AG-0489-S-10-0448 Solicitation Pckg.pdf
PDF 920 KB Posted
- Attached to
- RECOVERY-Install septic tanks at Blue Mountain Work Center. Malheur NF, Bates, Grant County, Oregon.
- Solicitation number
- AG-0489-S-10-0448
About this file
Solicitation Package
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment No 1.docx | DOCX document | |
| AG-0489-S-10-0448 PLANS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-0489-S-10-0448
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
April 14, PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
379435
6. PROJECT NO.
7. ISSUED BY CODE 0489 8. ADDRESS OFFER TO
US FOREST SERVICE
EROC NORTHWEST
16400 CHAMPION WAY
SANDY OR 97055
US FOREST SERVICE
EROC NORTHWEST
16400 CHAMPION WAY
SANDY OR 97055
9. FOR INFORMATION
CALL:
A. NAME
BRIAN BECKSTRAND
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(503) 668-1648
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
TAS::12 1102::TAS RECOVERY-Install Septic System, Blue Mountain Work Center-Malheur National Forest-Grant County, OREGON
This Request for Proposal is issued under the provisions of the American Recovery and Reinvestment Act of 2009(ARRA)
This procurement is 100% Set-Aside for Historically Underutilized Business Zones (HUBZone). Contractor s are required to be registered with Central Contractor Registration (CCR) and the Online Representations and Certifications Application (ORCA).
The magnitude of construction for this project is between $100,000 and $250,000.
Technical questions may be directed to: Darren Lemon, (541) 575-3018.
See Section L for detailed instructions on how to submit your proposal. No FAX or email proposals will be accepted.
The Government contemplates award of a firm-fixed priced contract resulting from this solicitation.
Attachments: See Section “J” for a full list of all attachments.
11. The Contractor shall begin performance within 10 calendar days and complete it within 120 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by 1600 (hour) local time May 14, 2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract.
The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 3 of 123
TABLE OF CONTENTS
CONSTRUCT SEPTIC SYSTEM AT BLUE MOUNTAIN WORK CENTER
MALHEUR NATIONAL FOREST
PART I – CONTRACT SPECIFICATIONS
SECTION A – SF-1442
SECTION B – Supplies or Services and Prices/Costs (Schedule of Items)
SECTION C – Descriptions/Specifications/Statement of Work
SECTION D – Packaging, Marking and Layout
SECTION E – Inspection and Acceptance
SECTION F – Deliveries and Performance
SECTION G – Contract Administrative Data
SECTION H – Special Contract Requirements
PART II – CONTRACT CLAUSES
SECTION I – Clauses Incorporated by Reference
AGAR/FSAR and SPECIAL CONTRACT CLAUSES
ARRA Required Clauses (full text)
PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J – Exhibits, Attachments, and Appendices
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – Representations, Certifications and Other Statements of Offerors or
Respondents
SECTION L – Instructions to Offeror/Notices
SECTION M – Evaluation Factors for Award
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 4 of 123
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
B.1 Schedule of Items
Item No. Description Pay
Unit
Unit Quantity Cost
002113-1 Mobilization LS LS 1 $
011100-1 Permitting LS LS 1 $
011100-2 Test Pits LS LS 1 $
017700-1 Project Closeout/Operation and Maint. Manuals LS LS 1 $
017700-2 Record Drawings LS LS 1 $
024113-1 Demolition of existing septic tanks EA AQ 3 $
333100-1 4" Sanitary Sewer LF AQ 500 $
333600-1 2000 gallon Septic Tank EA DQ 2 $
333600-2 5000 gallon Septic tank EA DQ 1 $
333913-1 Manhole EA AQ 2 $
333700-1 Effluent Treatment System LS LS 1 $
333700-2 Drainfield Trench LF AQ 1000 $
Total of All Items:
B.2 Note:
Payment for bond premiums in accordance with clause 52.232-5, Payments under Fixed Price
Construction Contracts, shall not be in addition to the contract price. Include bond payments under
151.01 Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
Facsimile and emailed offers will not be considered. All offers must be hand carried or mailed to reach the address on page 1 of this solicitation by the date indicated on page 1.
Vendor Name: Phone
Signature: Fax
Address: Email
City, State, Zip: TIN#
Duns#
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 5 of 123
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 DESCRIPTION OF WORK
Supply and install all septic tanks, piping, cleanouts, manholes, wastewater treatment modules, control panels and drainfields to provide complete wastewater treatment for three facilities at the Blue
Mountain Work Center. Work includes, permitting, excavation and backfill, testpits, and all supplies and installation required to provide a complete ODEQ approved system.
C-2 PROJECT LOCATION
The project is located at Blue Mountain Work Center near Bates, OR. From Prairie City, Oregon travel east on Hwy 26 fourteen miles. Blue Mountain Work Center is located on the north side of the Highway across from the ODOT maintenance facility.
C-3 AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 6 of 123
C-4 STATEMENT OF WORK/SPECIFICATIONS
SECTION 00 21 13
INSTRUCTION TO BIDDERS
PART 1 – GENERAL
DESCRIPTION
The basis for measurement and payment for all work performed under this contract shall be as listed in the "Bid Form." Unless the work to be performed is specifically called out to be measured and paid for in the Bid Form, payment for such work shall be included in other applicable items of the Bid Form.
There shall be no separate measurement and payment for any such work not specifically listed in the Bid
Form.
Items listed in the Bid Form as lump sum shall be on a lump sum all required basis. No direct measurement will be made for lump sum bid items. Bid items calling for unit prices show estimated quantities of work to be performed. These quantities, although shown with as much accuracy as possible, are approximate only and are for bidding purposes only. Payment to the Contractor shall be made on the quantity of work actually performed by the Contractor.
The summation of all bid items under the Bid Form shall equal all work required by the Drawings and
Specifications regardless of whether individual items of work are described under bid item descriptions or not. Payment shall be made at the contract unit bid or lump sum prices listed in the Bid. The prices listed therein shall be payment in full for all labor, tools, equipment, materials, etc., which are required to construct respective bid items according to the Contract Documents, including all work and materials incidental thereto.
Payment for unit bid items and lump sum bid items only partially completed at the end of monthly pay periods shall be based on a percentage of work completed as determined by the Government. An example is the construction of pipelines where the unit bid price includes the excavation and backfill of the trenches, installation of pipe, trench compaction, flushing and testing, although the Contractor may have installed a certain footage of pipeline, yet has not completed the testing and/or restoration work.
The actual payment for that bid item will be reduced to reflect the actual amount of work completed.
Providing valve keys shall be incidental to the work. Provide, at a minimum, two valve keys for each type/size of valve nut.
Dewatering shall be incidental to the contract.
Payment for the final 20% of the total contract price will not be made until Bid Items 2 and 3 are complete.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 7 of 123
Bid Item 002113-1 – Mobilization/Demobilization
Measurement for payment for mobilization/ demobilization shall be on a lump sum all required basis.
Payment shall be made at the lump sum price stated in the Bid Form for "Mobilization/
Demobilization". Progress payments for mobilization lump sum will be paid as follows:
(a) If applicable, bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments
Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.
(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.
(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.
(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.
Include all costs associated with the initial cleaning of equipment in the unit bid price for Mobilization.
Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the CO for the convenience of the government.
BID ITEM 01100-1 - Permitting
Measurement and payment for the permitting will be made on a lump sum basis and shall include filing of all permits and payment of fees to complete the wastewater treatment system at blue mountain work center. This item also includes providing copies of all communication with
ODEQ to the CO. Payment shall be made at the lump sum price stated in the Bid Form for
―Permitting".
BID ITEM 01100-1 – Test Pits
Measurement and payment for the test pits will be made on a lump sum basis and shall include excavation and backfill of all test pits required by ODEQ for the evaluation of the site. Payment shall be made at the lump sum price stated in the Bid Form for ―Test Pits".
Bid Item 017700-1 – Project Closeout/Operation and Maintenance Manuals
Measurement and payment for the Project Closeout and Operations and Maintenance Manuals shall be made on a lump sum basis shall include all project closeout items including the punchlist, all operations and maintenance manuals for the pump, control panels, motors, motor regulator, and other O&M manuals as required. Payment shall be made at the lump sum price stated in the Bid Form for ―Project closeout/O&M Manuals".
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 8 of 123
Bid Item 017700-1 – Record Drawings
Measurement and payment for the Record Drawings shall be made on a lump sum basis shall include all submittals and re-submittals of both electronic and hard-copy record drawings.
Payment shall be made at the lump sum price stated in the Bid Form for ―Record Drawings".
BID ITEM 024113-1 – Demolition of Existing Septic Tanks
Measurement for payment for septic tank decommissioning shall be measured on a per each basis and shall include the complete removal and disposal of the existing septic tank regardless of size, preservation of the existing sewer lines, pumping of the tanks, fees, and all other items to make this bid item complete. Payment shall be made at the unit price as designed and as stated in the
Bid Form for "Demolition of Existing Septic Tanks".
BID ITEM 333100-1 – 4" Sanitary Sewer Pipe
Measurement for payment for 4‖ Sanitary Sewer Pipe shall be measured on a linear foot basis and shall include all excavation, backfill, pipe, compaction, required cleanouts, and other items.
Payment shall be made at the unit price as designed and as stated in the Bid Form for "4‖
Sanitary Sewer Pipe".
BID ITEM 333600-1 – 5,000 Gallon Septic Tank
Measurement for payment for septic tanks shall be made on a per each basis for each size of tank furnished to the site. Measurement shall include freight transport and the costs for the septic tank furnished, all labor, equipment, excavation, bedding, backfill, compaction, biotube installation, and all other items to make the septic tank complete.
Payment shall be made at the unit price as designed and as stated in the Bid Form for "5,000 Gallon
Septic Tank."
BID ITEM 333600-2 – 2,000 Gallon Septic Tank
Measurement for payment for septic tanks shall be made on a per each basis for each size of tank furnished to the site. Measurement shall include freight transport and the costs for the septic tank furnished, all labor, equipment, excavation, bedding, backfill, compaction, biotube installation and all other items except the septic tank and other government furnished items to make the septic tank complete.
Payment shall be made at the unit price as designed and as stated in the Bid Form for "2,000 Gallon
Septic Tank."
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 9 of 123
BID ITEM 333913-1 – Sanitary Sewer Manhole
Measurement for payment for installation of sanitary sewer manhole shall be paid for on a per each basis for each manhole, frame and cover installed complete. Measurement shall include removal and disposal of any existing sanitary sewer manhole, excavation, grout, risers, concrete, sawcutting, haul and disposal, traffic control, dewatering, and all other items to make this item complete.
Payment shall be made at the unit price as designed and as stated in the Bid Form for ―Sanitary Sewer
Manhole‖.
BID ITEM 333700-1– Effluent Treatment System
Measurement and payment for the Effluent Treatment System shall be made on a lump sum basis as called for on the Drawings and shall include the excavation, installation, testing and startup, all materials necessary, connections, power connection, duplex pumps as required for mixing and dosing, tanks, and all other items to make the effluent treatment system complete. Payment for this item begins at the manhole located just before the recirculation tank and ends at the coupling to the sanitary sewer at the outlet of the dosing system. Payment shall be made at the lump sum price stated in the Bid Form for ―Effluent Treatment System".
bid item 333700-2 Drainfield Trench
Measurement and payment for the drainfield trench shall be made on an actual quantity lineal foot basis as called for on the Drawings and shall include the excavation, backfill, piping, couplings, hydrosplitter, all materials necessary and installation, testing and startup.
Measurement will be from the outlet coupling of the hydrosplitter to the end of each drainfield line. Payment shall be made at the lineal foot unit price stated in the Bid Form for ―Drainfield
Trench".
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
PART 4 - MEASUREMENT AND PAYMENT (Not Used)
END OF SECTION
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 10 of 123
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY
A. Work for this project consists of:
1. Decomissioning and removal of 3 septic tanks;
2. Permitting and coordination with Oregon Department of Environmental Quality (ODEQ) regarding acceptable system design and installation.
3. Supply and installation of 3 new septic tanks and associated gravity sewer pipe and appurtenancesto connect tanks to a wastewater treatment system;
4. Supply and installation of a complete wastewater treatment system, Orenco Advantex or approved equal;
5. Supply and installation of a new drainfield as required by ODEQ for proper disposal of effluent;
6. Installation of a new control panel to control the wastewater treatment plant;
7. Preparation of operations and maintenance manuals and record drawings;
8. Other related items to complete the above work.
1.2 LOCATION
1.3 This project is located at the Blue Mountain Work Center, located approximately 1 mile east of the Highway 26/Highway 7 junction in Grant County Oregon. (approximately 13 miles east of
Prairie City, Oregon).
1.4 GENERAL SITE CONDITIONS AND WEATHER
E. The elevation of the project is approximately at 4300 feet. The construction site can experience rainfall, wind, and cold temperatures.
F. In-depth soil surveys have not been performed; however, materials in the project are excavatable, bearing primary sandy materials and sandstone rock outcroppings. Subsurface materials could include sands, gravels, silts/clays, boulders, rock, etc.
G. In-depth water table surveys have not been performed; however, if water is encountered during excavation, the Contractor shall perform adequate dewatering to keep the excavation free from water and dispose of the water without damage to property.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 11 of 123
1.5 USE OF PREMISES
A. General: Contractor shall have limited use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited by the
Government's right to perform work or to retain other contractors on portions of Project and by the use of the campers and workers at the site.
B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. Road closures will not be permitted.
C. Confine storage of materials to areas as approved by the Contracting Officer.
D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the employees and public during all construction operations. Contractor shall minimize disturbance of all areas.
E. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
1. Provide temporary barriers to protect existing trees and plants and root zones.
2. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with the Contracting Officer and remove agreed-on roots and branches that interfere with construction.
3. Do not fasten ropes, cables, or guys to existing trees.
4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
F. Existing Utilities: Notify the Contracting Officer and utility companies of proposed locations and times for excavation.
1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. Existing utilities include septic drainfields. Locate all drainfields prior to beginning work.
2. Interruption of Existing Utility Service: Notify the Contracting Officer, 48 hours in advance of any interruption of existing utilities.
1.5 MEALS AND LODGING
Meals, lodging, and restrooms will not be available at Forest Service facilities. Contractor is responsible for supplying rest room facilities to its employees.
1.6 CONSTRUCTION SEQUENCE
A. There is no specified construction sequence or season for this project.
B. Depending on conditions, normal fire restrictions may apply to activities associated with this project. Seasonal construction restrictions will be found in the solicitation.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 12 of 123
1.7 Field verification
A. Field verify all new and existing dimensions and new and existing utility locations/elevations affecting the work of this contract before ordering products.
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 13 of 123
SECTION 33 71 01
UNDERGROUND CONTROL CABLE AND POWER DISTRIBUTION
PART 1 GENERAL
1.1 DESCRIPION
A. These specifications provide for installation of underground distribution, power conductors and control cables, using trenching methods, and underground secondary service.
1.2 QUALITY ASSURANCE
A. Follow the latest edition of the National Electrical Safety Code and NEC except where local regulations are more stringent.
1.3 SUBMITTALS
A. Submit two copies of the following:
1. Conduit: Catalog data showing construction of all materials and installation procedures.
2. Splice Box: Catalog data and shop drawings.
3. Metallic Core Marking Tape: Catalog Data.
1.4 DELIVERY, STORAGE AND HANDLING
A. Protect all material and equipment to be incorporated in construction from the elements.
B. Handle conduit carefully at all times to avoid damage.
C. Seal the ends of the conduits against moisture at all times with suitable end caps.
PART 2 PRODUCTS
2.1 METALLIC CORE MARKING TAPE
A. Furnish plastic covered aluminum marking tape for power and control conductors.
B. Tape width: 2".
C. Tape thickness: .006" approx.
D. Color: Power-Yellow, Control Cable-Green.
E. Inscription: Control Cable "Caution, Buried Telephone Line".
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 14 of 123
2.2 SPLICE VAULT (Light Weight)
A. Provide Quazite Composolite vault with mouseholes part number PX1730BB16 with locking cover part number PX1730CA00 or approved equal.
PART 3 EXECUTION
3.1 INSPECTION AND INVENTORY OF BURIED POWER AND CONTROL CABLE
A. Before any backfilling operations are begun, the Contractor and CO shall jointly inspect all trenches, conduit placement, splice boxes, risers, and other construction not accessible after backfilling.
3.2 CONDUIT
A. All exposed ends of conduit shall be plugged during construction.
B. Remove burrs or sharp projections that might injure the cable.
3.3 GROUNDING
A. Grounding shall conform to Section 26 00 01.
3.4 CABLE MARKERS
A. Mark conduit location with permanent markers 200 feet maximum interval and at all changes in direction greater than 30 degrees.
B. Provide conduit direction marker as shown on drawings.
C. Install two-inch wide labeled metallic core plastic warning tape above conduit as shown on drawings.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 15 of 123
SECTION 01 33 00
SUBMITTAL PROCEDURES
1.1 DESCRIPTION
A. The work of this section consists of submittal requirements before and during construction.
B. This section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.
1.2 RELATED REQUIREMENTS
A. Closeout submittals - Section 01 77 00.
1.3 SUBMITTAL AND APPROVAL PROCEDURES
A. The following is a list of submittals that may not consist of the complete list, and may be added at the discretion of the Contracting Officer.
Section Part/Subpart SectionPart/Subpart
01 45 00 Part 1.2/B-F 33 37 00 Part 1.3
01 77 00 Part 3.4/A 33 39 13 Part 1.2
01 78 23 All 31 23 33 Part 1.2
33 71 01 Part 1.3/A 03 33 00 Part 1.3
33 31 00 Part 1.2 33 36 00 Part 1.3
B. As specified in the individual sections, forward submittals to Contracting Officer at least 15 days before need for approval. Unless a different number is specified, submit one reproducible original and two copies of each shop drawing, two copies of manufacturer's catalog sheets (cut sheets), two specimens of each sample, and two copies of all other submittals requested.
1. Shop Drawings: Include the following information with each copy of shop drawings:
a. Firm or entity that prepared each submittal clearly at the top of each submittal. Name and address of the prime Contractor
b. Project name.
c. Date.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 16 of 123
d. Date of revisions (when applicable).
e. Professional Engineer‘s Stamp and Signature where required.
f. Contractor's certification that shop drawing has been checked for compliance with contract documents.
g. Number and title of appropriate Specification Section and drawing number and detail reference as appropriate.
h. Details of fabrication, assembly and erection including connections and engagement to contiguous work.
i. Materials used and manufacturer‘s information.
j. All required dimensions.
k. The term "by others" shall not be used. All work to be performed by others shall be identified by Contractor or subcontractor name, discipline, or trade.
2 Samples: Samples shall be large enough to illustrate clearly the functional characteristics.
3 Manufacturers' Catalog Sheets: Submit only pertinent pages; mark each copy of standard printed data to identify specific products proposed for use.
4 Manufacturer's Installation Instructions: When contract documents require compliance with manufacturer's printed instructions, provide one complete set of instructions for
Contracting Officer and keep another complete set of instructions at the project site until substantial completion.
C. Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.
D. Approved Equals:
1. For each item proposed as an "approved equal," submit supporting data, including:
a. Drawings and samples as appropriate.
b. Comparison of the characteristics of the proposed item with that specified.
c. Changes required in other elements of the work because of the substitution.
d. Name, address, and telephone number of vendor.
e. Manufacturer's literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
Describe availability of maintenance service, and state source of replacement materials.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 17 of 123
2. A request for approval constitutes a representation that Contractor:
a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
b. Will provide the same warranties for the proposed item as for the item specified.
c. Has determined that the proposed item is compatible with interfacing items.
d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
e. Waives all claims for additional expenses that may be incurred as a result of the substitution.
3. Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material.
E. Coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward submittals that are related to or affect one another as a package to facilitate coordinated review. Each transmittal shall contain only data specific to that individual submittal.
F. Submittal Identification:
1. All sets of shop drawings, manufacturer's catalog sheets, samples, and other documents submitted to the Contracting Officer must have the identification information uniquely identifying the submittal, manufacturer, date, specification section stamped on the submittal.
2. Identification information of the submittal and specification section shall be applied to the bottom right margin on each page. Identification information on samples shall be applied to the most readily visible area on the sample or on tags attached to sample.
G. Submittal Numbering:
1. Number each submittal consecutively.
2. For re-submittals use the original submittal number, plus a letter suffix beginning with A.
3. Additional re-submittals of the same item shall contain the original number with the next consecutive letter.
H. Contracting Officer's Review:
1. Submittals will be returned disapproved without technical review if identification information is missing, not filled in, or if placed on the back of the submittal; an incorrect number or format of submittals is provided; the transmittal form is incorrectly filled out;
submittals are not coordinated.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 18 of 123
2. Any work done or orders for materials or services placed before approval shall be at the
Contractor's own risk.
3. After reviewing submittals, the Contracting Officer will return one copy of applicable
(marked up) submittal sheets to the Contractor. Shop drawing review notations will be returned on the reproducible original shop drawing. All other submitted items will be retained. The Contractor is responsible for producing additional copies for his/her own use.
4. The returned submittal will be marked in one of three ways as defined below:
a. APPROVED: Acceptable with no corrections.
b. APPROVED WITH NOTATIONS: Minor corrections or clarifications required. All comments are clear and no further review is required. The Contractor shall address all review comments when proceeding with the work.
c. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The Contracting Officer will identify the reasons for disapproval. The Contractor shall revise and resubmit with changes clearly identified. The Contractor shall allow an additional 15 days for CO approval of resubmittals.
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 19 of 123
SECTION 01 45 00
QUALITY CONTROL
A. The work of this section consists of preparing and executing a quality control program.
B. Testing for this project shall include concrete testing and all pipe leakage testing, and start-up testing on all systems, and leakage testing for all new septic tanks.
1.2 SUBMITTALS
A. As specified in Section 01 33 00.
B. Quality Control Plan:
1. At the time of the preconstruction conference, submit for approval a written Contractor
Quality Control (CQC) plan.
2. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.
3. The Government reserves the right to require changes in the plan during the contract period as necessary to obtain the quality specified.
4. No change in the approved plan may be made without written concurrence by the
Contracting Officer.
5. The plan shall include:
a. A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.
b. Methods of performing, documenting, and enforcing quality control of all work.
c. Methods of monitoring and controlling environmental pollution and contamination as required by regulations and laws.
d. Concrete testing and septic tank leakage testing.
C. Contractor's Quality Control Reports: Submit with invoice showing all inspections and tests on the first workday following the date covered by the report.
D. Test Reports:
1. Submit Test Information Sheets with Quality Control Daily Reports when Testing has been done.
2. Submit failing test results and proposed remedial actions within two days of noted deficiency.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 20 of 123
E. Off-Site Inspection Reports: Submit prior to shipment.
F. If the CQC plan and Quality Control Reports are not submitted as specified, the Contracting
Officer may retain all payments until such time a plan is approved and implemented.
1.3 QUALITY ASSURANCE
A. General:
1. The quality of all work shall be the responsibility of the Contractor. Testing shall be the responsibility of an independent testing laboratory
2. Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.
3. Test reports shall be completed by person performing the test.
4. The Contracting Officer may designate locations of tests.
B. Quality Control Staff:
1. The Contractor's Quality Control Supervisor may also perform the duties of Project
Superintendent.
C. Testing Laboratory and Equipment:
1. Employ certified independent laboratories to perform sampling and testing. The testing laboratory organization shall be certified for the type of testing work to be done.
2. All measuring devices, laboratory equipment, and instruments shall be calibrated at established intervals against certified standards in accordance with National Bureau of
Standards requirements. Upon request, measuring and testing devices shall be made available for use by the Government for verification tests.
PART2 PRODUCTS NOT USED
PART3 EXECUTION NOT USED
3.1 OFF-SITE CONTROL
A. Items that are fabricated or assembled off-site shall be inspected for quality control at the place of fabrication.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 21 of 123
3.2 ON-SITE CONTROL
A. Initial Phase:
1. As soon as work begins, inspect and test a representative portion of a particular feature of work for quality of workmanship.
2. Review control testing procedures to ensure compliance with contract requirements.
B. Follow-Up Phase: Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.
3.3 DOCUMENTATION
A. Maintain Quality Control Reports and Test Report Information Sheets of quality control activities and tests.
3.4 ENFORCEMENT
A. The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the Contracting Officer.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 22 of 123
SECTION 01 57 00
TEMPORARY CONTROLS
1.1 DESCRIPTION
A. The work of this section consists of providing temporary controls.
B. The Contractor shall coordinate all work with the requirements in the National Environmental
Policy Act (NEPA) documents for this site in addition to the requirements listed in these specifications and shown on the drawings. Refer to Division 0 of this contract for additional information.
A. As specified in Section 01 33 00.
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION
3.1 HOUSEKEEPING
A. Keep project neat, orderly, and in a safe condition at all times.
B. Wet down or cover stockpiles and dry materials with tarps to prevent blowing dust. Covers shall be adequately anchored for all wind conditions.
C. Do not store rubbish or volatile waste on-site. Dispose of all waste materials as specified or according to State requirements.
D. Utilize excavated material as soon as possible.
3.2 DISPOSAL
A. Stockpile excess excavated material (including rocks and boulders) that cannot be used in construction at staging area shown on the drawings.
B. Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of off Government property. The Contractor shall dispose of all vegetative waste and excess excavation approved by the Contracting Officer at the site designated on the drawings.
C. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the Forest Service property. Do not burn or bury refuse.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 23 of 123
3.3 AIR AND WATER POLLUTION CONTROL
A. Provide and install all erosion control fencing and other measures as necessary.
B. All chlorinated water shall be dechlorinated and other contaminants removed prior to discharging to any storm drainage or natural waterways. All discharges of water from this project shall be approved by the Contracting Officer.
C. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.
D. Do not dispose of volatile wastes or oils in storm or sanitary drains.
E. Do not allow waste materials to be washed into streams or bodies of water.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 24 of 123
SECTION 01 77 00
PROJECT CLOSEOUT
A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.
A. See 3.4 of this Section.
PART 2 PRODUCTS
2.1 CLEANING MATERIALS
A. As recommended by the manufacturer of surface to be cleaned or refinished.
3.1 CLEANING/REFINISHING
A. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces.
Pick up all construction debris from the site.
B. Apply touch-up paint or otherwise refinish surfaces that are damaged due to work of this contract to original condition.
3.2 PROJECT RECORD DRAWINGS
A. Maintain one complete full-size set of contract drawings and one full-size set of vendor-supplied drawings. Clearly mark changes, deletions, and additions, to show actual construction conditions. Show additions in red, deletions in green, and special instructions in blue. Final locations of all sewer lines and tanks shall be identified by dimensions from permanent structures (building corners, signs, etc.).
B. Keep record drawings current. Make record drawings available to the Contracting Officer for inspection at any time and at invoices. If project record drawings are not current, the
Contracting Officer may retain an appropriate amount of the progress payment. At the completion of the project the Contracting Officer shall review the redline markup drawings for preparation of the electronic files.
C. On completion of the total project, modify existing electronic design drawings to reflect the record drawing markups. Submit both electronic and marked up project record drawings.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 25 of 123
Include all shop drawings, sketches, and additional drawings that are to be included in the final set, with clear instructions showing the location of these drawings. All drawings shall be both hardcopy and electronically submitted. Design drawings are in AutoCAD Version 2010.
3.3 OPERATOR TRAINING
A. Provide a minimum of 8 hours of operator training for the new systems installed including the wastewater treatment plant and the septic tanks.
B. Use the Operations and Maintenance manuals as training tools during operator training.
3.4 CLOSEOUT SUBMITTALS
A. Submit before final inspection request.
1. Project Record Drawings: As specified above.
2. Guarantees and Bonds: As specified in individual sections.
3. Spare Parts and Materials: As specified in individual sections.
4. Operations and Maintenance Manuals: As specified in section 01 78 23.
5. All keys, locks, valve keys, spare parts and instruction materials as required or requested by the Contracting Officer.
3.5 SUBSTANTIAL COMPLETION AND FINAL INSPECTION
A. Submit written certification that project, or designated portion of project, is substantially complete, and request in writing a final inspection. Contracting Officer will make an inspection within 10 days of receipt of request. Certification shall include a listing of significant items that are not complete in accordance with the contract and shall indicate the schedule date for the completion of these items. Upon receipt of written certification project is substantially complete, the Contracting Officer will proceed with inspection within 10 days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.
B. If, following final inspection, the work is determined to be substantially complete, Contracting
Officer will prepare a list of deficiencies to be corrected before final acceptance and issue a
Letter of Substantial Completion. Contractor shall complete the work described on the list of deficiencies within 30 calendar days, as weather permits. If the Contractor fails to complete the work within this time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for reinspection costs.
C. If, following final inspection, the work is not determined to be substantially complete, Contracting Officer will notify Contractor in writing. After completing work, Contractor shall resubmit certification and request a new final inspection. All reinspection costs may be charged in accordance with the Inspection of Construction clause of the contract.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 26 of 123
3.6 ACCEPTANCE OF THE WORK
A. After all deficiencies have been corrected, a Letter of Acceptance will be issued.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 27 of 123
SECTION 01 78 23
OPERATION AND MAINTENANCE DATA
A. The work of this section consists of furnishing operation and maintenance data manuals.
1.2 RELATED WORK
A. Project Record Drawings - Section 01 77 00.
1.3 SCHEDULING
A. At start of project, begin accumulating operation and maintenance data and initiate an index.
Install and index all data in binders within 30 days after delivery of items. As custom written data and test results are produced, add them to the operation and maintenance data file.
B. Keep operation and maintenance data current. Make operation and maintenance binders available to the Contracting Officer for inspection at the time of monthly progress payment requests. If operation and maintenance binders are not current the Contracting Officer may retain an appropriate amount of the progress payment.
C. Before scheduling a final inspection, furnish two complete sets of operation and maintenance data to Contracting Officer for review. Should Contracting Officer find manual to be substantially incomplete, the final inspection will be delayed.
D. Within 30 days following receipt of review comments, deliver two completed sets of
Operation and Maintenance data.
2.1 BINDERS
A. White, commercial quality, hard back, three-ring, 2-inch maximum ring size, lever-locking type slant ring, with clear window pockets on front and side.
2.2 INDEX SYSTEM
A. Index sheet with mylar reinforced edges at binder holes and tabbed divider sheets with mylar reinforced edges and pre-printed numbered tabs aligned with numbers and title lines on index sheet.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 28 of 123
3.1 FORM
A. Provide two complete sets of data.
B. Number multiple binder volumes consecutively.
C. Cover Sheet: Identify the project title, location, park, contract number, prime contractor's name and address, date of substantial completion, and binder volume number. Insert cover sheet into clear plastic view pocket on front of binder. Insert sheet with project title and
"Operation and Maintenance" into side clear plastic view pocket.
D. Index System: Organize data into sections by common subjects and subsystems. Place a consecutively numbered tabbed divider sheet in front of each section. Place index sheet at the beginning of each binder, listing sections by subject name. If multiple binders are used, place a table of contents of all data provided behind the index sheet in each binder.
E. Data: Fill binders to no more than 75 percent of capacity. Punch holes shall not obscure any data. Normal sheet size shall be 8-1/2 inches by 11 inches. Fold oversize sheets and insert them in 8-1/2 by 11-inch clear pocket sheet protectors placed in binders. When the contents of a single tabbed section covers more than one item, provide colored paper sheets to separate the data for each item.
1. Manufacturers' Data: Provide originals for color or copyrighted data. Black and white data may be originals or clean, good quality reproductions. Where originals are printed on both sides of the page, reproductions shall also be printed on both sides of the page.
Copies produced by facsimile transmission and sheets with stamps, such as submittal approval stamps, will not be acceptable. Include only sheets that apply to items installed;
cross out inapplicable data.
2. Vendor Furnished As-Built Drawings: Maximum 24-inch by 36-inch sheets with minimum character or lettering size of 1/8 inch. Reduced-size reproductions may be provided instead of full-size drawings if the reproductions are clear and legible. If reduced-size drawings are used, identify as "REDUCED SIZE" and provide graphic scales, if applicable.
3. Custom Written Data: Typewritten text, supplemented by drawings and schematics necessary to describe systems adequately.
4. Equipment Data Sheet: Typewritten data, using form at the end of this section.
5. Schedules: Clean, typewritten schedules reflecting final, as-installed conditions. Hand-written mark-ups of schedules submitted earlier are not acceptable.
6. Data that is poorly reproduced or in any way illegible will be rejected.
AG-0489-S-10-0448 Blue Mountain Work Center Septic System Page 29 of 123
3.2 CONTENT
A. Engineering Drawings.
B. Manufacturers' Published Data: Provide all available data, including installation and operating instructions, parts lists, electrical and mechanical schematics, control circuit documentation, performance data, safety instructions, cleaning and care instructions, and illustrations and instructions for maintenance, including lubrication, disassembly and repair, cleaning, and service. Indicate catalog numbers, sizes, colors, options, and other information pertaining to the products furnished which would be required when ordering replacements. For equipment assemblies, provide data for each separate item of equipment furnished as part of the assembly.
C. Equipment Data Sheets: For each item of equipment included in the operation and maintenance data, provide an Equipment Data Sheet using the form at the end of this section.
For equipment consisting of both a driven machine and a driver (for example, a pump and a motor), the equipment data shall cover both the driven machine and the driver. For similar type equipment (for example, multiple exhaust fans of the same model and type), provide a single equipment data sheet with an attached schedule listing the individual equipment items.
D. Vendor Furnished As-Built Drawings: Provide for each electrical and each mechanical control system.
1. For each control system, provide control circuit schematic drawings. Identify each wire and terminal block number. Show terminal numbers on all control devices. Show control wires and devices remote from the control panel.
2. For each control panel, provide a general arrangement drawing showing location of each control component and terminal block on the panel front and interior. Include a materials list of all panel-mounted control components as well as field-installed control components remote from the panel, identifying components, manufacturer, model number, and initial set points or sensing ranges of devices where applicable.
3. For packaged equipment systems, provide general arrangement drawings showing interrelationships of the various items of equipment and components.
4. In addition to the control wiring schematic, provide a power wiring schematic drawing showing the power flow to each motor. Identify each power conductor. Show all overcurrent protection and motor starting devices.
E. Schedules: Provide one copy of material and equipment schedules, as listed in the individual sections, in the appropriate sections of the manual.
F. Warranties: Place a copy of each manufacturer, supplier, and installer warranty extending for a period greater than one year in a single separately identified tabbed section of the manual.
G. Test Results: Include in the operation and maintenance data copies of test…
This is the start of the file's text. The full file is on GovTribe.