RECOVERY Iditarod National Historic Trail Improvement - Vagt to Snow River Segment
Solicitation number
AG-0489-S-10-0482
Issued by

About this file

Amendment Two - Provides project clarification from pre-proposal meeting via an errata sheet. Solicitation close remains June 16 2010 at 2 00 pm PT

View the file

Other files

File Type Posted
AG-0489-S-10-0482_amend1.pdf PDF
AG-0489-S-10-0482_sectionj_attach.pdf PDF
AG-0489-S-10-0482_inht-vagt.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Two (2) June 4, 2010

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

US Forest Service EROC Northwest 16400 Champion Way Sandy, OR 97055

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-0489-S-10-0482 RECOVERY

Iditarod National Historic Trail Improvement – Vagt to Snow River

9B. DATED (SEE ITEM 11)

05/04/2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Amendment Two - Provides project clarification from pre-proposal meeting via an errata sheet.

NOTE: Acknowledgement of Amendments via fax to (503) 668-1621 is acceptable.

The solicitation close has not been extended and remains June 16, 2010 at 2:00 pm PT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TONYA RYMER

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

6/04/2010 (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

ERRATA SHEET

Drawings & Specification Clarifications:

• Delete sheet F.3 in the drawings and replace with Turnpike 913-1 included in this addendum.

• Timber Structures – o Turnpike – logs shall be native logs o Puncheon – mud sills and stringers shall be either Alaska Yellow Cedar or treated timber.

Decking and Curbs shall be Alaska Yellow Cedar.

Project Staging Area – An area at Kenai Lake Work Center located near mile post 23 on the Seward Highway will be available for long term storage throughout the duration of the project. Short term staging areas will be available within the trail right-of-way. Locations for short term storage shall be approved by the COR.

Side Ditch

TURNPIKE -TYPE

NOT TO SCALE

- Butt retainers together.

Backfill & Compact

PLAN VIEW

Crown surface 2" higher than top retainer.

Inlay wire into log --_ Ground Line

Trailbed I Width

Stakes

Leadaff Ditch

SECTION A-A

A .. .. .. .. , For native logs, tie together with No. 9 galvanized wire, or approved equal, three ties per log set minimum

Twist or wrap wire at midpoint to remove slack

6-8" diameter logs

12-24 inches

2" x 24" Long --Turnpike - Type I

CROSS SECTION -- "-'

Not to Scale F.3

Native logs are available near project sites (300' or less typical) 3/97 913-1 cmarzullo Cross-Out