPLY TO THIS CONTRACT [included in full text herefollowing]:
260 ..................................................... Geocell Abutment Stabilization 726 ..................................................... Geocell 901 ..................................................... Abbreviations, Acronyms and Terms (February 2006) 905 ..................................................... Control of Materials (August 2006) 906 ..................................................... Measurement and Payment (February 2006) 908 ..................................................... Staking, Flagging, and Cleanup (February 2007) 913 ..................................................... Turnpike (February 2005) 921…..................................................Culverts 931 ..................................................... Log Stringer Bridge (January 2007) 941…………………………………..Aggregate Surfacing & Base Course 954…..................................................Obliteration of Abandoned Trailways 956 ..................................................... Water Pollution Prevention (February 2006) 961......................................................Rock, Grid Pavement Units, & Aggregate 962 ..................................................... Material for Timber Structures (February 2007) http://www.fs.fed.us/r1/helena/contracting/96_Trail_Specs_English.pdf�
Section 260 - Geocell Abutment Stabilization
Description
260.01 Work. Construct geocell abutment stabilization at each abutment using Presto Geoweb Cellular Confinement System, Webtec TerraCell, or approved equal in accordance with the plans and manufacturers recommendations.
Materials
260.02 Requirements. Ensure that material conforms to specifications in the following subsections:
Coarse Granular Backfill 703.03 Geocell 726 Geotextile, Type IV (A,B,C.D,E, or F) 714.01
Construction
260.03 General. Perform the work specified in Section 206. Use ditches, grading or similar methods to prevent surface runoff that may occur during inclement weather from ponding in the foundation excavation.
260.04 Geotextile Installation. Place the geotextile according to Section 221 or AS SHOWN ON THE DRAWINGS. Ensure that the surface upon which the geotextile is to be placed is uniform and is reasonably smooth and free of obstructions, depressions, and debris that could damage the geotextile .
Have the surface approved by the CO prior to placing geotextile.
Lay the geotextile without tension, stress, wrinkles or creases. Sew or overlap adjacent strips a minimum of 12” at joints. Insert securing pins through both strips of overlapped geotextile at minimum intervals of 3 feet, but no closer than 2 inches to each edge, to prevent the geotextile from being displaced.
Have the installed geotextile approved by the CO prior to setting the geocells.
260.05 Geocell Installation. Place the geocell sections directly on the prepared subgrade. Expand the geocell sections into position at the grades and lines AS SHOWN ON THE DRAWINGS. Hold the expanded geocell sections with suitable “stretcher frames”, steel stakes driven inside selected outer cell walls, or other similar methods as allowed by the geocell manufacturer prior to filling. Ensure that the individual cells have been expanded to the minimum dimensions required by the manufacturer. If necessary field cut sections as per the manufacturer’s recommendations to the lines SHOWN ON THE
PLANS.
Connect geocell panels in accordance with the manufacturer’s recommendations.
260.06 Infill Placement. Furnish the CO with the manufacturer’s specific recommendations for backfilling prior to placement of the geocells.
Place coarse granular backfill meeting subsection 703.03 into the expanded cells with equipment appropriate for the site conditions such as a backhoe or a front-end loader. Do not drop infill material more than 3 feet to avoid damage or displacement of the cell walls.
Overfill the geocell cells and level to a minimum of 2 inches above the top of the cell walls. A front-end loader may be used to place the infill provided that it only traffics above geocell sections that have been filled and covered with the minimum 2 inches of additional material. Compact the infill material with a vibratory plate compacter. Operate compaction equipment over the full width of the geocell until visible deformation of the infill ceases. Make at least three complete passes. Grade the surface to be ½ inch above the top of the cells . Ensure that the cell walls are not exposed after fine grading is completed.
Use the geocell manufacturer’s specific recommendations for backfilling if they are more stringent than stated above.
Measurement
260.07 Method. Use the method of measurement that is DESIGNATED IN THE SCHEDULE OF
ITEMS.
Payment will be based on the contract unit price of geocell material placed and accepted. This will be exclusive of wastage and material placed outside the neat lines SHOWN ON THE PLANS.
Payment
260.08 Basis. The accepted quantities will be paid for at the contract unit price for the PAY ITEM
DESIGNATED IN THE SCHEDULE OF ITEMS.
The cost for furnishing and placing the Coarse Granular Backfill required for geocell infill is incidental to this pay item and no separate payment will be made.
The cost for furnishing and placing geotextile for the geocell installation is incidental to this pay item and no separate payment will be made.
Payment will be made under:
Pay Item Pay Unit
260 (01) Geocell abutment stabilization, __inch depth Square Yard
Section 726 - Geocell
Furnish geocell panels consisting of sheet strips fabricated from high-density polyethylene (H.D.P.E.).
which are connected in series at off-set, full-depth ultrasonic seams, aligned perpendicular to the longitudinal axis of the strips. When expanded, the interconnected strips form the walls of a flexible, three-dimensional cellular confinement structure into which the specified infill materials can be placed.
Ensure that the polyethylene material used to fabricate the geocell sections is treated to resist ultraviolet degradation and that it conforms to the following:
(a) Density ………………………… 0.935-0.965 g/cm3 per ASTM D1505
(b) Environmental Stress
Crack Resistance (ESCR) ……… 2000 hour per ASTM D1693
Use strips with a sheet thickness, of 1.27 mm -5% +10% (50 mil -5% +10%) tested per ASTM D5199.
Thickness shall be determined in the flat, before any surface texturing or other surface disruption.
Ensure that cell seam strength is uniform over the full depth of the cell. Test short-term peel strength per U.S. Army Corps of Engineers Technical Report GL-86-19, Appendix A. Provide a minimum seam peel strength of 2000 N (450 lb) for the 203 mm (8.0 in) depth cell.
Test seam hang-strength for a period of 30 days minimum at room temperature. Room temperature is defined in ASTM E41. Use test samples made by welding two 102 mm (4 in) wide polyethylene strips together. Ensure that a test sample consisting of two carbon black stabilized strips supports a 72.5 kg (160
lb) load for the test period and that a test sample consisting of carbon black stabilized strip and a HALS stabilized strip supports a 63.5 kg (140 lb) load for the test period.
Furnish the CO with a certificate signed by a legally authorized official from the company that manufactured the geocell. Ensure that the certificate attests that the geocell meets the chemical, physical, material and manufacturing requirements stated in the specification. When requested by the CO, furnish a sample of the geocell from each lot for verification testing.
During shipment and storage, wrap the geocell in heavy-duty protective covering. Protect the geocell from mud, soil, dust, debris and sunlight prior to installation.
Section 901 – Abbreviations, Acronyms, and Terms
901.01 Terms, Organizations, and Standards
(b) Abbreviations and Acronyms. Add the following:
CP control point C.Y. cubic yard FT foot LB pound L.F. linear foot MI miles RP reference point SS slope stake S.Y. square yard “ inches ‘ foot
(c) SI slope notation (vertical:horizontal). Delete this entire subsection and substitute the following:
(c) Slope notation. Express all slopes as the ratio of a number of units horizontal to one unit vertical.
Section 905 – Control of Materials
905.02 Material Sources Add the following to the end of this subsection:
(c) Native Materials. Sources of native materials such as cushion material, mineral soil, suitable material, and logs are available on the project. If native materials are unavailable at construction site(s), materials shall be imported from within the construction limits or other approved areas for a horizontal distance of up to 300’.
Section 906 – Measurement and Payment
906.02 Determination of Quantities. Add the following to the second paragraph:
Do not include overlap when measuring quantity for payment of geotextiles.
906.03 Units of Measurement. Delete the first two sentences of this subsection and substitute the following:
Payments will be made by units defined and determined according to Standard English measure and by the following:
(a) Cubic Yard. A measurement computed by one of the following methods:
906.03 Units of Measurement. Add the following text to the end of this subsection:
Standard Specifications for Construction and Maintenance of Trails (EM-7720-103) are based on modern metric units of measurement. The dimensions and units of measure SHOWN ON THE DRAWINGS and used to develop SPECIAL PROJECT SPECIFICATIONS for this contract, utilize U.S. Standard English units of measure. All measurements, material requirements, and other International System of Units referenced in the EM-7720-103 shall be converted to U.S. Standard English units of measure. SI (Metric) to English Conversion Factors is included in the EM-7720-103 to assist with any required conversions.
Work required by the contract will be paid based on the PAY UNIT (U.S. Standard English measure) as
DESIGNATED IN THE SCHEDULE OF ITEMS.
Under each Specification Section with PAY ITEMS of work DESIGNATED IN THE SCHEDULE OF ITEMS for measurement and payment under this contract, the last subsection “Payment - Basis” shall have the following format:
PAY ITEM – Numbering system and work description to remain the same unless modified by Special Project Specification.
PAY UNIT – These units DESIGNATED IN THE SCHEDULE OF ITEMS have been changed from metric to corresponding unit of U.S. Standard English measure.
Section 908 – Staking, Flagging, and Cleanup
Delete this section and substitute the following:
908.01 Work. The work consists of establishing any control points needed in addition to existing staking, reestablishing and staking centerline, and removing and disposing of all construction stakes, tags, flagging, and plastic ribbon from the project area.
Furnish all labor, equipment, materials, transportation and other incidentals necessary to complete the work in accordance with these specifications and acceptable engineering practice.
Materials
908.02 Stakes. Provide wooden stakes that have approximate dimensions of 1.5” x 0.5” x 24”. Other dimensions and materials may be used if approved in writing by the CO. Ensure stakes are of sufficient length to provide a solid set in the ground and space for marking above ground when applicable. Paint the top 2” of all stakes or mark with orange plastic flagging.
908.03 Supporting Services and Documents. The Government will set initial construction stakes, or flagging and control points, and furnish the contractor drawings, control point tables, and where applicable survey data as needed for the contractor to stake the centerline. Return all survey data to the
CO.
908.04 Location Survey Line. A location line for this project has been established on the ground.
Furnish and maintain all additional stakes, flagging, templates, batter boards, and other materials and supplies necessary for marking and maintaining points and lines established. Do not perform work in the absence of control points.
Construction
Set centerline stakes at a maximum interval of 100’. Use survey methods that will insure precision of 1/100. In areas of trail restoration the existing trail alignment will constitute the design location. Offset stakes in restoration segments to the uphill side of the trail as needed. In all other areas control points, existing stakes, flagging, and survey data shall be used to reestablish the design location line. These stakes and flagging constitute the field control.
Remove all construction stakes, tags, flagging, and plastic ribbon from the project area within 10 days after final inspection of all other work on the project. Dispose of all stakes, tags, flagging, and plastic ribbon off Government administered land unless otherwise designated.
Section 908 – Staking, Flagging, and Cleanup (continued)
908.05 Marking Stakes. Mark all stakes with a stake pencil that leaves an imprint, or with waterproof ink, in a format approved by the CO. Display the centerline station on the stake facing back toward the project beginning, or trail centerline if stakes are offset.
908.06 Approval & Maintenance. Do not begin construction work within a trail segment until the stakes and marks established are approved in writing by the CO. The CO shall begin audits on completed centerline staking segments within three business days following formal request from the Contractor. The minimum segment for approval shall be 1 mile or the length of the project, whichever is less.
Approval of centerline staking shall not relieve the Contractor of responsibility for maintaining the survey work until construction has been completed and accepted, and for correcting errors made by the contractor.
Measurement
908.07 Method. Determine the quantity of centerline staking by measuring the slope distance along the trail centerline.
Payment
908.08 Basis. Make payment, for all units inspected and accepted, at the unit price SHOWN IN THE
SCHEDULE OF ITEMS.
Make payment under:
PAY ITEM PAYUNIT
908(01) Centerline Staking ……………………………………………... L.F.
Section 913 – Turnpike
913.07 Drainage. Delete the text of this subsection and replace with the following:
Construct side ditches at all locations requiring turnpike unless otherwise SHOWN ON THE DRAWINGS and/or DESIGNATED ON THE GROUND. Construct cross-drainage and culverts at locations SHOWN ON THE DRAWINGS and/or DESIGNATED ON THE GROUND. Provide leadoff ditches from side ditches on the lower side of trail at points DESIGNATED ON THE GROUND or
SHOWN ON THE DRAWINGS.
Section 921 – Culverts
921.05 Pipe Culverts. Add the following to the end of this subsection:
(c) Vented Ford. Foundation for vented fords shall be approved in writing by the CO prior to laying pipe culvert or backfilling. Place rock embankment on a prepared surface to form a well graded mass. Place or rearrange individual rocks by mechanical or manual methods to obtain a compact uniform embankment with a reasonably smooth surface.
Payment
921.11 Basis. Add the following PAY ITEM and PAY UNIT:
Make payment under:
PAY ITEM PAY UNIT
921(07) Shallow Stream Vented Ford ……………….…………………..Each
Section 931 – Log Stringer Bridge
931(02) Requirements. Delete the text of this subsection and replace with the following:
The location of trees for native timber materials will be DESIGNATED ON THE GROUND. Native materials are located within 300’ of the bridge site(s). Use materials meeting the requirements of section 962.
Construction
931.03 General. Add the following to the end of this subsection:
One crossing is permitted at each bridge site in accordance with conditions outlined in the Best Management Practices and approved by the CO. Thereafter, do not operate machinery within the ordinary high water limits as DESIGNATED ON THE GROUND. When available utilize existing bridge structures to transport equipment and materials.
931.05 Mud Sills. Delete the last sentence of this subsection.
931.09 Handrails. Delete the first sentence of this subsection and replace with the following:
Construct rails with logs AS SHOWN ON THE DRAWINGS and use lengths greater than or equal to 10’.
Install handrail on both sides of the bridge superstructure.
Section 941 – Aggregate Surfacing and Base Course
941.02 Requirements. Delete the last paragraph of this subsection and substitute the following:
Obtain aggregate from commercial suppliers or other sources approved by the CO in writing.
Construction
941.06 Spreading and Compacting. Delete the second sentence of the first paragraph of this subsection and substitute the following:
The maximum thickness of any one layer shall be 6”.
Measurement
941.09 Method. Add the following to this subsection:
Estimated quantities SHOWN IN THE SCHEDULE OF ITEMS for volume of base course and/or aggregate surfacing are in place and compacted to the dimensions SHOWN ON THE DRAWINGS or described in the specifications. Estimating values used to determine loose quantity for haul or stockpiling range from 20-30%.
Section 954 – Obliteration of Abandoned Trailways
954.06 Scarify. Delete the text of this subsection and replace with the following:
Scarify the trail to promote establishment of vegetation in all areas requiring trail obliteration unless otherwise SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND. Scarify areas outside of required trail obliteration when SHOWN ON THE DRAWINGS or DESIGNATED ON THE
GROUND.
Scarification is defined as breaking up the compacted soil to a depth of 6” and maximum clod size of 3”.
954.08 Trench Backfill. Delete the text of this subsection and replace with the following:
Backfill trenched trail sections where SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND with compact suitable material until flush with the adjacent ground surface. Obtain backfill material from designated borrow sources.
Section 956 – Water Pollution Prevention (Added Section)
956.01 Work. The work consists of construction controls to protect the environment, facilities, machinery, workers, and the public from damage or injury.
Furnish all labor, equipment, materials, transportation and other incidentals necessary to complete the work in accordance with these specifications and Best Management Practices (BMP’s).
Rules and Regulations
956.02 Methods. All construction methods and procedures shall be in compliance with the State of Alaska, Department of Labor, Division of Occupational Safety and Health, Construction Standards and the State of Alaska, Division of Labor Standards. The contractor shall become familiar with current OSHA rules and observe these regulations at all times during the term of this contract.
956.03 Camping and Sanitary Facilities. Permits are required to camp on National Forest Lands.
Permits may be obtained from the Glacier Ranger District Office. The contractor shall provide sanitary facilities at or near camp sites in accordance with all State of Alaska and Local Sanitation Codes.
Storm Water Pollution Prevention Plan (SWPPP)
956.04 Provisions. Address provisions outlined in 40 CFR 122.26, EPA’s General Permit Construction Activities 64 FR 68722 and EPA 832-R-92-005 and include at a minimum the following:
(1) Identify potential sources of pollution which may reasonably be expected to affect the quality of storm water discharge from the site(s).
(2) Select applicable BMP’s from EPA 832-R-92-005.
(3) Describe and ensure implementation of BMP’s which will be used to reduce the pollutants in storm water discharge at the construction site(s).
(4) Ensure compliance with the terms of EPA’s 64 FR 68722 for storm water discharge.
(5) Provide a completed signed original of the Notice of Intent and Notice of Termination (except for effective date), to comply with EPA’s General Permit for Construction Activities 64 FR 68722.
Section 956 – Water Pollution Prevention (continued)
Cleanup and Disposal
956.05 Requirements. Remove all temporary facilities and construction controls upon completion of the work unless otherwise required or approved by the CO. Leave work area clean and free of all debris associated with this section of work.
Measurement
956.06 Method. There will be no separate measurement for this item.
Payment
956.07 Basis. Payment will be considered incidental to other pay items in this contract.
Section 961 – Rock, Grid Pavement Units, and Aggregate
961.06. Crushed Aggregate for Base or Surface Course. Delete the text of the first two paragraphs of this subsection and substitute the following:
Grading ‘A’ as SHOWN IN THE SCHEDULE OF ITEMS shall conform to the aggregate quality requirements for aggregate surfacing currently in use by the local State Department of Transportation, the Borough, or City. Grading shall conform to State of Alaska grade D-1 or approved equal. Submit a certificate of compliance that the aggregate meets their requirements. Certify the locations of past projects for the CO’s inspection prior to approval.
Section 962 – Material for Timber Structures
962.01 Timber. Add the following paragraph to the end of this subsection:
TIMBER, LUMBER AND BOARDS
A. Alaska Yellow Cedar, tight knot, selected for appearance, resawn to standard nominal dimensions except where special shapes are specified or indicated. Sizes as indicated on drawings.
B. Moisture content of no more than19%, for lumber under 2” thick and 25% maximum for lumber over 2” thick.
C. Sawn bulkheads, deck spacers, sawn timber decking, and curbs shall be Alaska Yellow Cedar grade No. 2 or better.
962.04 Preservative. Delete the first sentence of the first paragraph and substitute the following:
Use wood preservative treatment methods meeting the requirements of AASHTO M 133 and the last paragraph to this subsection as SHOWN ON THE DRAWINGS.
Delete the last sentence of the third paragraph and substitute the following:
Field treat, with Copper Napthanate or approved equal, any area hewn, notched, cut, or drilled after initial preservative treatment.
962.04 Preservative. Add the following paragraph to the end of this subsection:
Mud sills, stringers other than native log, and sawn timber retainers may be Alaska Yellow Cedar or Western Hem-Fir grades No. 2 or better. Western Hem-Fir shall be pressure treated with Copper Napthanate having a minimum retention rate of 0.06 pcf (pounds per cubic foot) or approved equal.
Troll
11 12
14 13 t r
Kenai Lake
End Project Foils Creek to Vagt Lake 195+58
Vag! Lake
0.0
7 8
... 18 17 , I , VICINITY MAP
Scale in Miles
1.0
[l] Developed Trailhead
[f] Undeveloped Parking to Vagt
ATV Trail
End Project Ptarmigan to Falls Creek 117+60
30 29
Access 47+04
1.5
T. 4 N.
118+40
T. 4 N.
LAKE
Station/ Milepost
Description of Work Ptarmigan Creek Access 5+00 to 47+04
Pay Item Estimated Quantity
Sta. 5+00
= MP 0.8
Begin Project. Station 5+00 equals approximately milepost 0.8 of existing trail. Begin Centerline Staking for 4,204’ ahead. Begin Clearing and Grubbing & Excavation for 778’ ahead. See typical control point and tables sheet H.1-6 of drawings. See typical details on sheets C.1-2 and C.5 of drawings.
908(01) 911(02) 912(01)
4,204 L.F.
778 L.F.
778 L.F.
5+00
Possible bedrock on sideslop from Station 5+00 to 13+79.
5+69 Intersect and cross proposed Iditarod mainline station 10+48. See plan sheet G.3 of drawings.
6+30 Construct Grade Dip. See typical detail on sheet E.2 of drawings.
912(06) 1 Each
6+32
Possible bedrock on slope for about 30’
7+77 Construct Grade Dip. 912(06) 1 Each
9+41 Construct Grade Dip. 912(06) 1 Each
10+77 Duff on top of rock outcrop
11+23 Construct Grade Dip. 912(06) 1 Each
11+72 Minimum cut 2’ at centerline. Daylight trailbed left.
13+59 Construct retained aggregate causeway for 20’ ahead.
See details on sheet C.4 of drawings.
913(03) 941(02) 941(10)
11 S.Y.
2 C.Y.
40 L.F.
13+65
Install 12” Corrugated Polyethylene Pipe. See detail sheet E.1 of drawings
921(01)
6 L.F.
14+04
14+04
Connect to existing Ptarmigan Creek Trail. Obliterate all segments of existing trail that are not being restored.
Continue 80’ past where the existing Ptarmigan Creek Trail crosses the proposed Ptarmigan to Falls Creek Trail.
See sheet G.2 of drawings.
End Clearing and Grubbing. End Excavation. Begin Trail Restoration for 1,296’ ahead. See sheet C.3 of drawings.
954(02)
915(01)
1360 L.F.
1,296 L.F.
14+04 Construct retained aggregate causeway for 212’ ahead.
Trail parallels Ptarmigan Creek edge 10-40’ to left for approximately 200’ ahead.
913(03) 941(02) 941(10)
117 S.Y.
17 C.Y.
424 L.F.
WORK SUMMARY
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
IDITAROD NATIONAL
HISTORIC TRAIL
SHEET D.1
Description of Work Ptarmigan Creek Access 5+00 to 47+04
16+76
18+87
Ptarmigan Creek edge approximately 10’ left.
User made fishing access trail on left.
19+32 Construct retained aggregate causeway for 112’ ahead. 913(03)
941(02) 941(10)
62 S.Y.
9 C.Y.
224 L.F.
24+82 Construct retained aggregate causeway for 22’ ahead. 913(03)
941(10)
12 S.Y.
2 C.Y.
44 L.F.
25+14 Existing shallow stream ford and gully crossing structure.
25+24 Construct retained aggregate causeway for 40’ ahead. 913(03)
941(10)
22 S.Y.
3 C.Y.
80 L.F.
25+74 End Trail Restoration. Begin Clearing and Grubbing &
Excavation for 559’ ahead. Construct Grade Dip.
911(02) 912(01) 912(06)
559 L.F.
559 L.F.
1 Each
27+10 +/- Rock outcrop on right.
27+51 Rock outcrop on right. Construct Grade Dip. 912(06) 1 Each
28+77 Construct Grade Dip. 912(06) 1 Each
28+87 Construct Ditch on right for 33’ ahead. See detail sheet
C.5 of drawings.
912(09) 33 L.F.
29+30 Construct Grade Dip. 912(06) 1 Each
30+40 Rock outcrop on right. Brown wildlife box approximately
35’ right. Do not disturb.
30+89 Rock outcrop on right.
31+33 Connect to existing Ptarmigan Creek Trail. End Clearing and Grubbing. End Excavation. Begin Trail Restoration for 1,571’ ahead.
1,571 L.F.
SHEET D.2
Description of Work Ptarmigan Creek Access 5+00 to 47+04
31+59 Move trail alignment approximately 8’ right into rock ledge for 25’ ahead. Alignment change is incidental to 915(01).
Bedrock visible on trail.
32+84 Ptarmigan Creek edge approximately 10’ to left. Bedrock visible on existing trail for approx. 10’.
33+17 Ptarmigan Creek edge approximately 20’ to left.
33+64 Ptarmigan Creek edge approximately 15’ to left.
Construct retained aggregate causeway for 244’ ahead.
913(03) 941(02) 941(10)
136 S.Y.
18 C.Y.
488 L.F.
36+00 +/- Enter thinned cutting unit.
37+08 Move trail alignment approximately 10’ right as staked for
107’ ahead. Alignment change is incidental to 915(01).
38+58 Construct retained aggregate causeway for 184’ ahead. 913(03)
941(10)
102 S.Y.
14 C.Y.
368 L.F.
42+23 Construct retained aggregate causeway for 38’ ahead. 913(03)
941(10)
22 S.Y.
3 C.Y.
76 L.F.
43+50 Construct Grade Dip. 912(06) 1 Each
43+99
Begin Trail Restoration for 32’. Max slope shall be 8%.
32 L.F.
44+49 Construct Grade Dip. 912(06) 1 Each
47+04 Spike in center of existing Ptarmigan Creek trail.
Chugach National Forest trailhead kiosk approximately 10’ to south. End Centerline Staking. End Trail Restoration. End project segment.
SHEET D.3
Description of Work Ptarmigan Creek to Falls Creek 10+04 – 117+60
10+04 Begin project. Approximate north abutment to proposed
Ptarmigan Creek Bridge. Beginning Centerline Staking for 10,756’ ahead. Begin Clearing and Grubbing & Excavation for 10,756’ ahead. See typical control point and tables sheet H.1-6 of drawings. See typical details on sheets C.1-2 and C.5 of drawings.
908(01) 911(02) 912(01)
10,756 L.F.
10,756 L.F.
10,756 L.F.
10+08 Cross existing Ptarmigan Creek Access Trail.
10+48 Cross proposed Ptarmigan Creek Access Trail. See plan sheet G.3 of drawings.
10+71 Construct Grade Dip. See typical detail on sheet E.2 of
13+76 Visible rock on surface.
14+06 Construct Grade Dip. 912(06) 1 Each
16+49 Construct Grade Dip. 912(06) 1 Each
18+50 Construct Turnpike, Log Retainer, Type 1 for 224’ ahead. See sheet F.3 of drawings for details.
913(01) 913(03)
224 L.F.
124 S.Y.
22+49 Construct Grade Dip. 912(06) 1 Each
22+59 Construct Turnpike, Log Retainer, Type 1 for 74’ ahead. 913(01)
913(03) 74 L.F.
42 S.Y.
28+93 Install 12” Corrugated Polyethylene Pipe. See detail sheet E.1 of drawings.
921(01) 6 L.F.
30+39 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
30+40 Construct Ditch on left for 44’ ahead. See detail sheet
912(09) 44 L.F.
32+06 Begin sweeping turn left.
SHEET D.4
Description of Work Ptarmigan Creek to Falls Creek 10+04 – 117+60
33+52 Construct Turnpike, Log Retainer, Type 1 for 58’ ahead. 913(01)
58 L.F.
32 S.Y.
35+28 Construct Grade Dip. 912(06) 1 Each
35+97 Construct Grade Dip. 912(06) 1 Each
40+34 Construct Puncheon with Decking for 40’ ahead. See details on sheet F.4 of drawings.
932(01) 40 L.F.
43+49 Construct Grade Dip. 912(06) 1 Each
45+71 Construct Shallow Stream Ford and Gully Crossing
Structure. See detail on sheet E.3 of drawings.
912(07) 1 Each
46+74 Creek approximately 40’ right.
47+48 Construct Grade Dip. 912(06) 1 Each
50+66 Construct Grade Dip. 912(06) 1 Each
51+96 Construct Grade Dip. 912(06) 1 Each
54+24 Creek approximately 30’ right.
55+04 Construct Grade Dip. 912(06) 1 Each
55+66 Creek approximately 30’ right.
56+11 Creek approximately 50’ right.
57+01 Construct Grade Dip. 912(06) 1 Each
58+27 Construct Puncheon with Decking for 73’ ahead. 932(01) 73 L.F.
63+12 Construct Puncheon with Decking for 88’ ahead. 932(01) 88 L.F.
64+17 Begin descending turn left.
64+93 Construct Grade Dip. 912(06) 1 Each
65+36 Cross overgrown spur road. Rock on surface 20’ left.
SHEET D.5
Description of Work Ptarmigan Creek to Falls Creek 10+04 – 117+60
65+91 Intersect & cross existing Falls Creek ATV trail.
69+03 Construct Grade Dip. 912(06) 1 Each
72+08 Construct Grade Dip. 912(06) 1 Each
75+30 Construct Grade Dip. 912(06) 1 Each
76+00 Construct Grade Dip. 912(06) 1 Each
76+92 Construct Grade Dip. 912(06) 1 Each
77+96 Construct Grade Dip. 912(06) 1 Each
78+80 Construct Ditch on left for 16’ ahead. 912(09) 16 L.F.
78+88 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
83+70 Construct Grade Dip. 912(06) 1 Each
89+00 Construct Grade Dip. 912(06) 1 Each
89+20 Minimum cut 2’ at centerline. Daylight trailbed right.
90+86 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
92+82 Construct Puncheon with Decking for 17’ ahead. 932(01) 17 L.F.
94+11 Construct Grade Dip. 912(06) 1 Each
94+71 Construct Grade Dip. 912(06) 1 Each
96+12 End wood Pline stakes. Begin wire stake Pline flags.
96+42 Construct Grade Dip. 912(06) 1 Each
98+63 Construct Grade Dip. 912(06) 1 Each
102+95 Construct Ditch on right for 281’ ahead. 912(09) 281 L.F.
SHEET D.6
Description of Work Ptarmigan Creek to Falls Creek 10+04 – 117+60
104+23 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
105+77 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
106+75 Construct Grade Dip. 912(06) 1 Each
107+58 Swale, construct Grade Dip. 912(06) 1 Each
110+70 Construct Grade Dip. 912(06) 1 Each
113+72 Construct Shallow Stream Ford and Gully Crossing
Structure.
113+92 Minimum cut 2’ at centerline.
114+04 Construct Ditch on right for 80’ ahead. 912(09) 80 L.F.
114+04
Install two 12” Corrugated Polyethylene Pipes as needed.
12 L.F.
116+80 Construct Grade Dip. 912(06) 1 Each
117+60 Resume wood Pline stakes. Approximate south abutment proposed Falls Creek bridge. Bridge construction to be completed by others. End Centerline Staking. End Clearing and Grubbing. End Excavation and project segment.
SHEET D.7
Description of Work Falls Creek to Vagt Lake 118+40 to 195+58
118+40 Begin project. Approximate north abutment to proposed
Falls Creek Bridge. Beginning Centerline Staking for 7,718’ ahead. Begin Clearing and Grubbing & Excavation for 7,718’ ahead. See typical control point and tables sheet H.1-6 of drawings. See typical details on sheets C.1-2 and C.5 of drawings.
908(01) 911(02) 912(01)
7,718 L.F.
7,718 L.F.
7,718 L.F.
119+47 Construct Switchback Type II right. See details on sheet F.1 of drawings.
914(01) 1 Each
122+07 Construct Switchback Type II left. 914(01) 1 Each
122+61 Climbing turn right.
123+92 Climbing turn right.
125+40 Construct Switchback Type II left. 914(01) 1 Each
125+90 Climbing turn right.
126+20 Construct Ditch on right for 11’ ahead. See detail sheet
912(09) 11 L.F.
126+41 Construct Shallow Stream Ford and Gully Crossing
Structure. See detail on sheet E.3 of drawings.
126+51 Construct Ditch on right for 21’ ahead. 912(09) 21 L.F.
127+90 Construct Shallow Stream Ford and Gully Crossing
128+37 Construct Shallow Stream Ford and Gully Crossing
128+95 Construct Shallow Stream Ford and Gully Crossing
129+05 Construct Ditch on right for 10’ ahead. 912(09) 10 L.F.
129+25 Construct Shallow Stream Ford and Gully Crossing
129+35 Construct Ditch on right for 25’ ahead. 912(09) 25 L.F.
SHEET D.8
Description of Work Falls Creek to Vagt Lake 118+40 to 195+58
129+70 Construct Grade Dip. See typical detail on sheet E.2 of
129+80 Construct Ditch on right for 10’ ahead. 912(09) 10 L.F.
130+94 Construct Grade Dip. 912(06) 1 Each
131+04 Construct Ditch on right for 18’ ahead. 912(09) 18 L.F.
131+32 Construct Shallow Stream Ford and Gully Crossing
131+92 Intersect and cross existing Crown Point ATV trail.
132+40 Construct Grade Dip. 912(06) 1 Each
134+63 Construct Grade Dip. 912(06) 1 Each
135+40 Install 12” Corrugated Polyethylene Pipe. See detail sheet E.1 of drawings.
136+17 Construct Ditch on right for 46’ ahead. 912(09) 46 L.F.
136+64 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
136+70 Construct Ditch on right for 30’ ahead. 912(09) 30 L.F.
137+00
Construct Shallow Stream Ford and Gully Crossing Structure
912(07)
137+26 Construct Shallow Stream Ford and Gully Crossing
137+36 Construct Ditch on right for 12’ ahead. 912(09) 12 L.F.
137+58 Construct Shallow Stream Ford and Gully Crossing
137+68 Construct Ditch on right for 25’ ahead. 912(09) 25 L.F.
138+95 Construct Ditch on right for 45’ ahead. 912(09)
45 L.F.
SHEET D.9
Description of Work Falls Creek to Vagt Lake 118+40 to 195+58
138+95 to 139+40
140+05
Install two 12” Corrugated Polyethylene Pipes as needed between these stations.
Construct Grade Dip.
12 L.F.
141+64 Construct Shallow Stream Ford and Gully Crossing
141+74 Construct Ditch on right for 10’ ahead. 912(09) 10 L.F.
141+94 Construct Grade Dip. 912(06) 1 Each
142+30 Leave thinned unit, enter hemlock & spruce stand.
146+20 Construct Ditch on right for 10’ ahead. 912(09) 10 L.F.
146+84 View Lower Trail Lake left.
148+31 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
148+32
148+32 to 150+45
Construct Ditch on right for 213’ ahead.
Install five 12” Polyethylene Pipes as needed between these stations.
912(09)
213 L.F.
30 L.F.
150+55 Construct Grade Dip. 912(06) 1 Each
150+65 Construct Ditch on right for 24’ ahead. 912(09) 24 L.F.
150+90 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
151+15 Begin steep turn right.
152+20 Swale, construct Grade Dip. 912(06) 1 Each
153+91 Construct Grade Dip. 912(06) 1 Each
154+01 Construct Turnpike, Log Retainer, Type 1 for 69’ ahead.
See detail on sheet F.1 of drawings.
913(01) 913(03)
69 L.F.
38 S.Y.
SHEET D.10
Description of Work Falls Creek to Vagt Lake 118+40 to 195+58
154+01 to 156+38
154+72
155+85
156+38
158+17
158+27
Install four 12” Polyethylene Pipes as needed between these stations
Construct Turnpike, Log Retainer, Type 1 for 88’ ahead.
Construct Turnpike, Log Retainer, Type 1 for 53’ ahead.
Begin descending turn left.
Construct Ditch on left for 20’ ahead.
Install 12” Corrugated Polyethylene Pipe.
913(01)
24 L.F.
88 L.F.
49 S.Y.
53 L.F.
29 S.Y.
20 L.F
6 L.F.
159+61
Rock outcrop approximately 30’ left.
160+06 Construct Ditch on left for 178’ ahead. 912(09) 178 L.F.
160+90 Construct Shallow Stream Ford and Gully Crossing
161+70 Begin descending turn right.
162+36 Construct Shallow Stream Vented Ford. See detail on sheet E.4 of drawings.
912(10)
921(01)A 921(07)
26 C.Y.
24 L.F.
162+80 Construct Grade Dip. 912(06) 1 Each
163+30 Construct Grade Dip. 912(06) 1 Each
164+28 Construct Grade Dip. Enter spruce blow down. 912(06) 1 Each
166+50 Depart spruce blow down.
167+01 Construct Grade Dip. 912(06) 1 Each
168+15 Construct Grade Dip. 912(06) 1 Each
SHEET D.11
Description of Work Falls Creek to Vagt Lake 118+40 to 195+58
169+01
174+30
Rock outcrop on right.
Construct Ditch on right for 31’ ahead.
31 L.F.
174+71
177+83
182+22
182+73
183+03
186+99
187+50
Construct Grade Dip.
Begin descending turn left.
Construct Puncheon with Decking for 30’ ahead. See detail on sheet F.4 of drawings.
Construct 15’ span Log Stringer Trail Bridge, Type 5’ Wide, Alaska Yellow Cedar Log as staked. See detail on sheet F.5-11 of drawings.
Intersect and cross existing Vagt Lake trail.
932(01)
931(03)
20 L.F.
15 L.F.
188+60 View Vagt Lake right.
189+92 Construct Grade Dip. 912(06) 1 Each
190+69 Construct Grade Dip. 912(06) 1 Each
191+30 View Vagt Lake right.
192+00 Undeveloped campsite approximately 60’ right.
193+00 Construct Grade Dip. 912(06) 1 Each
193+90 Rock outcrop on left
194+66 Construct Grade Dip. 912(06) 1 Each
195+58 Near Vagt Lake outlet. Approximate south abutment to proposed bridge. End Centerline Staking. End Clearing and Grubbing. End Excavation and project segment.
SHEET D.12
Description of Work Victor Creek Access 10+00 to 56+58
10+00 Begin project at SE corner of Victor Creek Trailhead.
Begin Centerline Staking for 4,658’ ahead. Begin Trail Restoration for 631’ahead. See typical control point and tables sheet H.1-6 of drawings. See typical details on sheets C.1-2 and C.5 of drawings.
908(01) 915(01)
4,658 L.F.
631 L.F.
13+46 Construct Grade Dip. See typical detail on sheet E.2 of
14+68 Move trail alignment approximately 20’ left as flagged for
64’ ahead. Obliterate each end of abandoned trail for 32’. See sheet G.2 of drawings. Alignment change is incidental to item 915(01).
954(02) 64 L.F.
15+70 Construct Grade Dip. 912(06) 1 Each
16+31 End Trail Restoration. Begin trail realignment left as staked for 230’ ahead. See typical detail on sheets C.1- 2 and C.5 of drawings. Obliterate each end of abandoned trail for 50’.
911(02) 912(01) 954(02)
230 L.F.
230 L.F.
100 L.F.
17+60 Climbing turn right.
18+61 Connect back to existing trail. Resume Trail Restoration for 96’ ahead.
96 L.F.
19+57
End Trail Restoration. Begin trail realignment right as staked for 605’ ahead. Obliterate each end of abandoned trail for 50’.
911(02)
605 L.F.
605 L.F.
19+80 Climbing turn left.
20+39 New alignment crosses existing trail. Obliterate east side of abandoned trail for 30’. Obliterate west side of
954(02) 80 L.F.
21+54 Construct Grade Dip 912(06) 1 Each
21+94 Visible rock on right for approximately 90’ ahead.
23+22 Construct Switchback, Type II right. See detail on sheet F.1 of drawings.
SHEET D.13
Description of Work Victor Creek Access 10+00 to 56+58
23+57 Visible rock on left.
24+88 Construct Shallow Stream Ford and Gully Crossing
Structure. See sheet E.3 of drawings.
25+11 Visible rock on left.
25+62
25+77
Connect back to existing trail. Resume Trail Restoration for 329’ ahead.
Enter power line clearing. Move trail alignment approximately 25’ left as flagged for 176’ ahead.
Obliterate each end of abandoned trail for 50’.
Alignment change is incidental to item 915(01).
329 L.F.
26+28
27+17
27+91
Approximately directly under power line.
Exit power line clearing.
Move trail alignment approximately 10’ left as flagged for 62’ ahead. Obliterate each end of abandoned trail for 31’. Alignment change is incidental to item 915(01).
62 L.F.
28+23
28+91
29+61
Construct Grade Dip
End Trail Restoration. Begin trail realignment left as staked for 190’ ahead. Obliterate each end of
Climbing turn right
190 L.F.
190 L.F.
30+81
31+22
Connect back to existing trail. Resume Trail Restoration for 94’ ahead.
Construct Grade Dip
94 L.F.
31+75 End Trail Restoration. Begin trail realignment left as staked for 674’ ahead. Obliterate each end of
954(02)
674 L.F.
674 L.F.
100 L.F.
34+70 Construct Puncheon with Decking for 50’ ahead. See details on sheet F.4 of drawings.
932(01)
50 L.F.
SHEET D.14
Description of Work Victor Creek Access 10+00 to 56+58
35+57 Construct Puncheon with Decking for 20’ ahead
932(01) 20 L.F.
36+98 Cobble rock draw. Construct Grade Dip. 912(06) 1 Each
37+61 New alignment crosses existing trail. Obliterate each side of abandoned trail for 50’.
38+49 Connect back to existing trail. Resume Trail Restoration for 44’ ahead.
915(01) 44 L.F.
38+93 End Trail Restoration. Begin trail realignment left as staked for 460’ ahead. Obliterate each end of abandoned trail for 50’.
911(02) 912(01) 954(02)
460 L.F.
460 L.F.
39+26 Construct Grade Dip. Remove existing 10’ x 2’ plank walkway/bridge located approximately 12’ right.
912(06) 916(03)
10 L.F.
39+76 New alignment crosses existing trail. Obliterate each side of abandoned trail for 25’
40+04 Construct Switchback, Type II right. 914(01) 1 Each
40+09 +/- New alignment crosses existing trail. Obliterate abandoned trail back for 8’. Obliterate abandoned trail ahead for 50’.
58 L.F.
41+49 Climbing turn right.
43+53 Connect back to existing trail. Resume Trail Restoration for 329’ ahead. Edge of bluff above Victor Creek approximately 5’ right.
915(01) 329 L.F.
44+23 Move trail alignment approximately 12’ left as flagged for
84’ ahead. Obliterate each end of abandoned trail for 42’. Alignment change is incidental to item 915(01).
954(02) 84 L.F.
44+77 Construct Grade Dip 912(06) 1 Each
46+32 Existing Shallow Stream Ford and Gully Crossing
46+82 End Trail Restoration. Begin trail realignment left as staked for 976’ ahead. Obliterate abandoned trail ahead (east) for 50’.
911(02) 912(01) 954(02)
976 L.F.
976 L.F.
SHEET D.15
Description of Work Victor Creek Access 10+00 to 56+58
48+44 Begin large radius (100’ +/-) turn right.
48+74 Construct Puncheon with Decking for 138’ ahead.
932(01) 138 L.F.
52+42 Construct Puncheon with Decking for 33’ ahead. 932(01) 33 L.F.
53+23 New alignment crosses existing trail. Obliterate each side of abandoned trail for 50’
53+39 Begin turn to left.
54+50 New alignment crosses existing trail. Obliterate each side of abandoned trail for 50’
55+82 Construct Turnpike, Log Retainer, Type I for 66’ ahead.
See sheet F.3 of drawings.
913(01) 913(03)
66 L.F.
36 S.Y.
56+58 = 118+08
Connect to Iditarod Mainline at 118+08. End Centerline Staking. End Clearing and Grubbing. End Excavation.
End project Victor Creek Access.
SHEET D.16
Description of Work Snow River to Victor Creek Access 10+00 – 118+08
Pay Item Estimated Quantity
10+00 Begin project. Southeast end of existing railroad access spur road. Beginning Centerline Staking for 19,019’ ahead. Begin Clearing and Grubbing & Excavation for 9,708’ ahead. See typical control point and tables sheet H.1-6 of drawings. See typical details on sheets C.1-2 and C.5 drawings.
908(01) 911(02) 912(01)
10,808 L.F.
9,708 L.F.
9,708 L.F.
10+19 Crossing existing spur ditch line. Install 12” Corrugated
Polyethylene Pipe. See sheet E.1 of drawings.
10+29 On top of existing spur backslope.
11+70 Visible rock on surface for approximately 30’ ahead.
14+29 Construct Shallow Stream Ford and Gully Crossing
Structure. See sheet E.3 of drawings.
14+57 Rock on surface. Cut minimum 2’ at centerline.
Daylight trailbed left.
16+90 Construct Shallow Stream Ford and Gully Crossing
17+04 to 19+07
Construct four Grade Dips as needed between these stations. See detail on sheet E.2 of drawings.
912(06) 4 Each
20+68 Construct Grade Dip. 912(06) 1 Each
21+21 Enter power line right-of-way clearing
21+74 Construct Shallow Stream Ford and Gully Crossing
24+16 Construct Grade Dip 912(06) 1 Each
26+17 Construct Shallow Stream Ford and Gully Crossing
27+47 Construct Grade Dip. 912(06) 1 Each
27+86 Construct Grade Dip. 912(06) 1 Each
29+75 Construct Shallow Stream Ford and Gully Crossing
SHEET D.17
Description of Work Snow River to Victor Creek Access 10+00 – 118+08
Pay Item Estimated Quantity
31+80 Construct Shallow Stream Ford and Gully Crossing
32+50
Depart power line right-of-way clearing. Trail alignment travels right across backslope.
34+19 Construct Shallow Stream Ford and Gully Crossing
36+57 Construct Shallow Stream Ford and Gully Crossing
37+98 Construct Turnpike, Log Retainer, Type 1 for 50’ ahead.
See sheet F.3 of drawings for details.
913(01) 913(03)
28 S.Y.
39+75 Construct Switchback Type II right. Sheet details on sheet F.1 of drawings.
41+85 Climbing turn left.
42+89 Construct Turnpike, Log Retainer, Type I for 40’ ahead. 913(01)
40 L.F.
22 S.Y.
45+66 Construct Shallow Stream Ford and Gully Crossing
47+35 Construct Grade Dip. 912(06) 1 Each
47+45 Construct Turnpike, Log Retainer, Type I for 20’ ahead. 913(01)
20 L.F.
11 S.Y.
48+34 Construct Grade Dip. 912(06) 1 Each
50+04 Construct Shallow Stream Ford and Gully Crossing
52+78 Lake view on left. Construct Ditch on right for 102’ ahead. See sheet C.5 of drawings.
912(09) 102 L.F.
53+53 Construct Grade Dip. 912(06) 1 Each
53+90 Construct Grade Dip. 912(06) 1 Each
SHEET D.18
Description of Work Snow River to Victor Creek Access 10+00 – 118+08
54+15
54+25
Construct Shallow Stream Ford and Gully Crossing Structure.
Construct Turnpike, Log Retainer, Type I for 10’ ahead.
912(07)
10 L.F.
6 S.Y.
55+95 Construct Turnpike, Log Retainer, Type I for 128’ ahead. 913(01)
128 L.F.
71 S.Y.
58+12 Construct Shallow Stream Ford and Gully Crossing
59+20 Construct Grade Dip. 912(06) 1 Each
59+40 Construct Shallow Stream Ford and Gully Crossing
61+32 Construct Grade Dip. 912(06) 1 Each
62+95 Construct Turnpike, Log Retainer, Type I for 197’ ahead. 913(01)
197 L.F.
109 S.Y.
64+45 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
65+57 Construct Turnpike, Log Retainer, Type I for 44’ ahead. 913(01)
44 L.F.
24 S.Y.
66+11 Construct Grade Dip. 912(06) 1 Each
66+53 Construct Shallow Stream Ford and Gully Crossing
73+74 Construct Shallow Stream Ford and Gully Crossing
77+69 Construct Grade Dip. 912(06) 1 Each
77+87 Crossing under ELF line.
80+35 Construct Grade Dip. 912(06) 1 Each
SHEET D.19
Description of Work Snow River to Victor Creek Access 10+00 – 118+08
81+00
82+33
82+69
83+23
Approximate location of half buried cable
Construct Grade Dip.
Construct Turnpike, Log Retainer, Type I for 50’ ahead.
28 S.Y.
83+47 Install 12” Corrugated Polyethylene Pipe. 921(01) 6 L.F.
85+65 Construct Grade Dip. 912(06) 1 Each
87+73 Construct Grade Dip. 912(06) 1 Each
89+43 Construct Grade Dip. 912(06) 1 Each
91+27 Construct Shallow Stream Ford and Gully Crossing
93+69 Construct Grade Dip. 912(06) 1 Each
96+77 Construct Turnpike, Log Retainer, Type I for 53’ ahead. 913(01)
53 L.F.
29 S.Y.
100+26 Construct Grade Dip. 912(06) 1 Each
102+20 Lake view on left.
103+26 Construct Grade Dip. 912(06) 1 Each
103+41 Construct Grade Dip. Visible rock on surface for approximately 40’ ahead.
103+82 Descending turn right.
104+56 Construct Grade Dip. Visible rock on surface for approximately 25’ ahead.
105+11 Construct Grade Dip. 912(06) 1 Each
SHEET D.20
Description of Work Snow River to Victor Creek Access 10+00 – 118+08
107+08
107+83
108+31
Approximate south Victor Creek proposed bridge abutment. Bridge construction to be completed by others. End Clearing and Grubbing. End Excavation.
Approximate north Victor Creek proposed bridge abutment. Resume Clearing and Grubbing & Excavation for 627’ ahead.
Climbing turn left.
627 L.F.
627 L.F.
109+09 Construct Grade Dip. 912(06) 1 Each
109+53 Construct Grade Dip. 912(06) 1 Each
110+73 Climbing turn right.
112+04 Climbing turn left.
113+31 Construct Grade Dip. 912(06) 1 Each
113+68 Construct Grade Dip. 912(06) 1 Each
114+10 Connect to existing Victor Creek Trail. End Clearing and Grubbing. End Excavation. Begin Trail Restoration for 266’ ahead. See sheet C.3 of drawings.
915(01) 266 L.F.
115+97 Construct Grade Dip. 912(06) 1 Each
116+76 Leave existing Victor Creek Trail. Obliterate existing trail ahead (west) for 50’. See sheet G.2 of drawings.
Resume Clearing and Grubbing & Excavation for 8,343’ ahead.
911(02) 912(01) 954(02)
132 L.F.
132 L.F.
118+08=
56+68 Junction with proposed Victor Creek Access left.
SHEET D.21
256 17.0
12" Spruce120 21.3
14" Spruce 304 24.5 14" Spruce
Control Point Table - Ptarmigan Creek Access
Azimuth Slope Distance - FT
300 32.3 12" Spruce
35.8 8" Spruce
200 29.7 12" Spruce
Control Point # Centerline Station Diameter/Tree Species
1643 16+43
2695 26+95
3608 36+08
Sheet H.2
Sheet H.3
10037 100+47
11206 112+06
2074 20+74
2968 29+68
7159 71+59
23.9 16" Hemlock
3955 39+55
4993 49+93
8034 80+34
9162 91+62
72 21.0
10" Hemlock250
36.1
15" Hemlock
12" Hemlock
24.4
Control Point # Centerline Station Diameter/Tree Species
10" Hemlock
24.5 15" Hemlock
10" Hemlock 10" Hemlock
Control Point Table - Ptarmigan to Falls Creek
Azimuth Slope Distance - FT
307 38.4
8" Hemlock
14" Hemlock
15" Hemlock 343 40.8 15" Hemlock 248 24.6 271 23.2
6136 61+36
355 35.4
18 23.9 63 23.6
15" Hemlock 266 27.2 12" Hemlock 344 25.9 8" Hemlock
250 39.3 20" Hemlock 331 22.2
10" Hemlock 178 22.4 12" Hemlock 98 46.4
14" Hemlock 176 29.0 10" Hemlock 89 31.1
10" Birch 133 17.7 8" Spruce 198 21.3
44 21.8
27 23.3
12" Birch 163 31.6 8" Birch
197 19.2 116 22.1
7" Spruce 98 21.1 10" Spruce
339 18.2
16167 160+67 11" Spruce
10" Hemlock
15275 151+75 12" Hemlock
8" Spruce
8" Hemlock 101 23.9 254 28.0 10" Hemlock
Control Point Table - Falls Creek to Vagt Lake
Azimuth Slope Distance - FT
293 26.0 10" Spruce
Control Point # Centerline Station Diameter/Tree Species
19.5 10" Hemlock 30 31.2 10" Hemlock
141 24.6 12" Hemlock 19 26.8
12361 122+61
13124 130+24
14433 143+33
19038 189+38
17001 169+01
18079 179+79
Sheet H.4
4317 43+29
5035 50+47
278 38.0
Control Point # Centerline Station
2154 21+54
2934 29+36
16.8
Diameter/Tree Species
10" Hemlock 317 35.3 14" Hemlock
12" Hemlock
18" Hemlock 16" Hemlock
Control Point Table - Victor Creek Access
Azimuth Slope Distance - FT
354 50.8 12" Hemlock
14" Hemlock 93 47.4 360 36.5
54 23.7 12" Hemlock 342 33.1
Sheet H.5
10" Hemlock 267 45.7 10" Hemlock 311 39.4
14" Hemlock 298 44.1 14" Hemlock 337 26.7
143 44.4 16" Spruce
78 25.6 10" Hemlock 18 30.7
12" Spruce 122 34.9 18" Hemlock 83 38.3
48 34.6
48.8 79 38.6 16" Hemlock
9' Spruce
110 42.0 10" Hemlock 14" Hemlock
Control Point Table - Snow River to Victor Creek Access
Azimuth Slope Distance - FT
325 14.6
60+34
32.7 12" Spruce
Control Point # Centerline Station Diameter/Tree Species
20" Spruce
1…