About this file

Revised Statement of Work - Amendment 1 JRO - page 2

View the file

Other files

File Type Posted
SF-30 AMENDMENT 1 JRO 5-5-10 Page 1.docx DOCX document
Questions and Answers JRO Page 3.doc DOC document
J-1 Wage Rate Determination WD 05.pdf PDF
J-2 Bid Package JRO Interpretative Exhibit.doc DOC document
InterpretiveExh Solicitation 4-14-10.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-0489-S-10-0401

Amendment 1 JRO Interpretive Exhibit

Bolded and underlined items are changes in the following “SECTION C” and now reads:

REVISED STATEMENT OF WORK (5/5/2010)

C-1 SCOPE OF WORK – ITEM 0001

B. (5) Changeable Display & Media Center: One (1) set of nine - 24” (609.6mm) x 36” (914.4mm) graphic interpretive panels to be attached as outlined in B.3 above, Contractor to collaborate with Forest Service Interpretive staff to populate graphic panels which will interpret biological, cultural and partnership subjects;

C-2 Scope of Work – Optional Items

Item 3 Accessibility Signs:

(3) Information (audio handset) sign, 63.5” (1612.9mm) wide and 16.3125” (414.3mm) high, text to be reviewed and corrected for grammatical errors, text and flags for Russian and Mandarin languages to be added to existing 4 languages and visually impaired assistive content. Sign must constructed of flexible translucent material as to match slight curvature of wall and to allow for illumination from behind, photograph of existing sign to be furnished as guide.

C-3 PERFORMANCE DATE

The period of performance for construction of Item 1 is about June 15, 2010 with a completion date of 100 days after. The time stated for completion includes final clean up of premises. The optional items awarded under this contract shall be completed by October 31, 2011.

END OF SECTION